Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1.

Slides:



Advertisements
Similar presentations
UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
Advertisements

BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
Advanced Heat Pump Water Heater Research Conducted by WSU Energy Program Funded by Bonneville Power Administration BPA Technology Innovation Project #292.
Emerging Technology Field Test 1 February 5, 2015 Brown Bag Mira Vowles, BPA Wesley Saway, BPA.
1 Business Information Technology Data Centers Presentation RTF Data Center Working Group Geoff Wickes Emerging Technologies NEEAMay 7 th, 2013 Updated.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Advanced Rooftop-Unit Control – Retrofit Savings Analysis Overview 1 February 13, 2015 RTF Commercial Rooftop-Unit Working Group Mira Vowles, BPA.
1 Roof Top Units Saving Energy and Improving Occupant Comfort Presented by Ethan Bellavance and Mary Jane Poynter.
Draft Standard Protocol for Cooling and Fan Savings from RTUs RTF March 1, 2011.
VRF for the Seventh Plan Preliminary Approach and Data for a Variable Refrigerant Flow Measure for the Seventh Plan Regional Technical Forum January 21,
Premium Ventilation1 Eugene Water & Electric Board.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee April 25, 2012 Mira Vowles, P.E., CEM Emerging.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Emerging Technology Update Presented To Conservation Resources Advisory Committee June 4, 2014.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee November 16, 2011 Mira Vowles, P.E., CEM.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Heat Pump Water Heaters: Tier 2 – Ducted Interior Installations Provisional UES Proposal Regional Technical Forum February 14 th, 2012.
Prioritization of VC HP Measures Variable Capacity Heat Pump Measure RTF Sub-Committee June 22, 2011 meeting.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee March 27, 2013 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Energy Efficient Block Heater Brown Bag BPA Energy Efficiency 4/15/14.
BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
Deemed Savings Update: ECMs in Display Cases Ben Cartwright PECI January 5, 2009.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
September 30, 2003Conservation Resources Advisonry Committee 1 Commercial Sector Measure Quest Sources & Findings.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee June 12, 2014 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 27, 2013 Mira Vowles, P.E., CEM.
Evaluation of the RTF Standard Protocol Fan and Cooling Savings from Commercial-Sector Heat Pump Units Rooftop Unit Working Group (RTUG) August 20, 2012.
RTU Savings Research Project RTU Savings Research Project: Findings and Recommendations Regional Technical Forum February 3, 2009 Mark Cherniack Howard.
DRAFT Preliminary: BPA Summary of 6 th Plan Supply Curves May 15, 2009 Lauren Gage
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Of moderated conference calls on energy efficiency Utility Brown Bag Series BPA’s Rooftop Unit Service Pilot Jan 29, to 2 p.m. (PST) Facilitator:
RTF Staff, Subcommittee and Work Updates October 4, 2011.
Northwest Power and Conservation Council New Commercial Building Program Quest Presentation, Discussion and Decision of Proposed Approach to Estimating.
Rooftop Unit Working Group - RTUG - January 19, 2010 Up on the Roof…”Up on the roof I've found a paradise that's trouble proof, up on the roof.” —C. King/G.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Alternative Incentive Approaches BPA Energy.
Variable Speed Heat Pumps Provisional UES Proposal Presentation to the Regional Technical Forum September 18, 2012 Presentation by Kacie Bedney, Bonneville.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration Heat Pump Water Heater Laboratory Testing Results & Field Work.
Emerging Technologies Presented by Mark Rehley, Emerging Technology Operations Manager Northwest Energy Efficiency Alliance.
Proposal to Allocate Remaining 2010 Funding RTF November 2, 2010.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee August 28, 2013 Mira Vowles, P.E., CEM.
Proposed Rooftop HVAC Standardized Field Measurement Protocol and Annual Savings Calculator RTUG REVIEW January 31, 2012.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee September 25, 2013 Mira Vowles, P.E., CEM.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum July 15, 2014.
Grocery VSD Measure Deemed Savings Reid Hart, PE & Ken Anderson September 28, 2010.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee July 24, 2013 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee July 2, 2013 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee May 7, 2013 Mira Vowles, P.E., CEM Emerging.
PNW RoofTop Unit Working Group - RTUG – RTU Savings Research Project Phase 3 December 15, 2009.
Process for Review of 6 th Plan Supply Curves June 19, 2009 Lauren Gage
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF August 30, 2011.
A Reliable but Simplified Method for Measuring the Savings from Advanced RTU Control Retrofits February 13, 2013 Presentation to: RTF Commercial Rooftop.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTF January 5, 2010.
RTF RTUG Update Aug 12, 2010 “The Turn of the Screw” Premium Ventilation Extended Monitoring Reid Hart, PE Associate Director Technical Research Group.
ECAM M&V Examples For Packaged Equipment Bill Koran, P.E. Director of Energy Analytics, NorthWrite Inc.
RTF Staff, Subcommittee and Work Updates February 14, 2012 IRTF.
Seventh Plan Update RETAC September 23, Final Plan Update Review of Past Program Results Emerging Tech & New Measures Finance, Admin Cost, Line.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Product/Service Area : HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTUG January 19, 2010.
A Calculator for Reliably Measuring the Savings from Advanced RTU Control Retrofits August 27, 2015 Presentation to: RTF Commercial Rooftop Unit Working.
1 RTUG Project Management Contract Expansion And RTF 2010 Work Plan Budget Adjustments RTF March 2, 2010.
Action Plan for Variable Capacity Heat Pump Technology
NREL Lead Investigator, Michael Deru
Presentation transcript:

Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1

Emerging Technology (ET) Field Tests  First Two ET Field Tests  Premium RTU Retrofit  VRF Systems 2

Example: Heat Pump Water Heaters Product Launched 2009 Convene advisory committee 2009 Northern Tier Specification Lab tests (NREL) Field tests (EPRI) 2011 Estimated energy savings potential assessment 2012 Program deployment BPA & NEEA NEEA emerging tech BPA E3T, EPRI BPA E3T, NREL BPA emerging tech BPA planning BPA programs

ET Field Test Web Page Dynamic list of new field tests  Eligibility requirements  number of installations  Pre-defined savings and  BPA provided M&V  Utility participation request link  Technology briefs  Marketing materials “Go Field Test” 4

Premium Rooftop Unit (RTU) Retrofits 5

6 Premium RTU = RCx + Retrofit + Replacement Premium RTU Retrofits –What?

1.Supply Fan Control Savings –Cycling –Multi-speed –VSD 2.Demand Controlled Ventilation 3.Premium economizer control Approved products:  Transformative Wave Technology’s Catalyst,  Honeywell JADE controller with DCV, VSD and speed controller,  KMC FlexStat  other products as approved 7

Premium RTU Retrofit Details  Unitary, single-zone RTU  with an economizer  greater than five tons of cooling capacity and  serving a commercial facility in BPA territory BPA ET Field Test Limited to 75 8

Premium RTU Retrofit Pre-defined Savings 9

Good Premium RTU Retrofit Applications (not required) 10  Long hours of occupancy,  High occupant density (# of people/SF),  Varying levels of occupancy,  High cooling loads,  Electric heat and  No energy management system  Applications: big-box retail, small-box retail, offices, grocery stores, gyms, fitness centers, places of assembly, auto dealerships, theaters, schools, casinos, bowling alleys and restaurants

Premium RTU Retrofit Research ?’s 1.What is the simplest, reliable method to quantify Premium RTU Retrofit savings? 2.Can the updated ECAM be used as the standard RTU protocol for Program evaluation? –What are the data requirements? 3.Are there other key variables affecting savings, besides OSA temperature and hours of occupancy? 4.Other? 11

Premium RTU Retrofit Research Plan Use the updated ECAM as a Provisional Standard Protocol calculator on up to 125 RTUs Research data requirements: i.True power, OSA temperature, plus other variables TBD ii.One year of weekly cycling, or 6 months of pre & post data »Recommend best practice for metering period iii.One minute interval 12

Premium RTU Retrofit Research Plan Potential RTUG interim presentation – fall/winter? –PNNL, DOE funded, Catalyst work »49 RTUs in PNW »up to 16 heat pumps –BPA ET Field Test status and analysis »up to 75 RTUs 13

Updated ECAM Premium RTU Retrofit Demonstration 14