HEAVY AXLE LOADS ON SHORT LINES AND REGIONAL RAILROADS Georgia Railroad Association 5 th Annual Transportation Conference 5 th Annual Transportation Conference.

Slides:



Advertisements
Similar presentations
KEVIN B. PAGE VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION VIRGINIAS RAILROADS A STAKEHOLDER IN TRANSPORTATION DEVELOPMENT.
Advertisements


1 Rail, traffic, sleepers, and fasteners in Australia A/Prof Alex Remennikov School of Civil, Mining and Environmental Engineering University of Wollongong,
Railcar 101 The Basics of Railcars: Car Types, Components and Rules
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
Projects proposed for RRIF Financing Don Cleland.
Truck Size & Weight Reform Timothy Lynch Senior Vice President American Trucking Associations Talking Freight May 20, 2009.
Minnesota Department of Transportation House Transportation Policy & Finance Committee February 23, 2015.
INFORMS 2012 Shared Corridor Railway Maintenance Scheduling Brennan M. Caughron Graduate Research Assistant Rail Transportation and Engineering Center.
Passenger Rail – Plan & Opportunities Engineer Contractor Conference Middleton, WI January 21, 2010.
Regional and Short Line Railroads
A new Concrete Tie design Created by Rudy Niederer.
October 2008 International Rail Safety Conference 2008 Denver, Colorado, USA.
CE 515 Railroad Engineering
SUMMARY OF BENEFITS AND RETURN ON INVESTMENT GPS FLEET TRACKING.
U.S. Railroad Industry Federal Railroad Administration U.S. Railroad Industry Federal Railroad Administration.
CE 515 Railroad Engineering Unit-Train Operations Special Freight and Package Services Source: Armstrong Ch 14 & 16 “Transportation exists to conquer space.
Company Overview. Today’s discussion covers four topics 1)Background 2)Improvements made at RailAmerica to date 3)Things we’re working on 4)Our plans.
1 1 CRTPA Board Meeting 09/20/2010. CSX Corporation (NYSE: CSX) CSX Transportation – serves every major population and industrial center east of the Mississippi;
Assessing the efficient cost of sustaining Britain’s rail network: perspectives based on Zonal comparisons. First Conference on Railroad Industry Structure,
TRACECA PROJECT EVALUATION. LEVEL CROSSINGS ON GEORGIAN RAILWAY TRACECA ROUTE AUTOMATION OF 39 LEVEL CROSSINGS ON THE MAIN LINE FROM AZERBADJAN BORDER.
Aurora Automated Inspection Capabilities on Concrete Ties and Fastener Systems Gregory T. Grissom, P.E. Vice President – Engineering GREX - Georgetown.
Results of International Concrete Crosstie and Fastening System Survey Brandon J. Van Dyk, Marcus S. Dersch, J. Riley Edwards, and Christopher P.L. Barkan.
1 THE FREIGHT RAIL INFRASTRUCTURE CHALLENGE 2009 AASHTO SCORT Conference – Oklahoma City, OK September 20 – 23, 2009.
1 Rail Infrastructure Spending Railroad investments to meet growing demands Brian Sweeney BNSF Railway International Legislators Forum Deadwood, SD June.
B-WIM for Bridge Enforcement and Structural Safety
Tracking the Trucking Industry… 2004 and Beyond Presented by Dan Murray American Transportation Research Institute.
Passenger/Freight Railroad Projects in Michigan. 2 Michigan Railroad Network Michigan’s freight & passenger rail system is part of a multi-modal transportation.
Talking Freight Promoting Economic Revitalization through Enhanced Freight Transportation Eric G. Madden Deputy Secretary for Aviation and Rail Freight.
The Railroad Industry Local Operations And Future Challenges.
The Crescent Corridor Intermodal Freight Project Improving Lives and Livelihoods IN & AROUND DC Washington, DC December 16,
Discussion Topic 2 Discussions TOPIC 2: Implementation costs.
September 21, 2010 Railroad Human Resource Issues Standing Committee on Rail Transportation of the American Association of State Highway and Transportation.
Overview of Investigation to Understand Progression of Concrete Tie Conditions in High Speed Applications Jeff Henderson Project Engineer Prepared for.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
STRATEGIC CONSULTING SERVICES Update of the Freight Rail Bottom Line Report: Continuing Study of Freight Rail Supply Meeting Demand Briefing.
Analyzing Changes to Truck Size and Weight Regulations Methods for States presented to AASHTO Subcommittee on Highway Transport presented by Donald Ludlow,
PRACTICAL SOLUTIONS TO CHALLENGES FACED BY RAILWAYS IN THE REGION The Case of NRZ Harare, 15 October 2015 THERE IS NO BETTER WAY THAN THE RAILWAY.
1 Rail Infrastructure Spending Railroad investments to meet growing demands Brian Sweeney BNSF Railway MACE Conference November 4, 2015.
KEP LLC Economic and Management Consulting PRESENTED TO: Usaee/iaee north American conference Pittsburgh, pa Rail capacity for transportation of energy.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
CHAPTER 14 UNIT–TRAIN OPERATIONS. The Unit-Train Bulk commodity freight (coal, grain, minerals) Moves as a unit from origin to designation, large producers.
The Use of PAVEDAT for the District-wide Truck Enforcement Plan June 20, 2012 Mark Berndt Eulois Cleckley.
1 Planning Andrea Stevenson. 2 What’s the Big Deal About Ohio’s Transportation System? Ohio is within a single day’s drive (600 miles) of 60% of the United.
Positive Train Control The impact of legislative changes SCORT Chris Heald September 22, 2009.
Mod 0428 Charge Impact October Affected Supply Point Population.
Equipment Asset Management Working Committee Update.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
March 31, 2016 Area Transportation Partnership Fergus Falls, MN.
The Transportation Logistics Company Indiana Logistics Summit Infrastructure Needs and Opportunities September 26, 2007.
INFRASTRUCTURE DEVELOPMENT CONSULTANTS Review of the East Africa Railways Master Plan Peter Kieran CPCS Transcom Limited March 11, 2010.
1 Address: UIC Safety Database (SDB) System and Results.
AusRail © Transportation Technology Center, Inc., a subsidiary of the Association of American Railroads, 2005 TM TTCI is a subsidiary of the.
Road Investment Decision Framework
Status of the Rail Industry Presented to the General Services Administration Washington DC March 2015.
Concrete Maintenance Ties – Interspersal in Existing Wood Track AusRAIL PLUS 2003.
The “Top Down” Approach of Diagnosing Below Rail Problems
Today´s Challenges of the Rail Infrastructure Industry
ZETA-TECH Associates, Inc.
Inspection Davenport IA
The Current State of the Railroad Industry
By A. J. Reinschmidt & Semih Kalay
Development of SLEEPER STRATEGIES
Maintenance Strategies for Turnouts
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
CHAPTER THE TRACK.
Chicago to Council Bluffs-Omaha
March 31, 2016 Area Transportation Partnership Fergus Falls, MN
Presentation transcript:

