Toronto In Question Moving People: Responses to Congestion Steve Munro October 25, 2011.

Slides:



Advertisements
Similar presentations
York Viva Bus Rapid Transit (BRT) Concept image along Davis Drive.
Advertisements

Project Prioritization Framework Principles
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
An Advanced Transit Alternative for The Princetons Alain L Kornhauser 24 Montadale circle Board Chair Advanced Transit Association Founder ALK Transportation.
11 Tunde Balvanyos, Ph.D. Bus Rapid Transit Coordinator, Pace APTA BRT May 2009.
Introduction and the Context The Use and value of Urban Planning.
Public Information Sessions November 30, 2010: City Center at Oyster Point December 1, 2010: HRT Norfolk.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
The SMART CHOICES PROGRAM and TRANSIT-ORIENTED DEVELOPMENT Presentation to ETS Annual Community Conference March 11, 2006.
Lec 31, Handout: Public passenger transport (objectives) Be familiar with mass transit classifications and characteristics Know how urban transport demands.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
The Urban Transport Problem  Fifth Freedom Problem- auto convenience and privacy  Congestion- traffic overloads, poor infrastructure, vehicle diversity.
Center City Access Strategy A Transportation Vision for Growth and Access.
CHAPTER 10 Light Rail GUIDELINES FOR PASSENGER TRANSPORT IN SOUTH AFRICA A MULTI MODAL ANALYSIS.
Business Logistics 420 Public Transportation Lectures 8: The Performance and Condition of Transit in the United States.
Reinventing Transit A European Perspective David Bayliss.
Calgary Regional Partnership Workshop BC Transit Governance and Funding Experience Bill Lambert, Manager, Transportation Solutions, April 16, 2013.
1 Metrolinx delivers The Big Move Regional Transportation Plan: Transforming Transportation in the Greater Toronto and Hamilton Area November 5, 2012 Bruce.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
Enter Presentation Name Public Works Transportation Division ACT Canada Sustainable Mobility Summit Hamilton, Ontario Transit Plenary November, 7, 2012.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009.
Transit Priorities for Toronto Transport Action Ontario Oct 12, 2010 Metro Hall - Toronto Presenter: Bruce Budd.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Feasibility Study Jonathan CalderwoodJune 14, 2013 West Shore Communities Feasibility of Sustainable Transportation with Passenger Ferry Service.
Sustainable travel for Limerick and Area By Professor Lewis Lesley.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
Green Transport Dr Lina Shbeeb Minister of Transport. Jordan.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
1/30/03 Page 1 Rescue Muni’s Recommendations for Geary Rapid Transit For PAR 1/30/2003.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
Official Plan Zoning Bylaw Land Uses
Rapid Transit for Toronto February 8, Metrolinx “5 in 10 Plan” - October 2010 Light Rail Transit Projects New Rapid Transit for Etobicoke North.
Imagine the Possibilities… Vision from the 2002 Rail Plan.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
How Would a Transportation – Land Use Grant Program Work in the Washington Region? Presentation to the Transportation Planning Board Technical Committee.
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Putting Luas Cross City in context - Public Transport and Sustainable Measures in Dublin Dublin City Council 21 st March 2013 Gerry Murphy.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Business Logistics 420 Urban Transportation Fall 2000 Lecture 2: The Scope of Public Transportation Services.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
Urbanization Key Issue #4: Why do suburbs have distinctive problems?
DOWNTOWN MOVES TRANSFORMING OTTAWA’S STREETS
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
1 Ontario’s 2012 Transit-Supportive Guidelines ACT Canada - Sustainable Mobility Summit Hamilton, Ontario, November 7, 2012 Ministry of Transportation.
Defining Alternative Scenarios MTC Planning Committee and ABAG Administrative Committee May 13, 2011.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
Service Guidelines and Standards Capital Metropolitan Transportation Authority Board of Directors Meeting September 2015 capmetro.org |1.
Valley Metro Update Open House and Public Hearing March 9, 2007.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Metropolitan Council Transit Capital Improvement Program October 10, 2007.
MODULE 3: PLANNING & DESIGN Lesson 2: Modal Characteristics and Impacts.
Multi Agency Exchange May 16, 2017.
Gunnison Valley Transportation Authority (RTA) 2016 Transit Planning Process Funded through a Section 5304 Planning Grant 5/23/2018.
Regional Roads Committee
Introduction This presentation will provide an overview of the transit situation in Middle Tennessee and what organizations like the Transit Alliance of.
Introduction This presentation will provide an overview of the transit situation in Middle Tennessee and what organizations like the Transit Alliance of.
Focus40 Overview A long-range plan for how the MBTA can meet the needs of the region in 2040: A 20-year plan as required by MBTA enabling legislation A.
M14A/D Select Bus Service
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Presentation transcript:

