S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Using Copper Water Loop Heat Pipes to Efficiently Cool CPUs and GPUs Stephen Fried President Passive Thermal Technology, Inc.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Ss Hefei, China July 19, 2011 Nuclear, Plasma, and Radiological Engineering Center for Plasma-Material Interactions Contact: Flowing.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
CFD Simulations of a Novel “Squirt-Nozzle and Water Bath” Cooling System for the RFQ.
CFD and Thermal Stress Analysis of Helium-Cooled Divertor Concepts Presented by: X.R. Wang Contributors: R. Raffray and S. Malang University of California,
Hybridization studies at Fermilab Prototype detectors –Readout chip mated to sensor –Experiences with both single dies and 4” and 6” wafers using Indium.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Extrapolating Experimental Results for Model Divertor.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Conduction & Convection.
1 Outer Tracker Mechanics, indico: May 2014, A.Onnela 21 May 2014 Thermally conductive carbon-fibre composite material for module and mechanics.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Mechanics: Status and Plans Bill Cooper (Fermilab) (Layer 1) VXD.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Update on Thermal Performance of the Gas- Cooled.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
Cavity support scheme options Thomas Jones 25/06/15.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
1st Nov 2001 Nigel Hessey SCT Endcap Structures FDR1 Endcap Requirements Brief overview of SCT Endcap Requirements layout, X0, thermal, positioning, stability.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
CLIC Prototype Test Module 0 Super Accelerating Structure Thermal Simulation Introduction Theoretical background on water and air cooling FEA Model Conclusions.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Mon. 20 October 2003 SO/EUS Proto-consortium Meeting Mechanical Design Dr Douglas Griffin 1 Solar Orbiter Extreme Ultaviolet Spectrometer Conceptual Mechanical.
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
W.O. Miller i T i VG 1 Two Pixel Configurations Under Study First: A Monolithic Integrated Structure First: A Monolithic Integrated Structure –Axial array.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Simon Kwan - FermilabCMS Tracker Upgrade Workshop – June 3, Update on the Phase 1 FPIX Half Disk Design Simon Kwan Fermilab on behalf of the USCMS.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski, B. H. Mills and M. D. Hageman G. W. Woodruff School of Mechanical Engineering Correlations for Divertor Thermal-Hydraulic.
Cavity support scheme options Thomas Jones 25/06/15 1.
LHC Collimators Phase 2 - Visit to Plansee 28th August Materials for Phase II collimators.
1 2S Module meeting, 24 September 2012 S tudies on module support inserts Refers to work by Riikka Häsä, Helsinki Institute of Physics, summer student.
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
HL-LHC-UK Thermal Shield Update Niklas Templeton 07/03/2016.
Sergio Calatroni TS/MMETS Workshop, Archamps RF Fingers for Secondary Collimators What is that? Constraints for design Choice of materials:
SPS High Energy LSS5 Thermal contact & cooling aspects
ATLAS Internal ID Service Integration
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Developing Radiation Hard Silicon for the Vertex Locator
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
End-cap Mechanics FDR Overview of the Project
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Development of a low material endplate for LP1 and ILD
Local Supports for Inclined Layout: CERN Update
Cedric Garion, TE-VSC-DLM, WP12
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Hybrid Mechanical/Thermal Design ideas
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
PANDA Collaboration Meeting
Presentation transcript:

S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001

S Temple CLRC2 End-Cap Disc Services Cooling Structures l Full details - See ATL-IS-ER-0021 l Cooling Circuit Layout »3 circuits per quadrant - corresponding to inner, middle and outer module rings »3 separate Inlets, 3 outlets are manifolded at patch panel »Outer and middle module Circuits - Two point cooling »Inner module circuit - Single point cooling »Bend radii (inner) kept to 5 times OD i.e mm l Cooling Component Materials/Joining Techniques »C-C cooling blocks »CuNi pipe - 3.6mm ID, 70 µm Wall »Cu plating (sputter coat + electroplate) of cooling blocks enables soft soldering to cooling pipe

S Temple CLRC3 l Mechanical Requirements »Position modules to a positional tolerance of 134 microns (diameter) in the R-phi direction, for one module relative to its neighbour »Provide co-planar mounting surfaces for modules »Minimise forces transferred to the support structure i.e. carbon fibre disc »Operational for 10 years »Lowest possible mass l Thermal Requirements »To ensure the highest temperature of any part of the silicon on a module doesn’t exceed -7 °C End-Cap Disc Services Cooling Structures

S Temple CLRC4 l Cooling Pipe Circuit Design »CuNi material chosen for its excellent resistance to corrosion, and its excellent solderability »‘Wiggly’ pipe Layout reduces forces on disc from thermal contractions and pipe manufacturing tolerance –Thermal Contraction Forces Forces calculated using an FE model, using following material properties and boundary conditions : E=152 GPa,  = 12e-6/K,  T=50K –Pipe Manufacturing Tolerances Deviation of pipe bend centres from nominal positions kept to a minimum, through tooling design In addition stress relieving of manufactured circuits is proposed - testing is planned in next round of prototyping End-Cap Disc Services Cooling Structures