HEAVY AXLE LOADS ON SHORT LINES AND REGIONAL RAILROADS Georgia Railroad Association 5 th Annual Transportation Conference 5 th Annual Transportation Conference June 8 – 10, 2003 Young Harris, GA

Heavy Axle Loads and North American Railroad Network North American Class 1 Railroads are moving to heavier cars and higher axle loads North American Class 1 Railroads are moving to heavier cars and higher axle loads – Double stack cars operate at up to 39 ton axle loads – Bulk commodity cars operate at 286,000 lb. gross weight on rails 36 ton axle loads 36 ton axle loads Significant operating savings for: Significant operating savings for: – Class 1 railroads – Shippers Serious potential impact for Short Lines & Regional Railroads Serious potential impact for Short Lines & Regional Railroads – Potential impacts on short lines and regional railroads Safety Safety Maintenance of Way costs Maintenance of Way costs

Effects of Heavy Axle Load Traffic Heavy axle load studies on Class 1 railroads show HAL most strongly effects MoW costs for Heavy axle load studies on Class 1 railroads show HAL most strongly effects MoW costs for - Rail and joints - Ties and fastenings - Ballast and surfacing - Turnouts and special track work - Bridges

Effects of Heavy Axle Load Traffic on Short Lines & Regionals Effects of HAL traffic on Short Lines and Regional Railways Increase in surface degradation at joints, particularly cross-level Increase in surface degradation at joints, particularly cross-level – Need for ongoing monitoring program Increased degradation at turnouts Increased degradation at turnouts Increase in surface spalling of rail Increase in surface spalling of rail Potential for increased rail defects, particularly at joints Potential for increased rail defects, particularly at joints – Potential for broken rail derailments – Need for ongoing monitoring program Increase in tie degradation at joints Increase in tie degradation at joints Potential capital costs for bridges Potential capital costs for bridges – Particularly bridges marginal at 263,000 lb.

