MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.

Slides:



Advertisements
Similar presentations
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Advertisements

Omercan Barut Dokuz Eylul University Industrial Engineering.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Principles of Operations Management
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Operations Management
4. Production and Material Planning
Principles of Information Systems, Seventh Edition2 An organization’s TPS must support the routine, day-to- day activities that occur in the normal course.
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
MRP, MRP II, and ERP.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer.
Aggregate Planning and Resource Planning Chapters 13 and 14.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Material Requirements Planning (MRP) and ERP
Week #14-2 Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Chapter 3 Network and System Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Materials Requirements Planning
Operations Management Material Requirements Planning
Material Requirements Planning (MRP)
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 22 1.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Chapter 16 Inventory Systems for Dependent Demand
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Material Requirements Planning
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
14 - 1© 2014 Pearson Education Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer and Render Operations Management,
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
Concepts in Enterprise Resource Planning 4th Edition Chapter three Production and Supply Chain Management Information Systems 1Concepts in Enterprise Resource.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
Material Requirements Planning (MRP) and ERP
Materials Requirements Planning
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
Accounting Guru Cloud ERP (Enterprise Resource Planning) ERP Software https:
Operations Management
Material Requirements Planning (MRP) and ERP
LSM733-PRODUCTION OPERATIONS MANAGEMENT
Facility Inventory Old Facilities Modern Facilities Classroom Size
BUAD306 MRP/ERP.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
MRP and ERP.
Management Science 2 Material Requirements Planning (MRP)
Material Requirements Planning (MRP) and ERP
Operations Management
Production Management
Operations Management
Operations Management
14 MRP and ERP.
Operations Management
Operations Management
Material Requirements Planning (MRP)
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1

© 2008 Prentice Hall, Inc.14 – 2 WHAT IS MRP?  Material Requirements Planning  Dependant demand technique using bill of material, inventory, expected receipts, and a MPS to determine materials requirements 2

© 2008 Prentice Hall, Inc.14 – 3 Benefits of MRP 3 1.Better response to customer orders 2.Faster response to market changes 3.Improved utilization of facilities and labor 4.Reduced inventory levels

© 2008 Prentice Hall, Inc.14 – 4 Dependent Demand  The demand for one item is related to the demand for another item  Given a quantity for the end item, the demand for all parts and components can be calculated  In general, used whenever a schedule can be established for an item  MRP is the common technique 4

© 2008 Prentice Hall, Inc.14 – 5 Dependent Demand 1.Master production schedule 2.Specifications or bill of material 3.Inventory availability 4.Purchase orders outstanding 5.Lead times Effective use of dependent demand inventory models requires the following 5

© 2008 Prentice Hall, Inc.14 – 6 1.Master Production Schedule (MPS)  Specifies what is to be made and when  Must be in accordance with the aggregate production plan  Inputs from financial plans, customer demand, engineering, supplier performance  As the process moves from planning to execution, each step must be tested for feasibility  The MPS is the result of the production planning process 6

© 2008 Prentice Hall, Inc.14 – 7 Master Production Schedule (MPS)  MPS is established in terms of specific products  Schedule must be followed for a reasonable length of time  The MPS is quite often fixed or frozen in the near term part of the plan  The MPS is a rolling schedule  The MPS is a statement of what is to be produced, not a forecast of demand 7

© 2008 Prentice Hall, Inc.14 – 8 Master Production Schedule (MPS)  A customer order in a job shop (make- to-order) company  Modules in a repetitive (assemble-to- order or forecast) company  An end item in a continuous (stock-to- forecast) company Can be expressed in any of the following terms: 8

© 2008 Prentice Hall, Inc.14 – 9 The Planning Process Figure 14.1 Change production plan? Master production schedule Management Return on investment Capital Engineering Design completion Aggregate production plan Procurement Supplier performance Human resources Manpower planning Production Capacity Inventory Marketing Customer demand Finance Cash flow

© 2008 Prentice Hall, Inc.14 – 10 The Planning Process Figure 14.1 Is capacity plan being met? Is execution meeting the plan? Change master production schedule? Change capacity? Change requirements?No Execute material plans Execute capacity plans Yes Realistic? Capacity requirements plan Material requirements plan Master production schedule

© 2008 Prentice Hall, Inc.14 – 11 2.Bills of Material  List of components, ingredients, and materials needed to make product  Provides product structure  Items above given level are called parents  Items below given level are called children 11

© 2008 Prentice Hall, Inc.14 – 12 Bills of Material  Modular Bills  Modules are not final products but components that can be assembled into multiple end items  Can significantly simplify planning and scheduling 12

© 2008 Prentice Hall, Inc.14 – 13 Bills of Material  Planning Bills (Pseudo Bills)  Created to assign an artificial parent to the BOM  Used to group subassemblies to reduce the number of items planned and scheduled  Used to create standard “kits” for production 13

© 2008 Prentice Hall, Inc.14 – 14 Bills of Material  Phantom Bills  Describe subassemblies that exist only temporarily  Are part of another assembly and never go into inventory  Low-Level Coding  Item is coded at the lowest level at which it occurs  BOMs are processed one level at a time 14

© 2008 Prentice Hall, Inc.14 – 15 3.Accurate Records  Accurate inventory records are absolutely required for MRP (or any dependent demand system) to operate correctly  Generally MRP systems require 99% accuracy 15

