SLAC workshop 7-10 July 2009 WP1: microwave-based accelerators Progress towards a new standard X-band high-power flange G. Riddone, 08.07.2009 (contribution.

Slides:



Advertisements
Similar presentations
PH0101 UNIT 1 LECTURE 1 Elasticity and Plasticity Stress and Strain
Advertisements

CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
Copyright DASSAULT SYSTEMES Sketcher CATIA Training Exercises Version 5 Release 10 December 2002 EDU-CAT-E-SKE-FX-V5R10.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
Shell Momentum Balances
NEW DESIGN FOR RF FINGERS C. Garion 5 June, 2012TE-VSC1 Acknowledgements to A. Lacroix and H. Rambeau for materials and help.
MFGT 142 Polymer Processing Chapter 14: Thermoforming
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
NSTX Center Stack Upgrade Workshop Brainstorming on Design Solutions for TF Joint C Neumeyer Jan 22, 2009.
(MT 207) B.Sc (ENGINEERING) LEVEL 2 (Semester 2)
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
4 Pure Bending.
CM 197 Mechanics of Materials Chap 14: Stresses in Beams
Home Work #4 Due Date: 18 Mar, 2010 (Turn in your assignment at the mail box of S581 outside the ME general office) The solutions must be written on A4.
10 Pure Bending.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
2 nd collaboration meeting on X-band Accelerator Structure Design and Test-Program Structure fabrication Comparative analysis of disk and quadrant manufacture.
All-metal joints studies related to the mechanical and irradiation Przemyslaw Lutkiewicz Supervisors: Christian Rathjen, CERN Cedric Garion, CERN Blazej.
Aluminum bellows for experiments
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
Lecture 12 Different types of extrusion and their characteristics
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Vacuum Fundamentals High-Vacuum Technology Course Week 6 Paul Nash HE Subject Leader (Engineering)
ENT 153 TUTORIAL 1.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
Background: Used to generate a pressure gradient shock wave traveling down a closed tube.
The status of RF components on Maria Filippova, RF components: Loads Phase shifters Attenuators Hybrids Splitters Directional couplers.
Analyses of Bolted Joint for Bolt Preload and Shear Load
Strength of Material-1 Introduction. Dr. Attaullah Shah.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
Mechanical design and tests of the new X-band flange
ILC IR FINAL FOCUS & EXTRACTION MAGNETS Prepared by Andy Marone ILC Workshop, Sept
Bubble Chamber Radiator Thermal Analysis 5.0 MeV, 9.5 MeV Beam Energy Fredrik Fors Mechanical Engineering 8/20/2015.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
R. Wertheim Technion – Israel IWU.Fraunhofer - Germany Introduction to Deformation Processes.
MAP Assembly Investigation A project summary for discussion during 4/11/2014 meeting.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
The status of RF components G. Riddone, M. Filippova RF development meeting on
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
Shaping operations are generally divided into three groups based upon how the parent metal flows or deforms during the shaping process ,namely Bending.
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Mechanical Modelling of the PSI CD1 Dipole
12 GHz High Power RF components requirements for CEA activities
Date of download: 1/1/2018 Copyright © ASME. All rights reserved.
Système à vide du CLIC: activités en cours
Piping.
Chapter 5 Power Estimation in Extrusion and Wire-rod Drawing
4 Pure Bending.
Structure I Course Code: ARCH 208 Dr. Aeid A. Abdulrazeg
High Precision Magnet Production for NSLSII at IHEP
LARP Phase II Secondary Collimator RC-0 and RC-1
Gaskets and Packing An introduction to Gaskets Packing
4 Pure Bending.
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Presentation transcript:

SLAC workshop 7-10 July 2009 WP1: microwave-based accelerators Progress towards a new standard X-band high-power flange G. Riddone, (contribution from C. Garion)

Outline General requirements Recall of existing design from SLAC Presentation of the new design Program GR, 7/8/20092

Requirements Reliable joint - high sealing performance Smooth flange-gasket-flange transition (RF performance) Simple shapes and preferably symmetrical joint Easy assembly Cheap production Needs X-band test stands (few hundreds): needs for CERN and for several other test stands (eg. PSI. Elettra,..) CLIC - about units GR, 7/8/20093

gasket flange SLAC design Parts -Two different flanges - 2 stainless steel WR90 flanges (AISI316LN) -1 OFE copper gasket Observations: - Not symmetrical gasket cross-section - Main sealing mechanism comes from shearing not compression flanges clamped with 8 bolts Gasket Flanges GR, 7/8/20094

Large and non constant displacements into gasket aperture 0.25 Lateral profile of the maximum inner displacements Contact pressure between upper gasket surface and flange Contact pressure between lower gasket surface and flange No sealing Sealing No sealing Sealing Some remarks on SLAC design Different contact pressure distribution for upper and lower surface of the gasket Trapped volume GR, 7/8/20095

Symmetry Assembled joint gasket flange New CLIC design concept Same flanges Rectangular cross section OFS copper gasket Symmetrical, “knife” based design Initial gasket position away from flange/flange plane AISI316LN flanges with 6 bolts and 2 centering pins CERN design proposal GR, 7/8/20096

 Homogeneous contact pressure –symmetric type joint  Cheaper production – simple and easy to machine gasket shape and one type of flange only  Easier assembly – symmetric, self-placed gasket with additional pins centering joint system  Better properties – smooth flange-gasket-flange transition SYMMETRY NO SYMMETRY New proposalSLAC design 2) 3) 1) 2) 1)Female flange 2) Gasket with moderate shape 3) Male flange 1)One type of flange 2) Gasket with simple shape self-placed gasket self-placed gasket + Pins centering joint system 0.25 mm 0.15 mm Flange Gasket < 0.1 mm Flange Gasket Some advantages on CERN design proposal GR, 7/8/20097

Geometrical parameters  (Q 1 )  (Q 2 ) thickness Initial position flange gasket Optimization of the joint geometrical parameters based on FE models:  Flange: knife (  ), thickness, diameter, type and number of bolts  Gasket: thickness, width  Interface: imprint depth, initial position Criteria:  Leak rate (< mbar·l/s) P = contact pressure, w= contact width, A, R = parameters as a function of roughness  Plastic strain in the flanges  Cost CERN design optimization GR, 7/8/20098

Displacement into the aperture CERN design optimization GR, 7/8/20099

CERN Proposal Flange Drawing GR, 7/8/200910

Program Circular gasket design: leak rate measurements Final design: 5 full units (CINEL) available at CERN as well as gaskets Dimensional control  conform Leak-rate measurement as a function of torque (promising results) Realization of the tooling for centering the gasket (done) Displacement as a function of torque Low-power RF tests at CERN Preparation for high-power testing at SLAC of two units: Sept 09 GR, 7/8/200911