The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

24-28 May, 2010 S. Mastroianni - 17th Real-Time Conference, Lisboa, Portugal ARGO-YBJ is a cosmic ray air shower detector based on a single layer of RPC.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Multichannel Analyzers A multichannel pulse-height analyzer (MCA) consists of an ADC, a histogramming memory, and a visual display of the histogram recorded.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
PSD upgrade: Ar-present and Xe-future 1.- Status of the PSD upgrade 2.- PSD performance after upgrade 3.- Problems during the Ar-run 4.- Future scenarios.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Применение MAPD (Zecotek) в адронных калориметрах и многоканальных времяпролетных системах в экспериментах по релятивистской ядерной физике Ф.Ф.Губер,
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
CBM ECAL simulation status Prokudin Mikhail ITEP.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
A.Olchevski, JINR (Dubna) Test Beam studiesof COMPASS ECAL0 Test Beam studies of COMPASS ECAL0 module prototype with MAPD readout ECAL0 Team, JINR, DUBNA.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Status of PSD simulation in Shine Oleg Petukhov Institute for Nuclear Research, Moscow NA61 Analysis/Software/Calibration meeting , Warsaw.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Trigger system for setup 2016 V. Rogov, V. Yurevich,D.Bogoslovski, S.Sergeev, O.Batenkov* LHEP JINR *V. G. Khlopin Radium Institute, St. Petersburg.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
Beam detectors in Au+Au run and future developments - Results of Aug 2012 Au+Au test – radiation damage - scCVD diamond detector with strip metalization.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
PreShower Characterisations
The PSD at Pb-Pb run PSD drawbacks at Ar beam
Beam detectors performance during the Au+Au runs in HADES
NRC Kurchatov Institute, ITEP I. Korolko, M.Prokudin, Yu.Zaitsev
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
CMS Preshower: Startup procedures: Reconstruction & calibration
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
F.Guber, A.Ivashkin INR, Moscow
CMS ECAL Calibration and Test Beam Results
BESIII EMC electronics
Commissioning of the ALICE-PHOS trigger
MPPC for T2K Fine-Grained Detector
B. Genolini for the IPNO detector dept.
Presented by T. Suomijärvi
Presentation transcript:

The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and future. - First estimation of the PSD capability for reaction plane measurements at NA61. A.Ivashkin on behalf of INR group 1 NA61/SHINE collaboration meeting, CERN September, 2014

2 PSD – Projectile Spectator Detector Precise measurement of the energy of projectile spectators. Centrality selection (on trigger level) Measurement of event-by-event fluctuations (to reduce N part fluctuations) Reconstruction of the reaction plane Compensating calorimeter Pb/scintillator (4/1) 60 sandwiches in one module Modules 10 x 10 x 120 cm 3 – central part Modules 20 x 20 x 120 cm 3 - outer part 10 longitudinal sections with 10 MAPDs readout PSD in 2011 PSD modules in 2011 Be-run

1.The PSD cooling system was not working properly (air flow from basement). 1.The temperature control system is not working properly 2. No feed back to MAPD voltage. 3. Long term stability of MAPD gains was not monitored. 4.Raise time of PSD trigger signal was slow – problem with the time-amplitude walk and signal delay in trigger box. 5. Electronics noise was rather small but comparable with MIPs signal. Muon calibration was rather challenging. Necessity of PSD upgrade. E beam =30AGeV Energy in PSD Temperature MAPD gain ~4 %/ 0 C PSD was constructed with the minimum functionality that lead to some problems with PSD have been found during Be-runs: 3

The PSD trigger signal in ns 300 ns MAPD signal M~5x10 4 integrated signal M~10 7 ADC signal Be runs: the PSD trigger signal comes after integrators with rise time ~60 ns: rather slow and large time- amplitude walk. Needs careful adjustment for each beam energy. In :…. trigger signal after MAPD – fast signal, no problem with time walk and delay. 4

Strategy of the PSD upgrade 1. New cooling system with temperature control system. 2. New HV control (readout of real voltages). 3. Monitoring system for the MAPD gains (LED stabilized source). 4. New fast amplifiers for the PSD signals and trigger. 5. Compatibility with new DRS4 readout system. 5. Compatibility with existing readout (old mother boards). 5 Summer 2013 All PSD electronics has been dismounted June 2014 The PSD after upgrade

New FEE for PSD 10 Analog signals +trigger (adder) MAPDs Al-plate+Armaflex LED source HV channels SC connector All 10 MAPDs at Al-plate for cooling. 10 fast amplifiers and HV power sources individually for each photodiode. Two (high/low gain) outputs in each amplifier. Fast analog adder in each module for PSD trigger. Stabilized LED source for MAPD gain monitoring. 6

PELTIER COOLER New scheme of MAPDs cooling and temperature stabilization with Peltier element. Heat sink Temperature sensor Copper heat sink Al plate External TEC controller PSD module electronics Compressed air T s -sink temperature sensor T o -object temperature seensor ToTo TsTs 7