Toronto In Question Moving People: Responses to Congestion Steve Munro October 25, 2011

Introduction Is Toronto a “Transit City”? Population and transportation network growth 1971: A lost opportunity for transit Technology wars Are today’s policies and agencies viable answers to our problems? What are roads for? Can we “solve” congestion?

Is Toronto a “Transit City”? Riding habit in Toronto (416) is high by North American standards, but concentrated in areas and corridors with frequent service Riding habit beyond the “old” city falls off quickly and is generally below 10% in the 905 –Growth in GO Transit riding to the core unmatched by transit growth to other parts of the region Political and popular support for transit depends on “what can it do for me” Opposition to transit based on “what will it do to me” This is not a 416/905 issue. –Spadina (proposed 1973, opened 1997) –St. Clair (competition for space, construction delays) –Queen’s Quay (arterial vs local road, local access, special considerations for tourism, signal priority design) –Transit City proposals for road redesign

Subway Envy Why don’t we have a subway network like New York, London, Paris? Population of Toronto in 1900 –Old city: 208k “416”: 238k Population of major cities in 1900 –New York: 3.4m –London: > 6m –Paris: > 3m During the period when private transport was rare and expensive, major “transit cities” had much larger populations than Toronto Public transit had no competition, served dense cities and operated at a profit

St. Clair & Dufferin 1912

Bathurst North of St. Clair 1912

“Radial” Line to Lake Simcoe 1914

Prince Edward Viaduct (1918) Bloor-Danforth Subway (1966)

TTC System Reconstruction and Expansion

Toronto Plans for Cars (1943)

1943 Plan Including Rapid Transit

Metro Toronto Road Plans (1954)

1964 Recommended Plan

1969: Subways Are Not The Only Answer “Following completion of the Spadina and Queen subway lines, consideration should be given to rapid transit lines which would act as feeders to major subway radials or circumferential lines operating through lower density areas which cannot justify the expense of full subway operation. “Intermediate capacity rapid transit lines are conceived as operating on private or exclusive grade-separated surface rights-of-way but with lighter equipment, minimal station facilities, and on-board ticket collection wherever possible. Initially, service on such lines might be provided by P.C.C. car type vehicles. It is believed that the capacity of such lines should be in the order of ten to twenty thousand passengers per hour and the T.T.C. is undertaking a study to arrive at a possible design of a suitable lightweight vehicle for this type of high speed service.” From “A concept for integrated rapid transit and commuter rail systems in Metropolitan Toronto”, TTC, February 1969, Page 13 The TTC was working with Hawker-Siddeley on a new streetcar design, but this was pre- empted by Provincial schemes for “Intermediate Capacity Rapid Transit”.

TTC Concept Plan (Feb. 1969)

1971 Davis government kills Spadina Expressway plan Capacity expansion will focus on transit “Cities are for people” But … –How to build transit without spending a fortune? –The myth of the “missing link” between buses and subways –The birth of “Intermediate Capacity Transit Systems” and high-tech “solutions” –Magnetic levitation trains will solve everything It didn’t quite work out that way

1972 to 1985 “Streetcars for Toronto” fought to save the streetcar system as a basis for future suburban growth (similar to TTC 1969 plan) Streetcars didn’t fit with Provincial dreams of new technology development TTC management didn’t really embrace streetcars as a transit technology except, possibly, for new suburban routes New Toronto streetcar project didn’t get seriously underway until Queen’s Park needed a replacement for the failed Maglev project CLRVs ( ) and ALRVs ( ) The Scarborough line was originally planned as LRT using CLRVs and included an extension to Malvern Queen’s Park had continued support for development of a new technology which eventually became the “RT”, and they forced this technology on Toronto. The high cost (> 2x LRT) precluded any extension beyond the original terminus or use of RT as a subway alternative.