Heavy Axle Load Damage Factors *Based on 286,000 lb. car Damage* Damage* (per axle) (per MGT) Damage* Damage* (per axle) (per MGT) Rail Wear +9% 0% Rail Fatigue(internal) +29%+19% Rail Fatigue (surface) +16%+ 7% Rail Joints +32%+21% Ties +13%+ 4% Good Ballast +9% 0% Poor Ballast +60%+47% Turnouts +29%+19%

HAL Effects Using ZETA-TECH HAL analyses models, following effects were predicted for operation of 286,000 lb. HAL cars Using ZETA-TECH HAL analyses models, following effects were predicted for operation of 286,000 lb. HAL cars If all (100%) traffic is converted to HAL cars: If all (100%) traffic is converted to HAL cars: – Increase in rail and turnout maintenance costs (to include capital costs associated with rail and turnout replacement): 28% – Increase in tie costs: 12% – Increase in surfacing costs:23% Overall increase in maintenance costs associated with rails, ties, ballast, and turnouts: 17%

Study Methodology A sample of railroads from ASLRRA’s membership A sample of railroads from ASLRRA’s membership Calculation of track miles requiring new rails, ties, ballasting, and bridge upgrade/replacement Calculation of track miles requiring new rails, ties, ballasting, and bridge upgrade/replacement Site Interviews performed Site Interviews performed Information quantified specific capital requirements as a function of: Information quantified specific capital requirements as a function of: – operating speed – annual traffic volume – rail weight – tie condition – ballast condition – bridge condition

Study Sample 46 railroads of approximately 550 in the industry 46 railroads of approximately 550 in the industry 4,742 track miles of an estimated total of 49,985 4,742 track miles of an estimated total of 49,985 Average annual tonnage per mile ranging from 0.1 MGT to 16 MGT Average annual tonnage per mile ranging from 0.1 MGT to 16 MGT Operating speed ranging from 10 mph to 50 mph Operating speed ranging from 10 mph to 50 mph FRA track class from “excepted” to Class 5 FRA track class from “excepted” to Class 5 Large regional railroads (Wisconsin Central, Florida East Coast) excluded from the analysis to avoid skewing the sample Large regional railroads (Wisconsin Central, Florida East Coast) excluded from the analysis to avoid skewing the sample

Findings of the Analysis Component Action Rail22% of track miles must be replaced Ties43% of track miles require at least some ties, depending on current tie condition Ballast23% of track miles require additional ballast; surfacing will also be required when ballast is added Bridges22% require replacement; 27% require upgrading

Costs The total cost of this required investment was calculated by use of standard railroad industry unit costs for: The total cost of this required investment was calculated by use of standard railroad industry unit costs for: – Rail installation – Tie installation – Ballasting and surfacing – Turnout replacement – Bridge replacement (cost per track foot for timber, steel, concrete bridges) Costs were based on use of new components, since a track rehab program of this size would quickly exhaust supplies of secondhand rail, secondhand ties, and turnouts Costs were based on use of new components, since a track rehab program of this size would quickly exhaust supplies of secondhand rail, secondhand ties, and turnouts

Conclusions: Required Investment ComponentRequiredTotal CostTotal Cost Investment(Sample)(Industry) Rail and Turnouts$ 75,106$356,150,175$3,754,182,002 Ties$ 16,372$ 77,636,048$ 818,362,236 Ballast/Surfacing$ 2,657$ 12,597,440$ 132,789,720 Turnouts$ 7,882$ 37,377,454$ 393,996,056 Total$137,253$650,847,006$6,860,583,787 Track Mileage 4,742 49,985

Conclusions US Railway industry is moving towards heavier axle load US Railway industry is moving towards heavier axle load – Overall economic benefit to Class 1 railroads and shippers Short Lines & Regional will be required to accept HAL equipment Short Lines & Regional will be required to accept HAL equipment Increase in maintenance of way costs Increase in maintenance of way costs – Projected increase of the order of 5 to 17% – Potential large need for capital; particularly for rail and bridges ASLRRA is implementing a program to develop tools for members to: ASLRRA is implementing a program to develop tools for members to: – Assess the potential impact of HAL traffic on their operations – Manage their rail condition and rail assets under HAL operations – Assess the overall economics of HAL operations on a railroad specific basis