Chavdar Ivanov, ENTSO-E Secretariat | 18 June 2010 ENTSO-E Roadmap on CIM CIM User Group meeting, 18 June 2010, Milan, Italy.

Slides:



Advertisements
Similar presentations
1 SETSO TF SETSO TF NACMPF SG Congestion Management and NTC.
Advertisements

1 st GRG meeting, Zagreb, 30 September 2005 Gas Regulatory Group Main issues to be addressed.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
TC 57 CIM Release Plan and Technical Issue Submittal/Tracking Kendall Demaree CIM Model Manager June 11, 2008 CIM Users Group Vasteras Sweeden.
Quality Label and Certification Processes Vienna Summit 11 April 2014 Karima Bourquard Director of Interoperability IHE-Europe.
A step-wise path to e61850 with UML IEC TC 57 WG10
© 2011 Siemens Energy, Inc. All rights reserved. Answers for energy. PSS ® ODMS a proven solution for CIM-based network modeling Anna Geevarghese T&D Service.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
Role of CIM for Power System Model Exchange: Europe - ENTSO-E Experience with CIM CIM Users Group February 26, 2013 Melbourne, Australia Chavdar Ivanov,
ENTSO-E and how we can use this new body in the future in terms of market, planning and operations 13 May 2009 CIM user group meeting, Genval, Belgium.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Network (Common) Model Management System Presentation to ERCOT October 21, 2008 Thomas F Garrity Vice President Energy Management and Automation Siemens.
Working Group Summaries Genval, Belgium May 14, 2009.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Contractor on Website and Internet Communication Technologies Financing Energy Efficiency Investments for Climate Change Mitigation Website and Internet.
Chavdar Ivanov, ENTSO-E Secretariat | October 2010 ENTSO-E Roadmap on CIM CIM User Group meeting, October 2010, San Francisco, US.
Generation & Trading CIST REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) Athens – 27 th of October 2004.
Generation & Trading CIST REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) 3rd South East Europe Energy Week – 1 to 4 th June 2004.
CIMSpy/CIMdesk A CIM-based Data Engineering Tool
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
UCTE Viewpoint towards CIM – project report Chavdar Ivanov, Ph.D. UCTE Secretariat, Convenor of AhG UCTE format CIM User Group meeting, 12-15th May 2009,
© Siemens Energy, Inc Energy Automation CIM Model Management Kurt Hunter 2009 IEEE Power System Conference & Exposition March 18, 2009.
Energy Agency of the Republic of Serbia
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
Processus de Rabat / Rabat Process Session 4: Monitoring the Roadmap of the Dakar Strategy MEETING ON THE STRENGTHENING OF POLITICAL DECISION-MAKING BASED.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Activities of Joint Cigré/CIRED/UIE Power Quality Working.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
TC 57 CIM user Group Meeting June 2010 Milano 1 Technical Committee 57 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
Working Group Summaries Charlotte, NC November 12, 2009.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
© Siemens Energy, Inc Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
CIM User Group Overview Terry Saxton Vendor Co-Chair Open Smart Grid AMI-Ent Task Force Meeting July 14, 2009.
1MIL client logo to be positioned at the mark minimum height maximum size navigator Text Lines MIL Agenda.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
ISO/TC 204 WG 3-Database Technologies
REWG activities in LILIIA MALON REWG Chair Prague
Support- IRDiRC Proposed Work Plan And Communication Strategy
The state of implementation of CIM in MAVIR
ENTSO-E IT project for Fundamental Electricity Data Transparency
EDF expectations regarding Interoperability tests
Temporary Capacity Restrictions: TCR WG & TCR tool
Hosted by American Electric Power (AEP)
CIM Model Manager Report
Activities of the UNECE-UNODC Task Force on Victimization Surveys
IOP perspectives Some European point of view with the help of Alstom,Entsoe,EDF Andre Maizener 11/11/2009.
Amendment Invoice Task Force Progress Report
European Network of Transmission System Operators for Electricity
SOCIAL DIALOGUE WITHIN EUPAN
ETS WG, 31 January-2 February 2005
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
Amendment Invoice Task Force Progress Report
Model Exchange TF Vasteras, June 12, 2008
Model Exchange TF Vasteras, June 12, 2008
Presentation transcript:

Chavdar Ivanov, ENTSO-E Secretariat | 18 June 2010 ENTSO-E Roadmap on CIM CIM User Group meeting, 18 June 2010, Milan, Italy

ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 2 of 17 ENTSO-E fully operational since 1 July 2009 Represents 42 TSOs from 34 countries 525 million citizens served 828 GW generation 305,000 km of transmission lines managed by the TSOs 3,400 TWh/year demand: 400 TWh/year exchanges: Replaces former TSO organisations: ATSOI, BALTSO, ETSO, NORDEL, UCTE, UKTSOA Web site:

