ALARA Programs & Occupational Dose Trend in Wolsong NPP Korea Hydro & Nuclear Power Co., Ltd Wolsong Nuclear Power Plant Unit 3&4.

Slides:



Advertisements
Similar presentations
MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES.
Advertisements

Health and Safety Committees RENZO BERTOLINI Canadian Centre for Occupational Health and Safety.
14th Annual RETS/REMP Workshop June 28-30, 2004 U.S. Nuclear Power Sister Plant Radiological Effluent Release Comparisons J.T. Harris 1,3, D.W. Miller.
1 August 30-31,2010 Kyushu Electric Power Co.,Inc. Nuclear Power Operatio n Dept. Masahiro Yoshinaga Approach for dose reduction in Sendai NPS August 30-31,2010.
CCTV System for Radiation Work Management Yonggwang NPP Unit 5 & 6.
ISOE Information System on Occupational Exposure: An Overview Brian Ahier, Ted Lazo (ISOE Joint Secretariat, OECD Nuclear Energy Agency) 2007 Asian Regional.
ISOE Asian ALARA Symposium September, 2010 Recent Regulatory Activities to Improve ALARA Performance of Nuclear Power Plants in Korea Kyu Hwan Jeong Korea.
2010_ISOE_Asian ALARA Symposium Current Status of Radiological Protection in NPPs of Korea Byoung-il, Lee Korea Hydro & Nuclear Power Co.,
1 INTERNAL EXPOSURE AT CERNAVODA NPP Vasile Simionov, Catalina Chitu “CNE Cernavoda” NPP, Romania 2008 ISOE INTERNATIONAL SYMPOSIUM TSURUGA, JAPAN, NOVEMBER.
Industrial Ventilation - A major control measure Dr. AA, UTM.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
IAEA International Atomic Energy Agency Regulations Part II: Basic Concepts and Definitions Day 8 – Lecture 5(2)
MODULE “STRATEGY DEVELOPMENT”
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Protection Against Occupational Exposure
USC Health and Safety Supervisor Training November 24 th and 25 th, 2011 Health & Safety Refresher PART 3.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
1 CHCOHS312A Follow safety procedures for direct care work.
Tritium Release Reduction based on Release Trend Analysis JASON SHIN Korea Hydro & Nuclear Power co.
RMS alarm under IHA decontamination Shin-Kori Nuclear Power Plant Korea Hydro & Nuclear Power.
Wolsong NPP II KHNP JASON SHIN Korea Hydro & Nuclear Power co.
1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety.
KINS Analysis on Occupational Exposure of Radiation Workers in Korea by KISOE 2013 ISOE International ALARA Symposium Tokyo, Japan, August, 2013.
Radiation Safety Management KHNP Lee Eung-Il HANUL Unit4 Steam Generator Replacement.
1 TEPCO’s ALARA Program (Basic Policy of Mid- and Long- Term Exposure Reduction) Toshiyuki HAYASHIDA Tokyo Electric Power Company Radiation Protection.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Development of Cyber ALARA Program 2012 ISOE Asian ALARA Symposium Choi, Hoon Radiation Health Research Institute Korea Hydro-Nuclear Power Company.
Comprehensive Asset Protection Each school district shall develop, implement, and maintain a comprehensive asset protection plan for every school building,
Vincent MASSAUT 10/10/ EFDA Task TW6-TSS-SEA 2.1 Occupational Radiation Exposure - ALARA in ITER: further refinement Kick off meeting Garching, 10/10/2006.
1 Dose reduction actions in Tsuruga-2 NPP Hiroshi WADA, Yuuichi HAMANAKA, Masayuki FUKUDA Tomomi YOSHINAGA, Eiji SANEHIRA,Masahiro YANO, Yasuo UNI, Kazushige.
1 TEPCO’s Challenges for Occupational Exposure Reduction -Installation of Additional CF in Fukushima Daiichi NPP- Shunsuke HORI, Akira SUZUKI Tokyo Electric.