S Temple CLRC5 Inner Circuit End-Cap Disc Services Cooling Structures

S Temple CLRC6 Outer Circuit End-Cap Disc Services Cooling Structures

S Temple CLRC7 Middle Circuit End-Cap Disc Services Cooling Structures

S Temple CLRC8 l Cooling Pipe Prototyping »First prototype - Inner cooling circuit for system test »Old circuit design - Internal bend radii of 14mm »Ice used as filler material »Custom made pipe bender designed and manufactured »Manufactured at RAL End-Cap Disc Services Cooling Structures

S Temple CLRC9 l Cooling Pipe Prototyping (Cont’d) »Second prototype - Single U shaped bend »Internal bend radii of 20mm - 5 x OD »Cerobend used as filler material »Swaged ends - enables low mass joining of pipes »Manufactured by established pipe bending company End-Cap Disc Services Cooling Structures

S Temple CLRC10 l Cooling Block Design »Primary Cooling Block Thermal Design –C-C material chosen for good thermal conductivity W/m 2 K (fibre direction), 50 W/m 2 K (transverse direction) –Fibre orientation optimised –Straight split corresponding to hybrid and silicon –Further details see thermal performance Mechanical Design –Machined module location boss –Planar module mounting surface wrt block mounting surface –Accurate cooling block height End-Cap Disc Services Cooling Structures

S Temple CLRC11 l Cooling Block Design (Cont’d) »Second Point Cooling Blocks Thermal Design –C-C material chosen for good thermal conductivity W/m 2 K (fibre direction), 50 W/m 2 K (transverse direction) –Fibre orientation optimised Mechanical Design –As primary cooling block »Second Point Mounting Blocks Thermal Design –No thermal requirements - Made from low mass PEI polymer Mechanical Design –As primary cooling block End-Cap Cooling Structures Cooling Block Design

S Temple CLRC12 l Cooling Block Prototyping »Two prototyping exercises (old and current design) »Several manufactured, metrology checked to assess ability to machine key features within appropriate tolerances –3mm OD location boss –Parallelness between bottom and top surfaces –Block height dimension End-Cap Cooling Structures Cooling Block Design

S Temple CLRC13 End-Cap Disc Services Cooling Structures l Cooling Block Prototyping (Cont’d) »Current cooling block design metrology results »Improvements to design for machining operations simplification identified

S Temple CLRC14 l Joining of C-C Blocks to Cooling Pipe »Soldering of cooling blocks to pipe –Good thermal joint –Good mechanical joint - Soldered joint sample (using swaged end) undergone helium vacuum leak test –Standard SnPb (60/40) solder with non-corrosive Castolin 197 flux. –Requires Cu plating of C-C block »Cu Plating of C-C Blocks –Plating trials show good adhesion to C-C base material achieved by : Cleaning, Cu Sputtering, Cu Electroplating and Au Flash (to prevent copper oxidisation) –15 micron Cu plating followed by 2 micron Au flash End-Cap Disc Services Cooling Structures

S Temple CLRC15 l Cooling Structure Precision Assembly »To achieve positional tolerances required a precision assembly technique is performed during the disc services to disc assembly stage »This involves a precision rotary stage (r-phi) and an alignment arm (providing radial position) »Details see ATL-IS-ER-0022 End-Cap Disc Services Cooling Structures

S Temple CLRC16 l Cooling Structure Precision Assembly (Cont’d) »Blocks are required to be positioned in r-phi with a positional tolerance of 66 microns - Out of 134 micron error budget »Results show this is readily achievable using this method End-Cap Disc Services Cooling Structures

S Temple CLRC17 l Thermal Performance »Extensive prototype testing and thermal simulation carried out on the Baseline Design (see ATL-IS-ER-0009) –Full cooling quadrant (3 circuits) manufactured and tested on evaporative cooling rig –Dummy thermal module mounted on sector and tested –Successfully demonstrated a coolant temperature of -20 to -22 °C was sufficient to keep the inner module below - 7 °C. –Design consisted of Aluminium Alloy cooling blocks joined to Aluminium cooling pipes. –Effect of material changes therefore need to be assessed End-Cap Disc Services Cooling Structures

S Temple CLRC18 l Thermal Performance (Cont’d) »Assessment of cooling block material change –C-C block substituted into the simulation. Again boundary conditions W/m  C (7.5 W, 1W) –Minimal change on silicon side. Better performance on hybrid side. Al T sil =-11.5°C C-C T sil =-11.3°C Al T Hyb =-6.9°C C-C T Hyb =-8.4°C End-Cap Disc Services Cooling Structures

S Temple CLRC19 l Thermal Performance (Cont’d) »Assessment of cooling pipe material change –Reduction in thermal conductivity and wall thickness results in reduction of convective heat transfer area. –However as htc increases with heat flux, this effect will be decreased. –Small scale prototype testing on an evaporative C3F8 cooling rig is planned End-Cap Disc Services Cooling Structures