Design Considerations for BRT Level Boarding Station Platforms

Slides:



Advertisements
Similar presentations
Using GPS to Track Pole Truck Turning Movements
Advertisements

COMMITTEE ON UBS CORE GROUP ON UBS CORE GROUP ON UBS Professionals/ Experts OEMs-Bus, ITS Asso. of bus body builders SIAM ASRTU CIRT & ARAI Operators.
Streetcar Production – Final Phase Transportation and Trinity River Project Committee 14 April 2014.
ATN Applications: Montgomery County, Maryland Transit Opportunities Advanced Transit Association Annual Technical Meeting January 11, 2014 College Park,
GIS Data in Real-Time Transit Management Systems 2011 GIS in Public Transportation Conference St. Petersburg, FL, September 14, 2011.
2007 Intermodal Operations Planning Workshop Bus Stop & Bus Lane Capacity: Planning Bus Routes in Downtown Seattle Owen Kehoe, PE, PTOE Transportation.
EURO – ZEL 2011 IMPROVING BOARDING ASSISTANCE SYSTEMS PRACTICE Goran Simić*, Bernhard Rüger**, Dragan Milković* * University of Belgrade ** Vienna University.
CENTRAL CORRIDOR TRANSIT ACCESS STUDY Citizens for Modern Transit March 27, 2014.
© 2010 Bentley Systems, Incorporated Ron Gant, P.E., Bentley Systems, Inc. Virtual Design & Construction: 3D Information Modeling.
Facility Layout 7 Personnel Requirements Shipping and Receiving.
BRT Vehicle Development: Where Do We Go from Here? Cliff Henke, Parsons Brinckerhoff TRB National BRT Conference, August 2012.
East Bay Bus Rapid Transit Project Description August 11, 2011.
Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project.
© 2004 by Carnegie Mellon University The Society of Automotive Engineers (SAE) Architecture Analysis & Design Language (AADL) Standard An International.
Lecture 6 Bus Rapid Transit, design elements and operational issues Dr. Muhammad Adnan.
TRB/APTA 2004 Bus Rapid Transit Conference Implementing a BRT Project: The Preliminary Steps 8:30 – 9:50 a.m. Frank SpielbergBMI-SG Incoming Chair, TRB.
I-15 Managed Lanes: Building on Success And Lessons Learned I-15 Managed Lanes: Building on Success And Lessons Learned.
Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner.
A Practical Approach to Bus Rapid Transit (or is it Road Rapid Transit…?) Cliff Henke NABI USA Sales and Marketing.
Euclid Corridor Design TRB BRT Workshop July 21, 2008.
Striangle Inc. Confidential 1 Striangle Inc Business Overview.
Oracle Release 12 Migration Project ARC Annual Customer Conference June 9, 2010.
Cheryl Thole, Jennifer Flynn CUTR/NBRTI, Senior Research Associates Transit in GIS Conference September 14, 2011 St. Petersburg, Florida.
Bus Stop Design Guidelines - In Support of Effective Service Planning
BRT Vehicle Development. New Flyer Overview  Winnipeg, Manitoba since 1930 Three US facilities  Industry-leading market share of 42%  Commercial relationships.
The Case: Computer vs. Human. Computer Case Contains the major components of the computer. It helps protect them from outside elements. Cases are usually.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
Overview of Vehicle Assist and Automation (VAA)Technologies and Applications Rob Gregg Director, Transit Management & Innovation NBRTI/CUTR/University.
Shelton School District Precise Vehicle Placement
Lead the Way APTA Transit Standards Development “BUS RAPID TRANSIT”
BRT Vehicles: Latest Technologies and Procurement Trends Cliff Henke Sr. Analyst, BRT and Small Starts Parsons Brinckerhoff Americas APTA/TRB BRT Conference,
7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
CEO, Greater Cleveland Regional Transit Authority
Bus Rapid Transit Infrastructure Design Roadway and Junctions Bus stops Shreya Gadepalli Senior Program Director Institute for transportation and.
New Starts/Small Starts and BRT: An Update APTA Bus Conference Seattle, WA May 5, 2009.
Field Operational Tests of Vehicle Assist and Automation Technologies California-Oregon VAA Team Ching-Yao Chan and Wei-Bin Zhang 5 th National BRT Conference.
Design of Parking Facilities Chapter 16 Dr. TALEB M. AL-ROUSAN.
Design Vehicle CE 453 Lecture 6. 2 Design Vehicle ► Design Vehicle – largest (slowest, loudest?) vehicle likely to use a facility with considerable frequency.
Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices.
Project Overview RTC Sahara Express Bus Rapid Transit (BRT) Project 12-mile BRT corridor Hualapai Way to Boulder Highway Side-running dedicated transit.
TRB/APTA 2004 Bus Rapid Transit Conference Implementing a BRT Project: The Preliminary Steps 8:30 – 9:50 a.m. Frank SpielbergBMI-SG Incoming Chair, TRB.
1 Using Automatic Vehicle Location Data to Determine Detector Placement Robert L. Bertini, Christopher Monsere, Michael Wolfe and Mathew Berkow Portland.
Left Lane Mixed-Traffic BRT August 22, 2012 Stefano Viggiano and Jack Gonsalves.
Accessible BRT: Getting It Right From the Start Cosette Rees Lane Transit District Eugene, Oregon 2009 Bus Rapid Transit Conference.
King Fahd University of Petroleum and Minerals Civil Engineering Department CE599-Seminar Traffic Calming Techniques By: Maen A. Abu Olba.
Machines. Simple Machines  Work out is less than or equal to Work in.  Force out can be greater than Force in.
Chapter 191 Chapter 19: Elements of Intersection Design and Layout Make an initial sizing of the intersection Make an initial sizing of the intersection.
Special Right Triangles Thank you, Mrs. Spitz, wherever you are. Adapted from internet version.
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
Greater Cleveland Regional Transit Authority Cleveland HealthLine Bus Rapid Transit Kenneth G. Sislak, Associate Vice President; Manager of Transit/Rail.
1 Bus Rapid Transit Strategic Plan May BRT Strategic Plan Evaluate feasibility and effectiveness of six BRT corridors Establish framework for.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Multiply By 2-Digit Numbers (B) Unit 2 Lesson 6. Objectives:
Automotive Engines Theory and Servicing
Charleston County Council Meeting
9.4 Special Right Triangles
Overview for today Exam review Class transitioning Final project
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
9.2 Special Right Triangles
Special Right Triangles
Tapping Transit to Transform a Thoroughfare
Software Reuse Objectives
ActivRAC® Layout Considerations
Bus Rapid Transit Study
Dee1 View from back of back plate
RTC RIDE Service Improvement Recommendations
BRT Station Capacity Analysis
Automotive Engines Theory and Servicing
Presentation transcript:

