MFP – Installation using a Jack up Rig

Slides:



Advertisements
Similar presentations
ALFREDO LOBO National Institute of Metrology and Quality-Inmetro Director of Quality TBT WORKSHOP ON SUPPLIERS DECLARATION OF CONFORMITY THE BRAZILIAN.
Advertisements

TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Edit this text for your title
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
OSHA Office of Training and Education1 Excavations – Subpart P.
Policy formulation and evaluation Combining society, economy and environment - A Green Economy Perspective Dr. Andrea M. Bassi Deputy Director, Millennium.
Training in GSP New approach Who is GSP? Established in member of UPETROM Group HQ located in Constanta Port, Berth 34 Activity: offshore drilling,
Fiber Mast Antenna System for VHF/UHF Ground Antenna.
ISO Wellhead Integrity
VM SAVE International providing value ….. to the world VM Briefing SAVE International introduces “ Value Methodology ” Presentation version 1.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine operations Kværner ASA, UiO, Oct
QUALITY ENERGY SERVICES Liftboat & Marine Services Your Well Productivity is Our Priority Global Lift 2.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
HSSE Contractor & Supplier Management January 2014 HSSE Department KPNWE Use of CAOL and TSR.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
© 2011 BAKER HUGHES INCORPORATED. ALL RIGHTS RESERVED. TERMS AND CONDITIONS OF USE: BY ACCEPTING THIS DOCUMENT, THE RECIPIENT AGREES THAT THE DOCUMENT.
Marine Coordinating - more efficient and cost saving operations.
1 ACG Pipelay Barge “Israfil Guseynov” Fatal Accident Summary 24 th April 2005.
NaREC Andrew Mill CEO Ocean Energy For New England Conference 6 th October 2008 Sate of the Ocean Power Industry An Industry Perspective.
Transportation leadership you can trust. presented to NCHRP Project Panel presented by Cambridge Systematics, Inc. with PB Consult Inc. Texas Transportation.
Health, Safety and Environmental R&D Don Smith International Association of Oil and Gas Producers.
SS28: Cooperative Systems II: Bits, Bytes, and Brakes Mike Schagrin US Department of Transportation ITS Joint Program Office International Harmonization.
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
SELECTING THE BEST FOR SUPPLYING FROM WEST. Who we are TRANS ARK GROUP Trans Ark Procurement Design Service Training Offshore Expert Bureau Consulting.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
Research Methods and Techniques Lecture 1 Introduction & Paper Review 1 © 2004, J S Sventek, University of Glasgow.
Risk in Well Plugging & Abandonment by Twachtman Snyder & Byrd, Inc
CAISSON FOUNDATION.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, UiO,
International Certification Services Pvt Ltd.
INSTALLATION OF TOPSIDE USING FLOATOVER METHOD
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
Common Engineering Documents Inspection or trip reports Research, laboratory, and field reports Specifications Proposals Progress reports Instructions.
Classification: Internal Status: Draft Design of offshore structures in a field development perspective ”From nothing to nothing with solid profit” $$
09 July EHN1 civil engineering project status (JUNE) Summary: Updating of the activities carried out on-site (Done) in JUNE List activities on going.
PHASE 7 FACILITIES ENGINEERING
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
Contractor Alternate Design Serving the Public’s Best Interest.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
GUPCO Kamose Fatality Incident Toolbox Talk Lessons pack Presenter’s Name Title Department Prepared By Dave Goodwill for Dave Blevins.
Independent, integrated thinking.
WELCOM TO EGIQC. EGIQC Engineering Group For Inspection & Quality Control.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, Fall.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
Lifting Gear TDI-Brooks Policies & Procedures Nov 2015.
A review after 5 years. Cease dependence on inspection to achieve quality... by building it into the product in the first instance.
KSP Industrial Group Ltd. Engineering & Manufacturing WHCP, Dosing Pump, CIP & LBV, PLC & Gearbox
Introduction to Well Completions
Kuwait Oil Company Commercial Support Group Supplier Relationship Management Team PRE-QUALIFICATION OF CONTRACTORS AND MANUFACTURERS 2016.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
Energy Trust’s Emerging Technology Crystal Ball March 2, 2016.
Overview of ASME P Planning for Load Handling Activities
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Case Studies Powerpoint The ideas, concepts and processes expressed throughout this document are confidential. They are presented exclusively for the benefit.
What’s the future of decommissioning globally?
IMPROVED SEABED ANCHORING TECHNOLOGY Innovation Opportunity Identified at PROTTEC Retreat 26/28 October 2010 Jonathan Williams, Marine South East.
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
OFFSHORE CONSTRUCTION
PRESENTATION BY TRILLIAN PROPOSED EXECUTION PLAN FOR ESKOM’S POWER PLANT IN SOUTH AFRICA DATE:
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Experiences with and requirements to jack-ups in Norway
Establishment of a regulatory review and assessment process
NAME 217: Theoretical Ship Design
‘ Causes of Delay During Construction Phase at Palestine ’
CICA Lift of the Year ≤20 tonne load Entry Template
Presentation transcript:

MFP – Installation using a Jack up Rig Dr. Sanjaya Pillai, Business Head, GLND India, Aswathy Ezhampakkel, Sr. Naval Architect, GLND Qatar

History October 2006: NDC started operations in Mumbai by opening a project office to execute 4WPP & BCPB2 projects 1st April 2008: Noble Denton India Pvt Ltd established January 2009: ISO 9001 certification awarded to Noble Denton India Pvt Ltd April 2009 GL acquired Noble Denton April 2008-May 2012: NDI executed many warranty projects.

GL Group Business Streams GL NOBLE DENTON (OIL and GAS) Advanced Engineering and Consulting Marine Operations and Consulting Technical Assurance Design and Execution GL MARINE (CLASS) Classification Society GL GARRAD HASSAN (RENEWABLES) Renewables

MFPs -Definition BACKGROUND 1. Production wells on the verge of depletion, Additional wells can be drilled in the near vicinity if some marginal fields are available near the existing facilities. Existing no. of Production wells is not sufficient to take care of increased flow. Additional wells needed for tapping the resources. Marginal fields exploitation, Minimum facilities for feasibility considering other factors like cost, grouping of fields etc. Concept of Minimum Facilities Platforms

MFP - Installation INSTALLATION PERSPECTIVES Risk during Load-Out, Transportation and Installation Reconsideration of Design Parameters Safety during Installation Size and Weight of the Structure Involved Installation Methodology - innovative Identify Marine Procedures Reasonable risk from Owners/Underwriter’s points of view

Installation – A Case Study INSTALLATION of MFP – A Case Study Operator – Middle East Feasibility Study for Installation with a Rig Additional wells needed for accommodating increased oil flow => adjacent additional platform with Minimum Facilities proposed Input from various contractors taken during feasibility study Feasibility Study confirmed after thorough evaluation of feasibility of Installation GLND developed Installation Procedures and Marine Procedures

Installation – A Case Study INSTALLATION of MFP – A Case Study - Design considerations Deciding parameters Rig Capacity of Lift Rig Reach of Lift Safety of Existing Platform Installation Methods Risk Assessment and Mitigation

Installation – A Case Study INSTALLATION of MFP – A Case Study - Steps Position the Rig near to the existing platform Cantilever extended, Install Pin pile Template loaded, sea-fastened and arrives at the location Template Lift with Rig, Lowered and Placed on the Bottom Install Legs(Conductors)/ Work Platforms Topside Lift after Rigging inspection Final adjustment using tugger winches Positioning Levelling and welding the Topside on the legs

MFP – Installation Perspectives Step #1, #2 Position the Rig near to the existing platform, Cantilever extended, Install Pin pile Outreach -45’ Port/Sbd- 14.5’

MFP – Installation Perspectives Step #3 Template loaded, sea-fastened and arrives at the location No welding to the deck (timber)

MFP – Installation Perspectives Step #4 Template Lift with Rig, Lowered and Placed on the Bottom Mooring: Bow -1 Stern - 2

MFP – Installation Perspectives Step #5 Install all other Legs/ Work Platforms Cutting at the desired elevation

MFP – Installation Perspectives Step #6 Topside Lift after Rigging inspection Crash rail Air gap

MFP – Installation Perspectives Step #7 Final adjustment using tugger winches Positioning is a delicate job

MFP – Installation Perspectives Step #8 Positioning, Levelling and welding the Topside on the legs

Installation – A Case Study INSTALLATION of MFP – A Case Study - Issues Rig Limitations – DAF to be considered Weather during Installation – very important Positioning of the Rig – rig move and soil assessment Placing of the Topside simultaneously on conductors/legs Tugger Line and Lifting Gear – to be designed Leveling of the Platform – suit to site

Installation – A Case Study SUMMARY Design Parameters - Reconsideration Risk Assessment and Risk Mitigation Installation Methodology – Innovation Custom made procedures/design

Thank you for your attention! For further information visit www.gl-nobledenton.com Thank you for your attention!