Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
MICE RF Module Safety Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting February 12, 2005.
Module Connection and Support Arrangement Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting May 21, 2004.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Progress on the Coupling Coil & Focus Coil Interface Engineering
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Design of the MICE RF Cavity Module :Status of the module designModule flange sealing options Steve Virostek Lawrence Berkeley National Lab MICE
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
RF Cavity / Coupling Coil Module
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Progress on the MICE RFCC Module Mike Zisman/Steve Virostek Lawrence Berkeley National Laboratory MuCool Test Area RF Workshop October 15, 2008.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Integration of the Spectrometer Solenoid Magnets
Spectrometer Solenoid Fabrication Status and Schedule
Cryomodule Assembly Plan
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 2Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Topic Summary Packaging and delivery to RAL Moving into MICE hall Module re-assembly in MICE hall Module installation interfaces End flanges and seals Base mounting RF coupler connections Utility requirements Instrumentation & control

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 3Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Module Shipping Configuration Cavities, couplers, coolers & pumps removed Coupling coil shipped warm Vacuum vessel/magnet axis vertical during shipping Concerns about shipping loads on coupling coil Special shipping fixture will be required Cavities, couplers packaged to prevent damage RF, Be windows left in place w/appropriate protection Vacuum vessel, cavities and couplers will be blanked off and backfilled with N 2

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 4Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Delivery to RAL Arrives w/o cavities, coolers, couplers installed Moved into hall in vertical shipping orientation Height is expected to be ~2000 mm when vertical Height is 2844 mm if horizontal on a short stand MICE Hall door height: 3360 mm Roller dollies w/forklift used to move into hall ~100 mm tall Roller dollies

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 5Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Moving into MICE Hall Module short stand: Likely won’t be needed Vertical orientation shipping stand can also be used to move module into hall Cryocoolers removed Cavities removed Couplers removed Vacuum pumps removed

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 6Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 MICE Hall Access

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 7Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Place operating stand on lateral tracks Load vacuum vessel/coupling coil onto support stand Erect portable clean room around module Unpack cavities, couplers, coolers, pumps Install six tuner assemblies on each cavity Insert cavities in vacuum vessel using special fixture Install couplers and tuner actuators after cavity is aligned and supported by struts Install vacuum pumps to complete module Perform final alignment before translation Re-assembly of Module at RAL

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 8Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL Support stand in place on rail platform

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 9Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Empty module lifted over support

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 10Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL Module lowered onto support

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 11Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL Support stand gussets added

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 12Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL Support stand gussets added

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 13Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL Cryocooler(s) installed

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 14Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL Cryocooler(s) installed

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 15Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL RF cavities installed from either end

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 16Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL Module with all four cavities installed

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 17Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL Cavity tuner actuators added

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 18Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL Cavity tuner actuators added

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 19Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL Module vacuum pumps installed

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 20Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL Module vacuum pumps installed

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 21Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL RF couplers installed

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 22Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Re-assembly of Module at RAL RF couplers installed

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 23Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Insertion into MICE Beamline Assemble module on lateral tracks Align and shim module to correct height Pull back bellows on both module ends with O-rings in place Translate module into position using rails Release bellows and connect flanges Lock out bellows using bridging bolts Connect RF, utilities and instrumentation

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 24Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Module Flange Connection End flange O-ring seal Formed bellows Flange through holes

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 25Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 End Flanges and Seals RFCC flanges mate with AFC module flanges AFC flanges have no O-ring grooves or bellows RFCC module flanges have bellows and O-ring grooves at both ends Bellows are spec’d for >1 cm of total travel Module relative alignment is driven by clearance in flange holes Bellows are locked out after installation to allow transmission of forces between modules

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 26Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 RFCC Bellows and Flange MICE RF and Coupling Coil Module – Summary of the Design and Fabrication Plan Elastomer or Helicoflex all- metal O-ring Clamping bolts Bellows pull back bolts

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 27Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 MICE RF and Coupling Coil Module – Summary of the Design and Fabrication Plan Module Joint Sealing Issues MICE module joints likely to need relatively frequent disassembly (reconfiguring, maintenance, repair) Elastomer O-rings provide the most reliable and cost effective (inexpensive and re-useable) solution O-rings are acceptable for use in MICE environment But, MICE should demonstrate future machine technology including the use of radiation hard seals The RFCC flange groove is designed to accept an all- metal Helicoflex seal for demonstration purposes

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 28Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Module Base Mounting RFCC module base connection to rails similar to that used on the Spectrometer Solenoid Six mounting plates are welded to the base of the module support stand Location of the mounting plates will be included in an interface document being developed Coupling coil magnetic loads are carried to the floor through the vacuum vessel/support stand/base mounting plates

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 29Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Module Mounting Provision Six mounting plates to be welded to the support stand base for installation on rails Similar to spectrometer solenoid mounting scheme

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 30Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Cavity RF Connections Eight RF feeds/module use standard 4” RF coax Cooling water for loop may be required (<<1 lpm each) Adapter attached to RF windows protects ceramic from installation forces Co-ax interface dimensions w.r.t. module center will be included in interface document RF feeds

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 31Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Module Utility Requirements Cryomech Model PT-415 cryocoolers (2 or 4 each total) 50 Hz AC: /220 or 380/420 V, 3 phase Cooling: minimum 12 lpm of 80ºF max 300 A Power Supplies – American Magnetics (2 ea total) Hz AC: V, 3 , forced air cooled, rack mnt. Vacuum: startup thru a 25 mm flanged port Cavity cooling water: ~8 lpm/per cavity Getter pump regeneration power ( VAC, 100 W) Liquid cryogens: LN, LHe for cooldown (100’s of liters) Pressurized N 2 : up to 300 psi for tuner actuators

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 32Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Module Instrumentation & Control Coupling coil Coil voltage taps Thermocouples LHe level Vacuum pressure RF cavities RF pickup loop N 2 pressure control for tuners (1 per cavity) Cooling water temperature/flow Module vacuum Getter pump power supply and controller Pump thermocouple Vacuum pressure

MICE RFCC Module Design Review – Assembly, Installation and Interfaces Page 33Steve Virostek - Lawrence Berkeley National Lab - October 21, 2008 Summary Module to be shipped with all sensitive components removed and packaged separately Vertical shipping orientation also provides comfortable clearance through MICE Hall door Module re-assembly will require specially designed lifting fixtures Module interfaces will be defined in an interface document Utility requirements have been established Instrumentation & controls list being compiled