Canadian LRT in the West Edmonton: –Started construction in 1974 –Now 20.5km Calgary: –Started construction in 1977 –Now 48.8km Both systems use standard European cars and are substantially on private rights-of- way

Vancouver Skytrain B.C. chose the Scarborough RT technology because the Minister of Municipal Affairs and Transit didn’t like streetcars Strong support from Ontario government to showcase “RT” technology for Expo 86 First line opened in 1985 Now 68.7km The technology works well in Vancouver because of available rights- of-way, terrain, demand level, government funding, strong management commitment and weather. New LRT alternatives run aground on integration issues with the established network. Canada Line (to the airport) does not use RT technology. It is an automated small-scale subway.

Technology Wars: What is LRT? The original idea was a mode that was simpler and physically lighter than a subway (“Heavy Rapid Transit”) Essential characteristics: –Right-of-way can be shared with cars and pedestrians Overhead power supply, manual train operation –Simple stations, possibly at grade (affects cost and accessibility) –Short trains (affects station size) –Tighter turns and steeper grades than HRT Evolution “up” from streetcar, not “down” from subway

Comparing Technologies Advocates may be selling a technology or an agenda Look at the full implications of choosing a technology: –Capital and operating costs –Station design and operations –Pedestrian circulation at high-volume locations –Intrusion of structures on neighbourhoods and future development –Expansion capacity, requirements and alternatives

What’s Available? Full grade separation –Subways and intermediate capacity automated systems –Commuter rail (may have limited instances of grade crossings in light traffic areas) Partially private right-of-way and/or grade separation (degree varies depending on situation) –LRT –Bus Rapid Transit (BRT) –Capacity depends on train/vehicle length and station design Passing lanes and multiple stopping bays require extra space Mixed traffic operation –Buses (regular, articulated, diesel, electric) –Streetcars –Taxis & vans Marine –Ferries (specific to local geography, e.g. Vancouver SeaBus)

Failed Options Compressed Natural Gas Buses –Replaced Trolley (Electric) Buses in Toronto –Far more complex and unreliable than hoped –A marriage of convenience between TTC management (anti- electric bus), Queen’s Park (transportation technology advocates), the gas industry (surplus product looking for a market) and bus builder (untendered “demonstration” contract) Hybrid Buses (Battery/Diesel/Electric) –Large cost penalty (+50%) –Reliability problems –Benefits depend on duty cycle (stop-start traffic, hills) –Skewed evaluation of what is “green”

Fantasy Options Swan Boats –Require rivers or canals –Difficulty of grades (flumes? trebuchets?) –Weather issues (sleighs?) Gondolas –Best for severe topographical constraints (valleys, hills) Bi-planes –Personal rapid transit –High staff to passenger ratio Monorails All have –Proven technology –Tourism potential –Capacity constraints –Station design, access and intrusiveness problems –Limited real-world potential

Swan Boats

Monorails, Gondolas, Biplanes

Evaluating Alternatives Too many studies start with the “solution” and work backward to schemes that will support a preferred choice. If you want subways, you will only choose routes where subways can be built, and you will size networks to available funding. LRT advocates argue that omitting lower-cost LRT options prejudices the evaluation for subways. LRT routes may include sections where subways are impractical for alignment, station spacing, cost and capacity. Subway advocates argue that this prejudices the evaluation for LRT. If you need elevated structures, you will look for wide streets and Hydro corridors even though these may not be ideal as the location of a transit service for access or land use. Drawing a line on a map can predetermine the technology selection and future network options.

Why Talk About Technologies? Remember the “missing link” myth? The embrace of a high-tech “solution” prevented Toronto from launching major transit expansion just at the time when political support was available, and suburban development had not precluded transit as an important component.

Where and When is this?