Table of Contents  General Description  Concept of RX Vessel and Location of Defect  Radiation Dose Control  Repair Schedule of Bottom Header Defected.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Improvement of TEPCO’s ALARA Process Shiro TAKAHIRA Tokyo Electric Power Company Radiation Protection Group ISOE-ATC Symposium October 12, 2006, Yuzawa,
Procedure Writing ALARA Radiological Safety and Response RPT-243-PE-2.
Technical Meeting on Milestones for nuclear power infrastructure development Radiation Protection Khammar Mrabit Head, Regulatory Infrastructure and Transport.
adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans.
Korea Institute of Nuclear Safety – 5. IAEA/RCA Asian Region ALARA Network Meeting Korea Information System on Occupational Exposure (KISOE)
RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety TCEU School of Drafting Regulations November.
Tsuruga November 2008 ISOE International ALARA Symposium 1 OCCUPATIONAL EXPOSURE DYNAMICS IN DIFFERENT TYPES OF RUSSIAN NUCLEAR POWER PLANTS Dr.
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
CCTV System for Radiation Work Management Yonggwang NPP Unit 5 & 6.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
1 ALARA at the Borssele nuclear power plant. 2 ALARA at the Borssele P Borssele  NPP Borssele  In the delta in the Southwest of the Netherlands  KWU.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
IAEA International Atomic Energy Agency IAEA Safety Standards and Public Exposure to Radon Trevor Boal Radiation Protection Unit - NSRW.
Occupational Radiation Protection at Swedish Nuclear Power Plants: Views on Present Status and Future Challenges Ingemar Lund et al. Department of Occupational.
Application of « ALARA » at Tihange NPP ISOE EUROPEAN SYMPOSIUM 26 June 2008 Ir. Philippe Petit – Deputy head of SRP department 2 2.
Enhancement of Radiological Safety Culture within Ignalina NPP and Contractors Viktor PLETNIOV Ignalina Nuclear Power Plant Lithuania Gintautas KLEVINSKAS.
1 Activitiesfor Dose Reduction Hamaoka Nuclear Power Station Chubu Electric Power Co.,Inc. November 2005.
Commonality Initiatives in US Nuclear Power Plants to Improve Radiation Protection Culture & Efficiency W. David Wood Director, Environmental & RP American.
Current Status of Radiological Protection in NPPs of Korea
2013 ISOE International ALARA Symposium
Transposition of Requirements set out in the Basic Safety Standards for Nuclear Facilities in Lithuania Gintautas KLEVINSKAS Albinas MASTAUSKAS Radiation.
Sistema Integrado de Supervision de Centrales Nucleares
Radiation Safety Management
Occupational Radiation Protection during High Exposure Operations
Karla Petrová State Office for Nuclear Safety
ALARA Programs & Occupational Dose Trend in Wolsong NPP
The Success of the ALARA Principle – the View of an Inspector
Catalina Chitu, Vasile Simionov, “CNE-PROD Cernavoda” NPP, Romania
Optimization of radiation protection at Bohunice NPP
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
ISOE International ALARA Symposium
Comparison of Performance Indicators of Different Types of Reactors Based on the ISOE Data H. Janžekovič, M. Križman.
CCTV System for Radiation Work Management
The Improvement of ALARA for the Steam Generator Maintenance
Current Radiation Protection Legislation in Slovakia
G. Valtchev, M. Neshkova, A. Nikolov Nuclear Power Plant Kozloduy
Presentation transcript:

ALARA Programs & Occupational Dose Trend in Wolsong NPP Korea Hydro & Nuclear Power Co., Ltd Wolsong Nuclear Power Plant Unit 3&4

Introduction of Wolsong NPP Introduction of Wolsong NPP  Brief History of Wolsong NPP  Generation Capacity of Wolsong NPP History of Korea Regulatory Law History of Korea Regulatory Law ALARA program improvements in KHNP ALARA program improvements in KHNP  ALARA Program before 2000  ALARA Program after 2000  Calling ALARA Committee & Making Decision  General Review of ALARA Program  Cases of Improvements Results of ALARA Program Improvements Results of ALARA Program Improvements Conclusions Conclusions Contents

Brief History of Wolsong : Opening of Wolsong NPP construction office : Commercial operation of unit # : Commercial operation of unit # : Commercial operation of unit # : Commercial operation of unit #4

Generation Capacity of Wolsong Generation Capacity: Total 2,778 MW

History of Korea Regulatory Law Korea regulatory law in radiation protection  1958 : Establish the atomic act  1983 : General revision based on ICRP-9(MPD, MPAD, MPC)  1994 : Include the concept of “ALARA”  1996 : Apply the dose limit concept (no quarterly limit)  1998 : Apply 100mSv/5yr (50mSv/yr maximum) to effective dose limit but 200mSv/5yr until 2002  1999 : Require to implement “ALARA”  2001 : Apply the concept of ALI, DAC

Previous (before 2000)Present (after 2000) ALARA Committee Expected dose: above 250man-mSv Expected dose: above 200man-mSv ALARA Implementation Committee Expected dose: 100~250man-mSv Expected dose: 70~200man-mSv ALARA Prog. Improvements in KHNP Before 2000 : Plant specific ALARA procedure After : Standard ALARA procedure

ALARA Program before 2000 ALARA Committee PWRPHWR Organi -zation Chairman Vice chairman Member Secretary General manager Deputy general manager Plant senior manager Appointed person Radiation safety section senior manager General manager Deputy general manager Plant section senior manager QA section senior manager Plant senior manager (sub-contractor) Radiation safety section senior manager Responsibility - Review ALARA program - Review dose reduction plan for work. If expected dose is above 250man-mSv - Review ALARA program - Review dose reduction plan for work. If expected dose is above above 250man-mSv

ALARA Program before 2000 ALARA Implementation Committee PWRPHWR Organization Radiation safety Section senior manager ALARA staff Radiation protection sect. manager Work planner and supervisor Radiation safety section senior manager Radiation protection sect. manager Maintenance section manager Work supervisor Responsibility - Review & approve dose reduction plan for work expected dose 100~250man-mSv - Review & approve ALARA sheet for work expected dose 100~250man-mSv

ALARA Program after 2000 Organization of ALARA Committee

 General reviews & approval of ALARA program  RP Policy, Annual Target, Long-term ALARA strategy etc  If expected dose for work is above 200 man-mSv  Review & approve radiation protection optimization plan  Review ALARA results after work if actual dose exceeded by 25% more than expected dose  Review & approve radiation safety control plan during O/H periods  Reviews & approval of optimization plan for radiation protection when requested by chairman ALARA Program after 2000 Responsibility of ALARA Committee

ALARA Program after 2000 Organization of ALARA Implementation Committee

 If expected dose for work is above 70~200 man-mSv  Review & approve radiation protection optimization planning  Review ALARA results after work if actual dose exceeded by 25% more than expected dose  Review & approve radiation safety control plan for following workplace  If airborne tritium concentration exceeds 10DAC  If expected dose exceeds 10 man-mSv  Review & approval of optimization plan for radiation protection when requested by chairman ALARA Program after 2000 Responsibility of ALARA Implementation Commit.

Minimum 50% of the committee membership must be attended Issued meeting agenda must be agreed by two- thirds of the attendee Urgent items & imperative cases can be decided in writing by the committee members without the committee meeting Call ALARA Commit.& Make Decision Call ALARA Commit. & Make Decision

ALARA Documentation Kinds of documents Retention periods Radiation work plan (Over 10 under 70 man mSv) Doc. reviewed by ALARA Implementation committee (Over 70 under 200 man mSv) Doc. reviewed by ALARA committee (Over 200 man mSv) 3 years 5 years Plant life time

