Budget Summary Linac-4 Instrumentation review CERN, 18.10 2011 Uli Raich BE/BI.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Lyon 2005 DIPAC Lyon th DIPAC Lyon June 2005Ulrich Raich CERN AB/BDI Instrumentation in small, low energy machines Ulrich Raich CERN AB-BDI.
Commissioning LHC Beam Instrumentation for Nominal Bunch Intensities Beam Commissioning Working Group June 15 th 2010 Rhodri Jones (CERN Beam Instrumentation.
APT progress and resource discussion HS; 9 th March 2012.
Personal Finance Budgeting-Chp. 6 Day 11. Step 3: Preparing a Budget Worksheet  Budget worksheet-a planning document on which you record your expected.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
Monitoring and Control Earned Value Management (EVM)
Beam Position Monitors MICE CM Harbin January, 2009.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Schedule  An organized written plan to help reach your goals within a certain period of time.
What I figured out up to now PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 1.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
Roberto Tenchini CMS FB December 2004 CMS Tracker The Tracker Cost Review - November 2004.
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
PS Days, January 2001 The “Plan” B.W.Allardyce The Medium Term Plan is presented at the June FC meeting by the Management and covers 4 years (I.e. in June.
EVM and Main Linac Prototype Modules - CLIC B. Daudin – GS-AIS-PM.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
“Performance of BTVs during the CNGS commissioning” E. Bravin AB/BI NBI th International workshop on Neutrino Beams and Instrumentation 4-9 September.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Lifestyle Costs Money management is the process of planning how to get the most from your money.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA UNCLASSIFIED LANSCE Beam Diagnostics R&D Presented by James Sedillo.
Project Management Performance Measures. Project Performance Measurement The purpose of performance measurement is to help organizations understand how.
BI Activities for LS2 Ray Veness for BE-BI.
East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
7/06/20111 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Linac4 Ion Source Review Design and Production New LINAC4 Front end Chamber.
MONEY MANAGEMENT VOCABULARY. Budget: an estimate of income and spending for a certain period of time. Budget: an estimate of income and spending for a.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
BUDGETING & SAVING. THE NEXT LOGICAL STEP Let’s review: 1 st we learned how to manage our time What are some important characteristics of good time management?
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
BI Offline Algorithm Framework Some Examples of What It Can Do for Us.
Dakar, Senegal 2014 Beam Diagnostics Lecture 1 Ulrich Raich CERN BE - BI (Beam Instrumentation)
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
28/01/2013 Gerrit Jan Focker, BE/BI/PM 1 Isolde SGIU Beam Instrumentation Remarks on status and possible development.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
AIDA Governing Board meeting 30 March 2012, DESY Use of resources in Y1 and distribution of EC pre-financing (2nd installment) S. Stavrev, CERN Administrative.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Linac4 Project Meeting 1/ /01/ st priority 2  First priority: from the Linac4 project, the best wishes to you and your families for a 2010.
ESS Front End diagnostic
Brief Status SPS Prototype PSB Prototype Installed in LS1
East Hall under construction
LIU Wire Scanner Milestones June 2017
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
LIU – EVM status and next steps
Beam Diagnostics Instruments
BE-BI Software for LINAC4
AWAKE proposals for BE/BI
Status of the BI Work Package in the LIU-PSB frame
AMMS-WG BE-BI and PPE 9/12/2018.
LIU Wire Scanner Series Costs
LINAC4 LEBT beam size and emittance diagnostics
Spending plan Essentials
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Budgeting.
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
Status of the BI Work Package in the LIU-PSB frame
Pathways to Success Budgeting Part 2 (lesson 9)
Presentation /13 Budget Allocation
Presentation transcript:

Budget Summary Linac-4 Instrumentation review CERN, Uli Raich BE/BI

EVM, EDH, budget codes … EVM: stands for Earned Value Management –The project is subdivided into workpackages –Work package “Beam Instrumentation” has workpackages which correspond to types of sensors: BCT, BPM, SEM … –Progress must be reported each month –Used by the project management to follow progress EDH: Electronic Document Handling –Contains all orders, workshop jobs … Budget Codes –Expenditures are assigned to budget lines. The budget codes are “filled” yearly 10/18/2011CERN Linac-4 instrumentation review Uli Raich BE/BI 2

Budget review At the beginning of the projects non-instrumentation expenditures have been put onto instrumentation budget codes EVM work packages do not map onto budget codes One budget code for several instruments (work packages) Initial budget is assigned to work packages -> Difficult to get an overview -> Go through all EDH orders since 2007 to assign expenditure to correct work package 10/18/2011CERN Linac-4 instrumentation review Uli Raich BE/BI 3

Budget Summary Instrument Still to be paid Total spent Grand total foreseen Faraday Cup BCT BPMs MCHF BSM Emittance M BLMs BTVsWill be replaced by SEMGrids Profile MCHF BTV 10/18/2011CERN Linac-4 instrumentation review Uli Raich BE/BI 4

Budget Summary (2) Emittance Meter oversprends by 80 kCHf (initial estimation 400kCHF for 2 instruments, later corrected to 480 kCHF for 1 ½ instruments BCTs will overspend by 110 kCHF (390 kCHF -> 600 kCHF) (more different types than initially foreseen) BPMs will overspend by 200 kCHF (800 kCHF -> 1000 kCHF) There will be no BTVs but these will be replaced by SEMGrids (which are more expensive) 10/18/2011CERN Linac-4 instrumentation review Uli Raich BE/BI 5

Budget Summary (3) BLMs: The budget was already been reviewed in March Very little or no overspending is foreseen SEMGrids, Wire Scanners and TV screens The budget was overestimated (fortunately!) –Old electronics used 1 electronics card + 1 cable per channel and the cost estimate was based on this –New electronics uses 1 multi conductor cable + 1 electronics card per sensor plane. Globally: We need to reshuffle budgets internally but should be able to stay within the allocate budgets. We will however also not under spend! 10/18/2011CERN Linac-4 instrumentation review Uli Raich BE/BI 6