Design Considerations for BRT Level Boarding Station Platforms 2009 Bus Rapid Transit Conference Design Considerations for BRT Level Boarding Station Platforms Christopher Hemmer, PE Supervising Engineer Parsons Brinckerhoff Portland, Oregon Isabella Bejarano, PE Lead Engineer Parsons Brinckerhoff Portland, Oregon QUALITY TRANSIT -- NOW

2009 Bus Rapid Transit Conference What is Level Boarding? • The boarding areas are designed to provide horizontal and vertical gaps compliant with ADA requirements or easily traversed with a short bridgeplate. • Platform heights of 10 inches or greater QUALITY TRANSIT -- NOW

2009 Bus Rapid Transit Conference Why Level Boarding is Advantageous • Reduced Dwell Times • Improved Accessibility • System Branding QUALITY TRANSIT -- NOW 3

2009 Bus Rapid Transit Conference Docking Technologies • Precision Guidance Techniques: Special Curbs Mechanical Guidance Electronic Guidance Manual Docking QUALITY TRANSIT -- NOW 4

2009 Bus Rapid Transit Conference Methodology • Turning Templates – Turning templates were generated using AutoTurn version 6 software from Transoft Solutions • Bus models – Most modeling efforts used a custom generated template based on the New Flyer BRT articulated vehicle (63- foot length) in use in Eugene, Oregon and Cleveland, Ohio. QUALITY TRANSIT -- NOW 5

2009 Bus Rapid Transit Conference Bus Pullouts QUALITY TRANSIT -- NOW 6

2009 Bus Rapid Transit Conference Approach Considerations QUALITY TRANSIT -- NOW 7

2009 Bus Rapid Transit Conference Approach Length vs. Rear Door Gap QUALITY TRANSIT -- NOW 8

2009 Bus Rapid Transit Conference Departure Considerations QUALITY TRANSIT -- NOW 9

2009 Bus Rapid Transit Conference Springfield Transit Station QUALITY TRANSIT -- NOW 10

2009 Bus Rapid Transit Conference Springfield Transit Station QUALITY TRANSIT -- NOW 11

2009 Bus Rapid Transit Conference Dedicated EmX BRT Bay QUALITY TRANSIT -- NOW 12

2009 Bus Rapid Transit Conference Level Boarding Platform QUALITY TRANSIT -- NOW 13

2009 Bus Rapid Transit Conference Deployed Ramp QUALITY TRANSIT -- NOW 14

Level Boarding Platform Design Considerations 2009 Bus Rapid Transit Conference Level Boarding Platform Design Considerations • Vehicle Turning Movements • Defined Layout Limits • Clearance Considerations QUALITY TRANSIT -- NOW 15

2009 Bus Rapid Transit Conference Clearance Considerations QUALITY TRANSIT -- NOW 16

2009 Bus Rapid Transit Conference Departure Maneuver Conflict QUALITY TRANSIT -- NOW 17

2009 Bus Rapid Transit Conference Platform Configurations • Superstop • Sawtooth QUALITY TRANSIT -- NOW 18

2009 Bus Rapid Transit Conference Recommended Sawtooth Geometry QUALITY TRANSIT -- NOW 19

Springfield Transit Station – Lessons Learned 2009 Bus Rapid Transit Conference Springfield Transit Station – Lessons Learned • Sawtooth Configuration • Vehicle Characteristics 3D • Bellows • Bus Test QUALITY TRANSIT -- NOW 20

2009 Bus Rapid Transit Conference Next Steps • Data gathering • Expand model QUALITY TRANSIT -- NOW 21