Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
2008 Transmission Expansion Plan Updates Tom Seeley, E.ON U.S.
Cleco Transmission Planning Summit 2012
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
Xcel Energy Projects From 2008 Reliability Assessment.
Midwest Energy, Inc. Transmission Planning and Expansion
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
Entergy Transmission Planning Summit New Orleans, LA July 31, 2007
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Distribution Networks For Large Cities: EPRI Research on Modelling and Analysis Roger DUGAN Sr. Technical Executive Electric Power Research Inst. US.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ISTEP Update Transmission Planning Summit August 11, 2009 Crown Plaza Hotel New Orleans, LA.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Oil Load Serving Study Update August 18 th, 2011.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
1 Entergy Gulf States, Inc. (Texas) Approved & Proposed Transmission Reliability Projects Entergy/ETEC Subcommittee Meeting The Woodlands, TX November.
6 Week industrial Training Presentation
2016 RTP Update November, 2016 RPG Meeting.
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
TONBRIDGE POWER GREEN LINE
Presentation transcript:

Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline

3 Small Project Information  T-Corners Transformer Replacement  Hyland Lake – Dean Lake 115 kV Upgrade  Woodbury – Tanners Lake Upgrade  Northeast Mankato 69 kV Plan  South Shakopee Substation  Ironwood Second Transformer  Ironwood Bus Upgrade  Lawrence Second Transformer  Tracy Switching Station Capacitors  Keegan Lake – Lebanon Hills  Prescott 10 MVAR Cap Bank

4 T-Corners 115/69 kV Transformer Replacement  Substation currently has two 115/69 kV transformers (#1 & #2)  Tx #1 – 62.5 MVA  Tx #2 – 112 MVA  Summer 2011 – Loss of Transformer #2 will load #1 to 80 MVA (128%)  Plan to replace existing 62.5 MVA bank with matching 112 MVA bank

5 T-Corners 115/69 kV Transformer Replacement Eau Claire Metro Area T-Corners 52 Miles

6 Ironwood Second Transformer  Ironwood 88/34.5 kV Transformer currently rated at 25 MVA  78 MW generation at Bayfront Substation  Loss of Bayfront 115/92 kV transformer sends Bayfront generation through 88 & 34.5 kV systems  Severely overloads Ironwood – Bayfront 88 kV line  Severely low voltages along Ironwood 34.5 kV system  Add second Ironwood 88/34.5 kV transformer

7 Ironwood Second Transformer

8 Ironwood Terminal Equipment Upgrade  Ironwood – Bayfront 115 kV conductor rated at 189 MVA (850 Amps)  Ironwood 115 kV substation equipment with various ratintgs  200 Amp CT  300 Amp Wave Trap  380 Amp Bus  400 & 800 Amp Breakers, 600 Amp Switches  Outage of Bayfront – Saxon Pump 88 kV line loads Ironwood 115 kV to 72 MVA (361 Amps)  Outage of Bayfront 115/92 kV transformer loads Ironwood 115 kV to 87 MVA (437 Amps)  Replace capacity-limiting terminal equipment

9 Lawrence Second 112 MVA Transformer  This project is to add an additional 115/69 kV, 112 MVA transformer at the Lawrence Substation in Sioux Falls. This is needed due to the double-circuit outage of the 115 kV line out of Split Rock to Cheery Creek.  In Summer 2011, loss of Split Rock-Cherry Creek and Split Rock-West Sioux Falls double-circuit outage results in a loading of MVA (130.2%) of the 112 MVA transformer at Lawrence.

10 Lawrence Second 112 MVA Transformer

11 Tracy SW 12 MVAR CAP  This project is to replace the existing 5.4 MVAR, 69 kV cap bank at the Tracy Switching Station with a new 12 MVAR cap bank.  In Summer 2006, for loss of the Lyon County 69 kV source, the following buses have low voltage: Walnut Grove = pu Tracy SS = pu Lake Sarah = pu Currie = pu Slayton = pu Hadley = pu Lake Wilson = pu

12 Tracy SW 12 MVAR CAP

13 Kegan Lake – Lebanon Hills 69 kV Line Upgrade  Reconductor the 3 #8 CU section of the Kegan Lake – Lebanon Hills 69 kV line to at least 48 MVA.  During 2011 summer peak conditions, the line overloads to 110.5% in the base case.

14 Kegan Lake – Lebanon Hills 69 kV Line Upgrade