Where Is This (Another View)

And the answer is … Finch & Woodbine, 1965 “Woodbine” is now called “Highway 404” The suburbs were built around cars, not transit even when the need for better transit was recognized. Congestion is “built-in” to the GTA Ontario built too little, too late and without a significant commitment to transit except where it was easy to implement (GO rail corridors).

Suburban Subway Plans 1990 Peterson plan: A subway in every borough (Spadina, Sheppard, Eglinton, Bloor West, Scarborough extension, Waterfront LRT) Rae government kept this alive as a construction stimulus in the early 90s Harris killed all but Sheppard (needed to keep Mel Lastman onside for amalgamation proposal) Small-scale GO improvements focussed on peak-period core access GO access was mainly by car to parking lots Suburbs continued to grow as almost completely car- oriented communities

The “Last Mile” Problem Surface transit is important Transit riders do not behave like motorists Getting to the trunk route poses a significant penalty in travel time and convenience Local service is essential unless population is concentrated at major transit nodes. We have built low density and now must serve it.

Ridership Growth Strategy & Transit City Programs introduced by Mayor Miller RGS: Low cost, short term improvements to transit across the network –Loading standards –Hours of service –Fare levels and options Transit City: Network of LRT lines to bring faster, higher-capacity transit closer to much of Toronto –Eglinton (partly underground) –Scarborough (replace and extend RT) –Sheppard East –Finch West –Future: Don Mills, Jane, Waterfront West, Eglinton/Malvern Almost all of this has been sidelined by Mayor Ford without Council approval

Is Metrolinx a Solution or a Problem? MoveOntario2020: Provincial announcement in June 2007 (pre- election) –A compendium of existing local plans Queen’s Park handed the detailed planning work to their new agency, Metrolinx –Planners, not operators –Board composed mainly of local politicians The Big Move –Funding problems -- scope cut back even before it was released to get the cost down to $50m (2008) over 25 years –Many costs omitted (operations & maintenance, local feeder/distributor services) –No funding strategy beyond ad-hoc allocations –Spending for initial projects stretched into “out years” beyond current financial projections (after 2015)

Where Are Decisions Made? The real political and funding decisions for Metrolinx come from Queen’s Park, not from the “new” Metrolinx (with no politicians on the board) The Big Move 2.0 is coming, some day, but Queen’s Park spends most of its time re- announcing money it plans to spend over the next decade There is no sign of change in funding strategy or the embrace of new revenue streams such as tolls or regional taxes There is no local input to Metrolinx and most of its business is conducted in private

Are Politicians and Planners the Problem? Most politicians and many planners think like motorists, not like transit riders. Most politicians represent areas poorly served by transit. Spending is project oriented, not service oriented. Funding is granted to one scheme at a time, not to an ongoing plan of expansion and operations. The work (consulting) and prestige (ribbon cutting) is in big ticket construction and opening of new lines. “War on the Car” language implies transit must take second place for planning and funding

What Are Roads For? “Obvious” users: –Transit / Cars / Cycling / Pedestrians But there are also: –Parking & deliveries / Taxi stands / Street furniture –Legal and illegal uses Suburban streets are not the same as downtown –66-foot wide old city streets are not the same as Sheppard Avenue –Built form downtown faces the street and encourages pedestrian access, but has little room for greater capacity –Built form in suburbs faces onto parking lots (with some exceptions) and encourages car access –“Congestion” is different depending on the nature of the street, and one solution won’t fix all problems –Very difficult political and planning choices are needed about the allocation of road space to various types of users –Are cars the most important users of streets?

Can You Eliminate Congestion? Anyone who claims they can eliminate congestion is deluded or a liar. –Existing demand is very much greater than built capacity. –Population growth will match or outpace the rate of highway building or transit expansion. –Travel patterns are based on existing land use and road networks, not on corridors where transit can easily replace capacity/functionality. –Megaprojects address long-haul travel and specific corridor issues, but do not touch local problems

We Are Attacking the Wrong Problem Mobility throughout the region is needed, but this means different things in different places Transit measures must be widespread to benefit a large proportion of potential travellers Transit improvements may add capacity for mobility without reducing congestion Continuous improvement must be visible in the short term to convince politicians and voters than transit investment is worthwhile Sustained advocacy for transit is essential