MAWTHADRAISHAN & MAIRANG

Slides:



Advertisements
Similar presentations
Of.
Advertisements

High Frequency Words List A Group 1
The.
High Frequency Words Words 1-100
RICE-CUM-FISH PRODUCTION OPPORTUNITIES FOR ZAMBIA
The.
The.
Welcome.
Chapter 4 AMORTIZATION AND SINKING FUNDS
FISH CULTURE IN RICE FIELDS GUNARDI SIGIT. Introduction Cultivating rice and fish together has been centuries old tradition in some parts of southeast.
Potential of convergence with NREGS and Inland fishery in rainfed area By: Neelkanth RRA Network.
Part A NBA + MGNREGA Part B MGNREGA + Other Schemes.
Presented by: Shri Kennedy Lamare Programme Manager, FFDA DALU & BETASING C&RD BLOCK FIELD VERIFICATION REPORT OF SCHEME SPA, VALUE CHAIN ( ) IMPLEMENTED.
Meghalaya State Aquaculture Mission Meghalaya State Aquaculture Mission (MSAM) was launched on the 5 th March, The objective is to create 1.00 lakh.
Access To Finance Alan King Business Gateway Monday 29 September 2014.
© CommNet 2013 Education Phase 1 Animals. © CommNet 2013 A baby cow is called a calf. This calf has just been born and weighs about 35 kg.
ACA-TM-37 (v Nov-10 ) Fishery Project Finance ( Fresh water) Manas Ranjan Mohanty, GM.
Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.
OVER VIEW OF AQUACULTURE IN THE GAMBIA. THE GAMBIA.
Kalispel Tribe Resident Fish Program Hatchery - Wayne Gould Habitat- Michele Andersen.
Agriculture Road Map of Bihar A presentation on Rastriya Krishi Vikas Yojana.
Success Story from ACRSP Ambassador - Kenya Nancy Gitonga, Charles C. Ngugi*, Betty Nyandat, and James Bowman *Presenting Author.
MINISTRY OF HIGHER AND SECONDARY SPECIAL EDUCATION REPUBLIC OF UZBEKISTAN TERMEZ STATE UNIVERSITY AGRICULTURE IN UZBEKISTAN peculiarities and development.
Ripples Down Willow Brook Illustrations by Vadim Gershman.
100 Most Common Words.
High-Frequency Sight Words
1st 100 sight words.
MICROFINANCE AND ADVERSE SELECTION P.V. Viswanath.
First Grade Spelling Words
The Great Depression The roaring 20s ends suddenly with the crash of 1929.
Is a Financial Institution controlled by the Italian Ministry for Economic Development, participated by leading Italian Banks and Confindustria – the.
Sources of finance Long term finance Short term finance.
1 THE PLACE OF CARP CULTURE IN BANGLADESH Bangladesh Shrimp Foundation By Mahmudul Karim.
Strengthening Rural Service Provision Approach and Experience of Innovision Consulting Pvt. Limited January 2013.
National Conference on “Water and Sanitation for All in Madhya Pradesh: Opportunities and Challenges” Bhopal, Madhya Pradesh 23rd September, 2010 At :
List A Sight Words.
Sight Words - List A Words
1Confidential and Not for Publication PROGRESS ON DELIVERY AGREEMENT FOR OUTCOME 8: SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE.
STRATEGY FOR ENSUING RABI & SUMMER CROPS KARNATAKA STATE.
© Food – a fact of life 2012 Farming food PowerPoint 304.
Presented by: Shri Bickyforth R. Marak Programme Manager, FFDA BAGHMARA & RONGARA C&RD BLOCK FIELD INSPECTION REPORT ON THE SCHEME IMPLEMENTED UNDER MEGHALAYA.
LOWER L’ANGUILLE WATERSHED COST SHARE PATRICIA PERRY ST. FRANCIS COUNTY CONSERVATION DISTRICT.
First 150 Words from the Fry List
The.
1 1 STRATEGIES FOR ENHANCING FOOD GRAIN PRODUCTION Formulation of Krishi Karman Award Department of Agriculture MANIPUR.
Progress on Draft Small Scale Fisheries Policy Presentation to the Select Committee on Land and Environment 14 June 2011 B RANCH : F ISHERIES M ANAGEMENT.
PROFESSOR LEN GREEN WEDNESDAY APPRENTICE TEAM 6 SIGMA Cubana Restaurant Group.
Transparent Distribution of Subsidy on Hybrid Seed during Kharif 2015 New Delhi, Amit Mohan Prasad Pr. Secretary, Uttar Pradesh.
STRATEGIES AND INITIATIVES FOR XIITH PLAN i. Encouraging High Value, Low Volume, Low External Input in Sustainable Agriculture (LEISA) to increase the.
CREATE AND RAISE CATFISH FARM Why do we take pains to pay for expensive fish when we can create and raise them in our own backyard? If you like aquarium,
TRAINING PROGRAMME OF DURANTA BRIDDHI
Confucianism By: Tyler Featherston Savannah Patton & Will Beatty Savannah Patton & Will Beatty.
CULTURE OF GROUPERS.
Chapter 3 Understanding Money Management
Food and Agriculture Sector Working Group Report Concerns Relating to Monsoon Flood 2004.
AWARD SCHEME State : Assam a presentation by : R. T. JINDAL APC & Principal Secretary.
First Grade Sight Words Ready…. Set…. Go…... the.
Review from previous lesson: Discovery of the Holy Cross TRUE OR FALSE?  there was a war between Emperor Heraclius and the Persians. TRUE OR FALSE? 
Win Win Le Fishery Officer Department of Fisheries Myanmar 23 rd March 2016 Kochi, India.
“SMART” APPROACH TO EFFICIENT WATER RESOURCE USAGE Anna Yeritsyan June 26-29, Ravello, Italy.
ARTIFICIAL FERTILIZATION Artificial production of fish seed involves human intervention in the natural propagation processes. This may be achieved by creating.
INTEGRATED TRIBAL DEVELOPMENT AGENCY (YANADIS), NELLORE
PowerPoint 304 Farming food © Food – a fact of life 2007.
Agriculture in Australia
Agriculture in Australia
Field Photos
1st GRADE SIGHT WORDS.
Write the word..
Graph your point & use the slope to go back to the y-axis.
Presentation transcript:

MAWTHADRAISHAN & MAIRANG FIELD VERIFICATION OF THE SCHEME SPA (2010-11), VALUE CHAIN (2010-11) & RKVY CORPUS FUND (2011-12) IMPLEMENTED UNDER MSAM MAWTHADRAISHAN & MAIRANG C&RD BLOCK Presented by: Smt. Jopilin L. Nonglait Programme Manager, FFDA Directorate of Fisheries, Shillong

MAIRANG BLOCK 1. Christian UP School, Nongkasen Remarks: Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2531391254 Bundh Crest width >1.5M Bottom width < 3 M Slope 1:1 Depth < 1 M Overflow pipe 2-4 inch Drain pipe 8 inch Percentage of completion 100 Remarks: They will try to raise the pond depth. Previously the pond size is less but now they have constructed another two small ponds to meet the specification.

MAIRANG BLOCK 2. Shri Emkwingshon Marngar, Nongkasen Remarks: Name of the scheme Value Chain Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.12 Ha Pond identification Number (PIN) 2530991254 Bundh Crest width 1-1.5M Bottom width < 5 M Slope 1:1 Depth 1-1.5 M Overflow pipe No overflow Drain pipe 8 inch Percentage of completion 100 Remarks: He has already constructed 6 ponds but 3 are meant for value chain. Seed had been stocked with own expenditure, still waiting for the Departmental fish seed.

MAIRANG BLOCK 3. Shri Bankitbok Lyngkhoi, Nongkasen Remarks: Name of the scheme Value Chain Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.12 Ha Pond identification Number (PIN) 2531091254 Bundh Crest width > 1.5M Bottom width > 5 M Slope 1:1 Depth 1-1.5 M Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 50 Remarks: Work is in progress, only first installment received.

MAIRANG BLOCK 4. Smti. Triansinoris Iawphniaw, Langlew Remarks: Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2528591256 Bundh Crest width > 1.5M Bottom width < 3 M Slope 1:1 Depth 1-1.5 M Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: Fish seeds had been stocked borne from her own expenditure. Still waiting for the Departmental fish seed.

MAIRANG BLOCK 5. Shri. Kesparlin Syiemlieh, Marngor Remarks: Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.15 Ha Pond identification Number (PIN) 2527491256 Bundh Crest width > 1.5M Bottom width > 5 M Slope 1:1 Depth > 1.5 M Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: Fish seeds had been stocked with own expenditure, 2nd installment received, loan has not clear yet.

MAIRANG BLOCK 6. Shri Hoben Sohshang, Marngor Remarks: Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2527691259 Bundh Crest width > 1.5 M Bottom width > 5 M Slope 1:1 Depth Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: Fish seeds had been stocked with own expenditure, 2nd installment received, pond constructed through diversion of the river.

MAIRANG BLOCK 7. Shri Finder Lyngdoh, Langlew Remarks: Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.2 Ha Pond identification Number (PIN) 2528991254 Bundh Crest width > 1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: There is no water in the pond due to leakage, therefore he constructed with cemented wall and work is in progress.

MAIRANG BLOCK 8. Shri Welphang Marngar, Laitkseh Remarks: Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2530191246 Bundh Crest width > 1.5M Bottom width > 5 M Slope 2:1 Depth 1-1.5 M Overflow pipe No overflow Drain pipe 4-6 inch Date of stocking 5-09-2013 Percentage of completion 100 Remarks: He conveyed the message to the Department to extend the supply of feed and fertilizers in the second year also.