Fully assembled cooling system, FEE, HV and control system for one module. TEC-controller Air-inlet Sink Peltier FEE+MAPD Copper rod In total we have (spares) sets of electronics. 8

Controller for slow control system Originally developed for COMPASS ECAL Can control up to 127 devices (modules). Control the MAPD HV settings. Control the gain monitoring system (stabilized LED sources). Connection with external computer: USB-2.0 or RS-232. Controller for SC New HV distribution system Extremely low power consumption. HV stability – 0.01%. One external power supply ~12 V. Permanent check of HV values. There is feedback to HV! Already tested for a few years! Developer - HVSys Co., Dubna. 9

PSD readout PC HVSys... HVSys flat cable TEC RS485 network (twisted pair) HV & LED control box USB to RS485 Converter LAN USB PSD slow control for temperature, gain, and MAPD HV. HVSys, Dubna USB to RS485 Converter 2 RS485 networks X 22 channels each 10

Cooling system long term (a few days) tests. New MAPDs cooling system based on the Peltier elements provides stable (within C) temperature in each module. Ambient temperature Module temperature (MAPD Al-plate)

FEE - noise source: TEC-controller for Peltier elements. TEC OFF TEC ON one event TEC OFFTEC ON one event effect on pedestal effect on MIP-like signal 12 noise with constant period Time bins

Noise effect at pedestal and MIP-like signal. 13 pedestal TEC OFF Time bins pedestal TEC ON Time bins 100 “ticks” pedestal calculation signal calculation Time bins Due to the periodic structure of noise the effect is minimal, because the noise is the same in pedestal and signal regions. MIP-like

MAPDs gain monitoring system. Light amplitude is controlled by PIN- diode inside with very low temperature dependence. Control of MAPD gain at ~1% level. Based on stabilized LED source. LED amplitude vs time LED amplitude distribution (~30 hours). ~1% Small module 14

Now fast trigger signal is avaialble. 15 Signal shape after adder. Rise time ~10 ns No time walk! No extra delay of trigger signals! Present scheme: MAPD Fast Amp. G=30 Adder

Calibration with cosmic muons. Trigger – sum of adder signals from all modules. At least one section in PSD module must be fired. The spectrum contains the pedestals mainly. Small moduleLarge module ADC [ch] Dedicated event selection is needed! 16

Matching with readout electronics (present and future variants). 17 Shape and amplitude of MAPD signal after amplifier are PMT like ones. Easy to adapt to any readout scheme. Two amplifiers increase the dynamical range of detected energies. (especially important for heavy ion program) Present variant : MAPD Fast Amp. G=30 Signal adapter Slow amp.- integrator CB Future (DRS4) variant : MAPD Fast Amp. G=30 DRS Fast Amp. G=120 DRS (for high energy deposition) (for low energy deposition + muon calibration) 17

Future DRS readout 18 Number of DRS channels: 440 MAPDs in PSD. 440x2 (high/low gain) amplified signals are available. 440x2=880 DRS readout channels for individual MAPD readout. For the pile-up identification the adder signal must be in the time window 8  s. A 6 groups of 8 modules might be digitized in this window. ~ 6 DRS channels with extended time window are required. Cables, connectors, patch-panel?

PSD and flow measurements. Can it be used for the reaction plane reconstruction? 19

First estimation on reaction plane resolution measured with the PSD at NA61 Simulations have been done for - Ar+Sc at 7 energies 12, 18, 29, 39, 75 and 149 AGeV AGeV - and 35 AGeV for NA61 and compared with CBM geometries Reaction plane angle calculations were done in 5 centrality bins: b: 0-2, 2-4, 4-6, 6-8, >8 Corrections of reaction plane angles due to magnetic field and flattering procedure were applied events for were generated with Shield code and transported (all particles) from the target to PSD via Geant4. 20

Au35Au, NA61, 8cm, 17m Au35Au, CBM, cbmroot, hole6cm, 6.5cm, 15m AGeV 18, 29, 39, 75 and 149 AGeV - reaction plane resolution vs b - 80 – 100 degrees. Reaction plane resolution for different systems. 21

Reaction plane resolution at CBM (FAIR) 22 PSD Au-beam energy 2-30 GeV. Magnet field. Reaction plane resolution is consistent with NA61 MC numbers.

Conclusions: 1)New FEE for PSD is installed and tested. 2) The PSD slow control and temperature control systems have been tested. PSD is ready for muon calibration at beam in October ) First simulation of reaction plane determination by the PSD was done. 23 To do PSD slow control is to be implemented in NA61 DCS. Readout by SC of the temperature in PSD modules creates picked-up noise in MAPD amplifiers during readout (a few seconds). Would be nice to synchronize this readout with the spill structure. MAPD gain monitoring system is working in stand-alone mode when PSD is triggered by LED signals. Is it possible to incorporate this trigger to common DAQ?

Thank You 24