© 2008 Prentice Hall, Inc.14 – Purchase orders outstanding  Outstanding purchase orders must accurately reflect quantities and scheduled receipts 16

© 2008 Prentice Hall, Inc.14 – 17 5.Lead Times  The time required to purchase, produce, or assemble an item  For production – the sum of the order, wait, move, setup, store, and run times  For purchased items – the time between the recognition of a need and the availability of the item for production 17

© 2008 Prentice Hall, Inc.14 – 18 MRP Structure Figure 14.5 Output Reports MRP by period report MRP by date report Planned order report Purchase advice Exception reports Order early or late or not needed Order quantity too small or too large Data Files Purchasing data BOM Lead times (Item master file) Inventory data Master production schedule Material requirement planning programs (computer and software) 18

© 2008 Prentice Hall, Inc.14 – 19 Safety Stock  BOMs, inventory records, purchase and production quantities may not be perfect  Consideration of safety stock may be prudent  Should be minimized and ultimately eliminated  Typically built into projected on-hand inventory 19

© 2008 Prentice Hall, Inc.14 – 20 MRP Management  MRP is a dynamic system  Facilitates replanning when changes occur  System nervousness can result from too many changes  Time fences put limits on replanning  Pegging links each item to its parent allowing effective analysis of changes 20

© 2008 Prentice Hall, Inc.14 – 21 MRP and JIT  MRP is a planning system that does not do detailed scheduling  MRP requires fixed lead times which might actually vary with batch size  JIT excels at rapidly moving small batches of material through the system 21

© 2008 Prentice Hall, Inc.14 – 22 Finite Capacity Scheduling  MRP systems do not consider capacity during normal planning cycles  Finite capacity scheduling (FCS) recognizes actual capacity limits  By merging MRP and FCS, a finite schedule is created with feasible capacities which facilitates rapid material movement 22

© 2008 Prentice Hall, Inc.14 – 23 Extensions of MRP  Closed-Loop MRP  MRP system provides input to the capacity plan, MPS, and production planning process  Capacity Planning  MRP system generates a load report which details capacity requirements  This is used to drive the capacity planning process  Changes pass back through the MRP system for rescheduling 23

© 2008 Prentice Hall, Inc.14 – 24 Material Requirements Planning II  Once an MRP system is in place, inventory data can be augmented by other useful information  Labor hours  Material costs  Capital costs  Virtually any resource  System is generally called MRP II or Material Resource Planning 24

© 2008 Prentice Hall, Inc.14 – 25 Closed-Loop MRP System Figure

© 2008 Prentice Hall, Inc.14 – 26 Enterprise Resource Planning (ERP)  An extension of the MRP system to tie in customers and suppliers 1.Allows automation and integration of many business processes 2.Shares common data bases and business practices 3.Produces information in real time  Coordinates business from supplier evaluation to customer invoicing 26

© 2008 Prentice Hall, Inc.14 – 27 Enterprise Resource Planning (ERP)  ERP modules include  Basic MRP  Finance  Human resources  Supply chain management (SCM)  Customer relationship management (CRM) 27

© 2008 Prentice Hall, Inc.14 – 28 ERP and MRP Figure

© 2008 Prentice Hall, Inc.14 – 29 ERP and MRP Figure Customer Relationship Management Invoicing Shipping Distributors, retailers, and end users Sales Order (order entry, product configuration, sales management) 29

© 2008 Prentice Hall, Inc.14 – 30 Table 13.6 Bills of Material Work Orders Purchasing and Lead Times Routings and Lead Times Master Production Schedule Inventory Management ERP and MRP Figure MRP 30

© 2008 Prentice Hall, Inc.14 – 31 ERP and MRP Figure Supply Chain Management Vendor Communication (schedules, EDI, advanced shipping notice, e-commerce, etc.) 31

© 2008 Prentice Hall, Inc.14 – 32 ERP and MRP Figure Table 13.6 Finance/ Accounting General Ledger Accounts Receivable Payroll Accounts Payable 32

© 2008 Prentice Hall, Inc.14 – 33 Enterprise Resource Planning (ERP)  ERP can be highly customized to meet specific business requirements  Enterprise application integration software (EAI) allows ERP systems to be integrated with  Warehouse management  Logistics  Electronic catalogs  Quality management 33

© 2008 Prentice Hall, Inc.14 – 34 Enterprise Resource Planning (ERP)  ERP systems have the potential to  Reduce transaction costs  Increase the speed and accuracy of information  Facilitates a strategic emphasis on JIT systems and integration 34

© 2008 Prentice Hall, Inc.14 – 35 Advantages of ERP Systems 1.Provides integration of the supply chain, production, and administration 2.Creates commonality of databases 3.Can incorporate improved best processes 4.Increases communication and collaboration between business units and sites 5.Has an off-the-shelf software database 6.May provide a strategic advantage 35

© 2008 Prentice Hall, Inc.14 – 36 Disadvantages of ERP Systems 1.Is very expensive to purchase and even more so to customize 2.Implementation may require major changes in the company and its processes 3.Is so complex that many companies cannot adjust to it 4.Involves an ongoing, possibly never completed, process for implementation 5.Expertise is limited with ongoing staffing problems 36

© 2008 Prentice Hall, Inc.14 – 37 THANK YOU 37 QUESTIONS