MAIRANG BLOCK 9. Shri Ristarkhos Marngar, Laitkseh Remarks: Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2530091244 Bundh Crest width 1-1.5M Bottom width < 3 M Slope 1:1 Depth 1-1.5 M Overflow pipe 4-5 inch Drain pipe 4-6 inch Date of stocking 5-09-2013 Percentage of completion 100 Remarks: The water quality is good since he followed what he learnt from the training given to him. He is ready to construct another pond with his own expenditure.

MAIRANG BLOCK 10. Shri Spailin Sohlang, Markasa Remarks: Name of the scheme Value Chain Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2531891259 Bundh Crest width > 1.5 M Bottom width > 5 M Slope 1:1 Depth 1-1.5 M Overflow pipe 4-5 inch Drain pipe 4-6 inch Percentage of completion 100 Remarks: The pond is situated in the market place; his interest is to convert it into a tourist spot.

MAWTHADRAISHAN BLOCK 11. Shri Planningstar Lyngdoh Mawnai, Mawroh Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2536191388 Bundh Crest width 1-1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe 2-4 inch Drain pipe Not yet installed Percentage of completion 80 Remarks: The farmer takes interest on pond construction even though the subsidy could not meet his excess expenditure. Pond reconstructed with cement since the wall collapse due to penetration of water.

MAWTHADRAISHAN BLOCK 12. Smt. Drelin Jana, Mawroh Remarks: Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2536091385 Bundh Crest width 1-1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe 4-5 inch Drain pipe 4-6 inch Percentage of completion 100 Remarks: Water quality is good since application of cow dung is followed up properly. She wanted to expand her pond little bit bigger. Waiting for the departmental seed.

MAWTHADRAISHAN BLOCK 13. Smt. Mali Nongbri, Mawlumkohkhrang Remarks: Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.4 Ha Pond identification Number (PIN) 2535091333 Bundh Crest width > 1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: Stocked with 2 quintal of Fish seed purchased from Umsning. Still waiting for the departmental seed since the pond is already exceed 0.1 ha.

MAWTHADRAISHAN BLOCK 14. Smt. Jrolmai Jana, Phudbah Son in photo Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.38 Ha Pond identification Number (PIN) 2535991341 Bundh Crest width > 1.5 M Bottom width > 5 M Slope 2:1 Depth Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 100 Remarks: Stocked with 2 quintal of Fish seed from own expenditure.

MAWTHADRAISHAN BLOCK 15. Shri Stendro Rani, Phudbah Remarks: Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2536191341 Bundh Crest width > 1.5 M Bottom width > 5 M Slope 1:1 Depth Overflow pipe 2-4 inch Drain pipe 4-6 inch Percentage of completion 100 Remarks: He cleared up the bank loan immediately.

MAWTHADRAISHAN BLOCK 16. Shri Richardpower Lyngdoh Mawnai, Mawshut Grand father in photo Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2535091369 Bundh Crest width > 1.5 M Bottom width 3-5 M Slope 1:1 Depth 1-1.5 M Overflow pipe 2-4 inch Drain pipe 8 inch Percentage of completion 100 Remarks: Fish seeds had been stocked borne from own expenditure. Still waiting for the departmental seed.

MAWTHADRAISHAN BLOCK 17. Smt. Patricia Lyngdoh Mawnai, Mawshut Husband in photo Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 253509136 Bundh Crest width > 1.5 M Bottom width > 5 M Slope 1:1 Depth 1-1.5 M Overflow pipe > 5 inch Drain pipe 4-6 inch Percentage of completion 100 Remarks: Fish seeds had been stocked borne from her own expenditure, repayment of loan is completed.

MAWTHADRAISHAN BLOCK 18. Smt. Krossmolin Ryntathiang, Langstiehrim Husband in photo Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2534291376 Bundh Crest width 1-1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe 2-4 inch Drain pipe No drain pipe Percentage of completion 100 Remarks: 250 kg of Fish seeds had been stocked borne from her own expenditure, now there many fingerlings hatched from the old brood fish; she also contributed table sized fish during the 1st Aqua fest. Water quality is good.

MAWTHADRAISHAN BLOCK 19. Smt. Wahidir Wahlang, Sangshong Remarks: Husband in photo Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed Pond identification Number (PIN) 2533291379 Bundh Crest width 1-1.5 M Bottom width 3-5 M Slope 1:1 Depth Overflow pipe 4-5 inch Drain pipe 4-6 inch Percentage of completion 100 Remarks: Fish seeds had been stocked borne from her own expenditure, repayment of loan is completed.

MAWTHADRAISHAN BLOCK 20. Shri Bakerlang Marbaniang, Sangshong Remarks: Name of the scheme SPA Area of the pond to be Constructed 0.1 Ha Actual area of the pond constructed 0.88 Ha Pond identification Number (PIN) 2532991379 Bundh Crest width - Bottom width Slope Depth Overflow pipe No overflow Drain pipe 4-6 inch Percentage of completion 80 Remarks: Repayment of loan is completed; the cost of labour is more since the pond is quite big.

THANK YOU