Development and Implementation of CIM in ENTSO-E  November 2007: UCTE agreed to launch an initiative for development of new UCTE XML based data exchange format that will considered as a standard for exchange of load flow and dynamic data and allows performing of all kind of analyses as follows: steady state, unbalanced short circuit and dynamic analyses.  AhG UCTE format was established.  May 2008: UCTE Steering Committee approved Cooperation of AhG “UCTE format” with international organizations aiming at inclusion of UCTE needs into international standard UCTE participation in EPRI project (CIM for Dynamics)  Summer 2008: UCTE joins the EPRI Project and creates a liaison with IEC TC57. UCTE CIM TF is established during CIM user Group meeting in Vasteras (June 2008) ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 3 of 17

Development and Implementation of CIM in ENTSO-E  January 2009: UCTE Steering Committee approved Migration Policy. Priority of migration of “planning” models is given.  March 2009: UCTE IOP. Successful interoperability among IOP participants  May 2009: UCTE Profile finalized and submitted to IEC  July 2009: ENTSO-E is fully operational: new work organization related to CIM is implemented All contracts and agreements have been transferred from UCTE to ENTSO-E. ENTSO-E has liaisons with IEC TC57 (WG13 and WG16) and it is a member of EPRI project “CIM for Dynamics”, etc.  July 2009: CIMdesk and Migration Converter provided to ENTSO-E members  Nov 2009: First IOP CIM for Dynamics. The concept is proved ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 4 of 17

Important ENTSO-E decisions  1 Oct 2009: System Development Committee (SDC) agreed that CIM/XML will be used in ENTSO-E data exchanges related to SDC activities (system studies, planning data exchanges)  2 Sep 2009: System Operations Committee (SOC) recommends:  Regional Group Continental Europe: The change from the UCTE format to CIM was decided by the UCTE Steering Committee. The goal is to switch to the new format before the end of 2010 at the latest (DACF exchanges)  Other Regional Groups to consider implementation of the standard with an aim of the pan-European harmonization  2 Dec 2009: SDC and SOC: Approved the roadmap for future development and implementation of updates of the CIM/XML format  11 Dec 2009: SDC, SOC and Market Committee: Approved ENTSO-E CIM Interoperability tests ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 5 of 17

ENTSO-E Secretariat serves as a central function of coordination, maintenance and support of Common Information Model (CIM) related issues and therefore, it is the interface to international organizations 6 - Maintenance ENTSO-E CIM tools; - contacts with providers Requests that concern CIM must be submitted to Secretariat ENTSO-E Data Expert Group System Development Committee Operations Committee Market Committee WGs defining needs International organizations: IEC, EPRI, CIMug, … - Liaisons, - Submitting ENTSO-E needs, - - Participation in the discussion, - etc - Discussion on Committees/WGs requests; - Information on IEC opinion; - Possible solutions - etc. CIM tools Secretariat WGs defining needs WG NM&D WG EDI SG NMFT in RG CE CIMdesk; Migration Converter ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 6 of 17

Current ENTSO-E CIM/XML Profile  Current ENTSO-E Profile is the “UCTE CIM Profile” tested in UCTE IOP in March 2009 in Paris. THIS IS THE PROFILE THAT IS BEING IMPLEMENTED BY ENTSO-E MEMBERS.  Updates of this profile should follow the approved Roadmap  Proposals for changes are welcome and will be discussed within ENTSO-E, IEC and will be tested in the ENTSO-E IOP once agreed among IOP participants.  Current ENTSO-E CIM/XML profile is published on ENTSO-E web site (CIM part:  A draft version of the second edition of the ENTSO-E CIM/XML profile is developed for the ENTSO-E interoperability test in July 2010 ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 7 of 17

Roadmap for future implementation of CIM  The aim: to structure the implementation effort. No yearly implementation. An exception could be only if a change is introduced which is critical for ENTSO-E processes  The implementation process is foreseen to last one year.  On regular basis the implementation effort is foreseen every three years, if necessary.  Next versions of the ENTSO-E Profile have to be approved by SDC. In case of changes that affect operational data, SOC decision is also required.  SDC or SDC&SOC decision ensures one year implementation period. Coming into force date is fixed and mandatory for TSOs ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 8 of 17

ENTSO-E CIM Interoperability Tests  1 st ENTSO-E Test “CIM for System Development and Operations” was announced on 29 Jan  Registration for vendors was closed on 26 Feb at 17:00h CET  The test will be held in Brussels in the week of 12 July Test name / Schedule on 1. ENTSO-E IOP “CIM for System Development and Operations” May-JuneMarch-April 2. ENTSO-E IOP “CIM for Energy Market” October- November May-June Postponed for 2011 Week of 12 July 2010 ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 9 of 17