Any Works Expected dose under 10 man-mSv Use general RWP Perform works Expected Dose 10 ~ 70 man-mSv - Use RWP - Evaluate expected dose every work steps Perform works Expected Dose 70 ~ 200 man-mSv Work group makes & submits to rad. section - expected dose sheet - ALARA check list Open ALARA Implementation committee Review & approve - expected dose sheet - ALARA check list Perform works A Expected Dose over 200 man-mSv Work group makes & submits to rad. section - expected dose sheet - ALARA check list Open ALARA committee Review & approve - expected dose sheet - ALARA check list B Perform works Reviews of ALARA Program

A Review after works If actual dose exceeds 25% of expected dose Open ALARA Implementation committee Review & discuss & apply - dose reduction method to hereafter works B Review after work If actual dose exceeds 25% of expected dose Open ALARA committee Review & discuss & apply - dose reduction method to hereafter works Reviews of ALARA Program

High internal exposure dose (IED) in Wolsong NPP  Internal exposure dose of PHWR is higher than that of PWR  Furthermore, IED reaches up to 40% of EED in the beginning of operation  Internal exposure is mainly caused by airborne tritium Cases of Improvements The Comparison of Occupational Dose

The Improvement of the Respirator using Ice Cubes  Tritium removal media: replace vermiculate and paper filter by ice cubes  Year of development: 1992  Components: canister, half face mask, rubber hose  Ice cube mass: 670g/canister  Tritium removal efficiency: above 95% within 2 hours  Improvements  The prevention of solid rad-waste generation  The respiration became fresher and less stifling  Easy-to-get and cost-effective tritium removal medium Cases of Improvements

The Development of Movable Tritium Eliminator  Application  D 2 O leak from moderator and coolant system  Spills from equipment failure  Maintenance for the systems or facilities including tritium  Purpose  Preventing diffusion of airborne tritium  Reducing internal exposure of workers  Tritium removal mechanism  Adsorption of airborne tritium into water Cases of Improvements

The Other Efforts for IED Reduction  Use of temporary ventilation fan and duct  Use of portable air tent  Improvement of D 2 O collection tools  Development of dryer used for decontamination paper Cases of Improvements

Diminishment of internal exposure dose  Internal exposure dose of PHWR has been diminished  Portion of IED have decreased to half of previous’  Result of continuous efforts to reduce airborne tritium Occupational dose for Wolsong NPP1 Occupational dose for Wolsong NNP2 Results of ALARA program

Decrease in Exposure Dose  Annual dose has not increased (but no. of units increased)  Average dose per person & unit have been diminished Results of ALARA program Annual dose & no. of operating units Annual Avg. Dose per unit & person

Annual radiation exposure dose per PHWR plant

Diminishment of Over-exposure Workers  No. of over-exposure workers exceeded 20mSv/year has increased before  There was no over-exposure workers for last 7 years Results of ALARA program Status of over-exposure workers

Remark: 1) was happened during in-core detector motor repair work at Kori #2 NPP. Total dose was 52.09mSv per person.

Tendency in Exposure Dose  Annual dose has not increased (but no. of NPP increased)  Average dose per person & unit have been diminished  Concentrate radiation control & ALARA activity during O/H Year Dose (man-mSv) % of O/H Dose Normal Operation O/HTotal 20001,8119,58311, ,1818,57110, ,6716,6449, ,7567,53210, ,62710,39813, ,6079,32311,93078 Results of ALARA program Year Dose (man-mSv) % of O/H Dose Normal Operation O/HTotal ,4632, ,8982, ,6612, ,1372,0273, ,4853, ,2073,01673 Exposure dose for all NPPs Exposure dose for PHWR

Atomic law in Korea request actual ALARA implementation First time, management had a duty to ensure doses were ALARA KHNP developed the standard ALARA program  Apply lower dose limits & organize stronger members Successful achievement in dose reduction  Annual total dose has not increased  No. of over-exposure workers has been diminished until 1999 & there was no over-exposure worker till now Conclusions

Thank you very much for your attention