Customer Service Roundtable Discussion. Quality Control  What type of evaluations do you perform?  Ride along with the service representative?  Actual.

Slides:



Advertisements
Similar presentations
Graduation Action Plan: 11th Grade Career/College Planning Unit Module Five: The World of Work.
Advertisements

Filing a Warranty Claim On-Line Claim Filing. 1.Upon successful login, the screen to the right appears. 2.To start a new warranty claim or check the status.
Emergency Preparedness and Response
Embrace Group Gas Pipeline and Services. About Us EMBRACE GAS PIPELINES PVT. LTD. (“Embrace”) is engaged in execution of projects for Liquefied Petroleum.
1 THE LACLEDE GROUP Natural Gas Distribution Overview and Safety MISSOURI ONE CALL SYSTEM OPERATING COMMITTEE MEETING DECEMBER 19, 2013.
Note To Management This training program is designed to inform management of the requirements of the Hazard Communication Program. This training program.
Do Your Weatherization Standards Measure Up? WARM CHOICE Program Standards and Procedures Energy Essentials Core Contractor Training December 10 and 11,
Meter Tampering Presentation American Electric Power Texas Central Company Texas North Company.
4.1.9 Student Book © 2004 Propane Education & Research CouncilPage Sizing and Selecting Vapor Meters for Gas Distribution Systems Vapor meters.
Reducing Costly Phantom SF6 Emissions Through Tracking Ted Atwood (President & Owner), Polar Technology LLC
Plumbing John Arent Architectural Energy Corporation © 2005 CHPS.
OXY-ACETYLENE TORCHES Protect your head and eyes by wearing proper welding goggles or face shields equipped with a minimum shade 5 lens. Protect your.
11-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 11 OPERATION.
1 Kenneth (Kenny) Mercado Vice President Distribution Electric Operations Preparing Your Home Utilities.
F LOTEC Training Presentation for Authorized Repair Centers This presentation is designed to supplement M-Service Manual InGage Regulator.doc Flotec, Inc.
Internal Combustion Engines. Engines External combustion engine Internal combustion engine Steam engine Gas turbine engine Steam engine Gas turbine engine.
1 THAI TOKO ENGINEERING CO.,LTD. Safety management procedure.
CARDINAL SAFETY RULES There is no greater priority than the safety of each and every employee of Staffaid. For this reason ALL employees must ensure 100%
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application Update on Standardization Team Recommendations on.
SHELTER IN PLACE DRILL TRAINING Preparation for April 2008 Drill.
The Hiki Tiki Mine. The Basic Mine Layout Ventilation/ Beltways/ Escapes.
References : PartA Ch.2 Sec.2 [5.6] PartA Ch.3 Sec.6 TNS 05 Boiler surveys.
Chapter 11 management skills Section 11.1 Management Structures
Training Presentation This presentation is meant for end users of the ZERO Plan program. The Training will include: Overview of the ZERO Plan process and.
Dr Daniel Colbourne 36th Meeting of the Open-ended Working Group of the Parties to the Montreal Protocol – Side Event UNEP.
Carbon Monoxide Safety
LIEE Training at PG&E Presentation to the LIOB January 26, 2010 San José, CA.
Trindel Insurance Fund
Training Presentation
“We Bring Engineering to Life” U.S. Tobacco GAP – Barn Testing Procedure.
WALK OUR TALK. GREEN OFFICE PLAN 10 Things we can do to “green” our office. A MANIFESTO from the Sustainability Task Force and Change Group-Philippines.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Combustion Safety WEATHERIZATION INSTALLER/TECHNICAN FUNDAMENTALS.
Presented by Steven P. Feltman Food Safety and Quality Specialist.
Fire Safety Holiday Safety Fort Belvoir Installation Safety Office.
Safe Work Practices Instructional Goal: the participant will be more aware of the need for proper training on safe work practices at a waste site and.
Your Challenge 1)Use the SCORE CARD provided as a guide to the presentation. 2)Make an honest evaluation of your understanding of the topics discussed.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 1 Course Introduction.
2015 Post No.5 & West Virginia State Mine Rescue Contest Day 2 Problem Briefing.
1. 2 Hazard Assessment 3 Your accident rates or injury rates will be reduced by being pro-active in Hazard Assessment.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Installing Appliances and Interior Vapor Distribution Systems MODULE 1 Introduction.
Cover Letters. Cover Letter Also known as a Job Application Letter A business letter written to a prospective employer to express your interest in and.
Ferris State University & Michigan Department of Career Development 1 Hazard Assessment.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
R Southwest Gas Corporation WRGC Customer Service Roundtable Discussion.
Copyright © 2015 by The S.E.A. Group. OUTLET INLET What is the SR99? Breathing hose Copyright © 2015 by The S.E.A. Group Carry handle Airflow knob Pressure.
Fire Extinguishers Burlington Fire Department 215 S Church Street, Burlington, NC
Day 1 Part 4 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Engaging Businesses Using WorkKeys Job Profiles Presented by Carol Farris.
4.0 Equipment Installation Aspects (Section 4.5 On-Rate for Fuel-Fired Equipment)
FLASH EMISSIONS JIM COOPER, CHESAPEAKE ENERGY CORPORATION.
WHAT WE ARE LEARNING THROUGH IMPLEMENTATION TODD A. SPANGLER, PE BRENTWOOD WATER SERVICES.
Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Continuation of Training. Completing the course doesn’t guarantee employment. Most employers will re-evaluate your swimming strengths before deciding.
Daily Phone Usage This Presentation Will Outline the Retail Store Phone Operation & Inter-Office Communications Press or click the slide to advance.
Part 13 Technician’s Guide & Workbook for Duct Diagnostics and Repair.
Lock Out Tag Out (LOTO).
Presented by.
JULY SAFETY MEETING AGENDA:.
SAFE WORK INSTRUCTIONS
RB Controls Clocking in and out follow ups inner office messages
Important Things To Consider Before Installing A New Heating System
Hire the Best Residential Painting Contractors for Your Home.
ESD Procedures for the Electronics Industry
Step 1: Enter your Timekeeper Employee number as normal.
JULY SAFETY MEETING AGENDA:.
Presentation transcript:

Customer Service Roundtable Discussion

Quality Control  What type of evaluations do you perform?  Ride along with the service representative?  Actual same day "post service call" follow- up?  Phone interview with the customer?  Digital or paper review of the service representative’s service order report?

Quality Control  How many field evaluations do you conduct monthly for each field service representative?  What are the most common issues found on field evaluations?  What is your most common customer complaint?  What is your process for handling customer complaints?

Appliance Servicing How do your field representatives check ventilation on elevated or tall appliances?

Do you permit the use of use of butane lighters for servicing appliances? Appliance Servicing

 Does anyone allow a mirror or fog test to check for proper venting?  What service do you provide on sealed combustion chamber appliances?  Do you find that sealed water heaters are failing more frequently than traditional water heaters?  Are you still finding “soldered” gas appliance connectors?  Are you providing more or less service options to your customers?

Tools and Equipment Do your field personnel have a required tool set?

Tools and Equipment Do you allow your field representatives to use tool belts?

Initiation of Gas Service  Do you perform a pressure drop test or install a diaphragm meter in order to perform a clock test on a small rotary meter turn on?  Do you leave the gas meter on when there is not access to an appliance? Even if the clock test shows zero consumption?  Do you have a separate initial gas turn on and a restore gas procedure?  Do your field personnel carry ladders?  What is a typical wait time (in days) for a service request?

Personnel  What source provides the largest pool for your new hires?  How long do you train new employees before sending them into the field by themselves?  How long is your probation period? ?

Thank You for Sharing