ENTSO-E CIM Interoperability Tests Registered vendors  BCP Busarello + Cott + Partner AG (NEPLAN)  Siemens Power Technologies International (PSS/ODMS; PSS/E)  CESI (SPIRA; CRESO; SICRE)  Tractebel and RTE (EUROSTAG)  ABB Power Technologies (ABB Network Manager)  Open Grid Systems (Cimphony)  FGH (INTEGRAL7)  SISCO (UIB Adapter for PI-AF)  ABB (BMS CIM Explorer)  Intercompro AG (ISPEN)  EMS (Power System Analyzer, PSA)  AREVA T&D (e-terrasource; e-terraplatform)  EDF R&D (GEDEON Database; CIMclipse; CIM-ENTSO-E Converters)  DIgSILENT GmbH (PowerFactory 14.1)  TIBCO (TIBCO ActiveMatrix platform)  GE Energy (Enterprise Gateway) In addition to these vendors, GE Energy (PSLF) is interested to participate in the preparation leading up to the Interoperability test, but will not participate in the actual test. ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 10 of 17

ENTSO-E CIM Interoperability Tests Registered test witnesses  Svein Olsen (Statnett, Norway)  Vladimir Milic (EMS, Serbia)  Marcel Forlong (Amprion, Germany)  Reinier van Offeren (TenneT, Netherlands)  Oana - Raluca STANESCU (Transelectrica, Romania)  Adriano Gubernali (TERNA, Italy)  Domenico Iorio (TERNA, Italy) – but as substitute – not sure if he attends  Pietro Capurso (TERNA, Italy)  Tomasz Rogowski (PSE-Operator, Poland)  Pierluigi Portoghese (TERNA, Italy) – but as substitute – not sure if he attends  Marc Emery (swissgrid, Switzerland)  Michael Rotzinger (swissgrid, Switzerland)  Oana Udrea (Transelectrica, Romania)  Gorazd Berginc (ELES, Slovenia) ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 11 of 17

IOP Plans  5 days IOP (12-16 July 2010)  Final report of the IOP available shortly after the test on ENTSO-E and CIMug web sites  Profile and test files also publicly available  Identified CIM issues listed in the final report and submitted to IEC WG13 for further discussion ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 12 of 17

ENTSO-E and CIM Tools  CIMdesk  Visualization and editing tool developed by PowerInfo LLC, US  Provides users with possibilities for direct editing of CIM data exchange format and graphical visualization  It is not related to the migration. It will be used and maintained as long as CIM /XML format is used  Maintenance contact ends in July A new maintenance contract which includes re-licensing conditions is now negotiated  Migration converter  Developed by EDF R&D, FR  Converts from UCTE CIM to UCTE DEF (current version: version 02) and vice versa  To be used during the migration stage; useful for RG Continental Europe  Maintenance contract ends in the end of 2010 ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 13 of 17

ENTSO-E exchanges in CIM  System development – planning exchanges Still in migration period. Implementation efforts are necessary from both sides users and vendors. Some TSOs already provide models in CIM Lessons learned: Testing with real data is necessary. IOP test cases cannot fully represent all modelling approaches More complex test models are needed. The role of CIMug and IEC in test models preparation is to be discussed Some vendors introduced post IOP changes which made real interoperability not possible. Off-line IOPs may need to be performed.  DACF process The goal is to complete migration stage by the end of 2010 Test exchanges started on 8 June 2010 ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 14 of 17

CIM and ENTSO-E web site ( ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 15 of 17

ENTSO-E CIM in the CIMug web site ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 16 of 17

Summary  ENTSO-E TSOs are implementing CIM in order to  improve and harmonize data exchange processes  improve the quality of network analyses Therefore, to ensure fulfillment of ENTSO-E tasks defined by the 3 rd Energy Package the EU  ENTSO-E set up an internal process in order to deals with CIM issues  ENTSO-E would like to base its profiles on the IEC CIM Standards. This will be possible only if CIM is developed following clear roadmap that avoids major changes of already implemented classes.  ENTSO-E will not be able to follow yearly updates on regular basis. Therefore changes in ENTSO-E Profile and IEC Standards will be carefully analyzed and applied in accordance with ENTSO-E needs.  ENTSO-E will actively participate in the CIM development process by providing technical expertise and a platform to demonstrate interoperability (IOPs covering WG13 and WG16 topics) ENTSO-E Roadmap on CIM | Chavdar Ivanov | 18 June 2010 | Page 17 of 17