COMEX Daily Ops Plan ver. 3 – 24 Aug. 2014. Representative Daily Schedule - Flight Day 2 Time (Zulu) Time (PDT) Daily Schedule Flight Day 13000600 HyspIRI.

Slides:



Advertisements
Similar presentations
Crew Compliment. OBJECTIVES The importance of Safety & the effects of reduce crew.
Advertisements

RUNWAY 28 EXTENSION Stakeholders Meeting April 17, 2013.
NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12 Hurricane and Severe Storm Sentinel (HS3) Science Campaign 2012.
Student Hands On Training I (2009) Launch Logistics Launch Logistics.
26th Operational Weather Squadron Fly – Fight – Win SrA Jinny Liechti 26 th Operational Weather Squadron Air Force Aviation Weather: A Case Study Approved.
INTERNATIONAL H 2 O PROJECT (IHOP_2002) FLIGHT PLANNING PLAYBOOK.
Omega Tanker (K-707) Air Refueling Procedures Brief
Company Forms, Records & Administrative Procedures Westwind Air Service.
Time Time is used to compare the durations of events and then intervals between them.
Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 23 Oct 2013 ATTREX
Weather Briefing, Current situation Convection and cloud forecasts through Sunday Local forecast through Monday Mesoscale Model products.
Weather briefing, 11 AM Contributions from Lenny Pfister, Evelyn Quiros, Chuck Bardeen, and Ana Maria Duran.
Overview of integrated science goals, flight planning, and formation flying Brian Toon.
HyspIRI Airborne Preparatory Mission Large Area Mapping In California Benefits to Remote Sensing of the Delta
CASARA NATIONAL NAVIGATOR COURSE Introduction.
1 April Virgin Galactic Spaceflight Safety Assurance Officer Jeff Peters Space Weather Workshop April The Future of Space Tourism and Space.
A FLIGHT INSTRUCTORS GUIDE FOR SOLOING A STUDENT PILOT.
Planning update (January 2011). Planning and sub-groups: Project Africa Team.
1 Private Pilot Single Engine Land Training Requirements Jeff Carlson GBA July 2004.
Use Case Diagram. # 1 Provide Pre-flight Services Actors: Pilot, External Data Providers, FBO, FAA Goal Level: User Level Main Success Scenario 1.Client.
ASIANA AIRLINES FLIGHT 214 BY DANIEL LEE. AIRCRAFT: BOEING 777.
Summary of KO meeting With some subsequent developments.
Deepwater Horizon Weather and Sea Support EventDateTime ExplosionApril 20 – 21, 2010overnight First request for weather support (NOAA/USCG) April
Office of Aviation Safety Pyote, Texas March 21, 2004.
Internet, T-PARC Operations Center NPS, Monterey CA Ops. Coordination Science Team Facility Status In-field Analysis Forecast/Nowcast Data Ingest T-PARC.
7-1 Design of UAV Systems Sorties ratesc 2002 LM Corporation Lesson objective - to discuss Sortie rate analysis including … - Mission planning and preparation.
AIRTANKER BASE MANAGER (ATBM).
1 International Association of Oil and Gas Producers Formerly E & P Forum OIL INDUSTRY HELICOPTER OPERATIONS and SAFETY PERFORMANCE REVIEW –
Functional Check Flight Symposium EMBRAER PERSPECTIVE.
Flight Planning 1.Master clock is outside the flight planning room (hangar) Mini Air Observer. 2.Master time is GPS time plus 2 hrs = Local time. 3.Times.
Missed-Approach or Go-around: A Maneuver conducted by pilot when instrument or visual approach cannot be completed to a landing..
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
HS3 Science Lessons. Aircraft The inability of AV-1 to get over storms is a critical shortcoming. Some PIs were funded to study the results from AV-1.
5 Ops Objectives. Decisions/Things to Keep in Mind (as a forecaster) Mission has to decide where to fly and what category of objective they’re fulfilling.
US IL Flying Club June 1 st, VERSION 4.
Provide a thorough preflight briefing. Learn the basics on this airplane and…
BRAZILIAN AIR FORCE. WELCOME TO CRUZEX V This Briefing is: Unclassified.
Case of June , Dropsonde Jet Lear Jet: (model 35A?) Ceiling: ~ 43,000 Feet (roughly 30 min to 37,000 ft.) Duration: 6 hours; option to refuel.
Project flight schedule Monday 21 Nov – Friday 23 Dec 5 weeks – 150 flight hours Closed Thursday 24 Nov – Sunday 27 Nov Normal open hours, Monday - Friday:
Falcon coordinator: Martin Weissmann Aircraft manager: Andrea Hausold Falcon Steering Committee (SC): M. Weissmann, P. Harr, T. Nakazawa, S. Jones, H.-S.
Scenario on airport works Session 5 Presentation 1.
Definitions What it’s about Teaching it Assessing it.
NAME 2004 Field Operations and Procedures NAME Special Session Field Operations Center Concept: Define requirements for, and conduct the day-to-day operations,
Aeronautical Facilities The term aerodrome refers to any area of land or water designated for the arrival, departure, movement and servicing of aircraft.
Communications Plan: Ji Young Kim, Chul Han Song, Saewung Kim, and Jim Crawford.
Dynamics of Pilot Training
Resources - Agenda Training - In Scope Thinking ahead Envisioning an outcome Communications Basic plans Risk identification Issue Identification CAP.
I4005 TIMEHACK IMSAFE / ORM DOR / TTO POLICY JUNK JACKET REVIEW READ FILE / QUALIFICATIONS.
WMIRS WMIRS Terry Raymond Joe Hall Joey Barton BUILDING CAP’S TEAM... FOR TODAY AND TOMORROW.
Event Mission MPTS INTERMEDIATE E-2/C-2 AND AJET CQL 4101 T-45 CARRIER QUALIFICATION LANDING SAFE- FOR-SOLO 0.7 HOURS/X.
Event Mission MPTS AJET AN 4601 – AN 4602 T-45 ADVANCED AIRWAYS NAVIGATION SOLO 1.2 HOURS/X.
Welcometo GEEN 2850 / 4850 ASTR 2840 Independent Study Colorado Space Grant Consortium April 16, 2001.
Mr. Lagomarsino Money Power with Technology Applications.
THE CFI PROFESSIONALISM. For once you have tasted flight you will walk the earth with your eyes turned skywards, for there you have been and there you.
Albert Lea Airport Contest Operations Briefing Welcome and General Remarks Launch –Procedures –Re-light Landing.
Saif Yousef Al-Ali H H Spoken Academic Communication Aircraft Incident.
FAA Flight Standards AFS-220/430 FPAW 2017 Summer
ABN PROC - ECAM PROCEDURES - ECAM PHILOSOPHY
The Flight Profile –From Takeoff To Touchdown
TRCC SAFETY Presented by: ROB HOARD.
DODO (Dakar) logistics
Cadet Orientation Flight Procedures
I4105 TIMEHACK IMSAFE / ORM DOR / TTO POLICY JUNK JACKET REVIEW READ FILE / QUALIFICATIONS.
I4102 TIMEHACK IMSAFE / ORM DOR / TTO POLICY JUNK JACKET REVIEW READ FILE / QUALIFICATIONS.
Students, Please utilize this as a starting point for your own case study, do not just use the same incident/slides. Use true bullet-points to guide the.
Ops Specs The performance data for takeoff and landing an aircraft can be obtained from the aircraft's flight manual or pilot's operating handbook. The.
Civil Air Patrol Advanced Communications User Training
Doug Anderson (FAAM) 11:15-11:30: Status of hotels/transport etc
Cockpit/Crew Resource Management
Presentation transcript:

COMEX Daily Ops Plan ver. 3 – 24 Aug. 2014

Representative Daily Schedule - Flight Day 2 Time (Zulu) Time (PDT) Daily Schedule Flight Day HyspIRI morning Wx/Sat Update (Latest) and ER-2 Go No-go. Determine target times (t1, t2) for ER-2 coordination COMEX Science Target Decision & Twin Otter Aircraft/Instrument Status Go-no-go. Revisit target(s), wind direction, topography factors. Coordinate with COMEX aircraft Twin Otters, ER-2 takeoffs, approximate, could be later Alert AJAX, leaving target for landing approach AJAX begins launch procedures pending confirmation of alert Twin Otters land & refuel, mid-day, approximate. Notify AJAX Alpha Jet engine start, approximate; target-dependent Alpha Jet takeoff Alpha Jet arrives target, begins spiral ~10 min duration Alpha Jet departs Twin Otters cleared for takeoff for PM target Weather Brief / Next day flight target selection / Go no-go / takeoff time Landing #2, Twin Otters De-brief and review next-day flight plans. All COMEX pilots represented.

Representative Daily Schedule – Non-Flight Day 3 Time (Zulu) Time (PDT) Daily Schedule Flight Day Science team tag up. Discuss progress toward mission objectives. Upcoming target planning Team tag up. Weather to +48hr, flight plans for ER-2 and AVIRIS-NG, instrument status, aircraft status, Go no-go, takeoff time for next day flight, etc.