ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.

Slides:



Advertisements
Similar presentations
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Advertisements

PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
East Hampton High School July 2013 – July 2014 Design Phases.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
CSI Certification Presented to the Louisville Chapter of CSI November 13, 2014 Edmund L Brown, CSI, CCCA, Assoc. AIA Project Architect, Sebree Architects.
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
ES305: Virtual Tools in Engineering Design: The Eng. Design Process James Carroll, Associate Professor Electrical and Computer Engineering.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Construction Contract Documents
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Information Integration in Construction. Construction information In construction, architects, engineers, planners, contractors, facility managers....
1 CAPACITY BUILDING AND TRAINING ON PROCUREMENT Session 9 – The World Bank Procedures for IT Procurement September 21, 2005 by Arif Hassan.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Capital Project Process
TECHNOLGICAL DESIGN Architectura l Design Process.
Tom MAZOUR IAEA, Division of Nuclear Power
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
Construction Management Copyright © Texas Education Agency, All rights reserved. 1.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Formats ACT 380.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
CENE 386 Engineering Design: The Methods. Getting Ready to Get the Job Getting as much information as possible prior to making the proposal –Profile the.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Preliminary Project Descriptions/Outline Specifications
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Construction of a Transfer Station
What are they? How can I do them too? Construction + Materials IV: Construction Documents.
CS223: Software Engineering Lecture 13: Software Architecture.
BCM 210-L1 IMPACTS OF MATERIALS AND METHODS. DEFINE THE FOLLOWING MATERIALS METHODS ASSEMBLIES.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Value 4 Golf is formed by a group of professionals who have been all their life linked to the world of golf, and actively participating.
BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Estimating and Scheduling CEE 492
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
The Design Team Carl James.
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
Construction Documents
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pre-Contract Cost Control
Introduction DEFINATION :-
Controlling Project Cost and Schedule
TCU-PROJECT: 7TH Semester Course
FIVE PROJECT PHASES.
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
Moshe Farjoun (1998) Strategic Management Journal
Presentation transcript:

ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction principals.

Direct Project Objectives (Eyes of Client in most cases) Time (Schedule) Money Performance Scope (What are we providing?) Value (Short term and long term) Client Satisfaction (Designer & Contractor) Can you have all of the above but still have an unsatisfied client?

Designer’s Role Designer’s responsibility to provide value regarding: Client Expectations (Aesthetics) Form, Fit, Function Performance Efficiency Sustainable (In recent years an academic and public discourse has led to the use of the word sustainability in reference to how long human ecological systems can be expected to be usefully productive.)

Programming Information Function People Activities Relationships Form Site Environment Performance Level Economy Initial Budget Operating Costs Life Cycle Costs Time Past Present Future Construction Specifications Institute (CSI) Program Information Index

The stage by stage progression following the life cycle of a facility in divided into the stages shown: 1. Project Conception 2. Project Delivery 3. Design 4. Construction Documents 5. Bidding/Negotiating/Procurement 6. Construction 7. Startup & Commissioning (Added by Professor Cherf) 8. Facility Management As shown in the “Project Resources Manual of the Construction Specifications Institute (CSI)”

Project Lifecycle 1. Project Conception/ Program Development Project Identification Feasibility Studies Facility Investigation and Development Site Selection Project Planning 2. Project Delivery is the process by which all of the procedures and components of designing and building a project are organized and put together in an agreement that results in a completed project.

3. Design Schematic Design (SD)/Project Definition Design Development (DD)/Detail Engineering The American Institute of Architects (AIA) defines design as occurring in three distinct phases: schematic design, design development and construction documents. 4. Construction Documents This is based on the owner-approved design development documents and any final adjustments to the project or project budget. This will be the documents used to build the project. These will include: Construction Agreements (contracts) Project Manual Project Specifications Drawings

5. Bidding/ Negotiating/ Procurement – (Procure means to buy or obtain.) It is the process or activities required to obtain labor, equipment and materials by a vendor/subcontractor selection process through delivery of all materials and services to the jobsite. 6. Construction A Program A Project Management Resources Materials Methods Sequencing

7. Startup & Commissioning A thorough understanding of all start up and commissioning requirements by the owner will allow for a better turnover of the project. Identifying and working closely with the owner, a start-up and commissioning plan, will reduce problems encountered at the end of the project to assure the facility is placed properly in service. This includes operations and maintenance procedures. This is the key to proper facility management at the beginning of the occupancy.

Project Life Cycle for Building Materials Raw Materials Manufacture, packaging and distribution The construction process Building use Reuse, recycling or disposal

Performance Specifications Form, Fit and Function Design, Build and it better function.

Design Responsibility MATERIAL SYSTEM ****************************************************** METHOD SEQUENCE

The Role of the Architect “The Architect is not expected to practice engineering, to design in detail the structure of buildings he or she designs. Architects rely on structural engineers and other consultants for the specific design of all load bearing components of buildings. But the architect must know the fundamentals, be able to guide and understand the engineer’s work, and contribute directly to the decision making which determines the look, quality, and cost of a structural system.”

Materials and Methods of Construction “Beyond structural systems architects must know the implications of using the primary structural materials: wood, steel and concrete. Each material has unique characteristics, both structurally and aesthetically, and the architect must choose materials and systems thoughtfully and knowledgeably. Strength, durability, workability, weight, resistance to heat and weather, and cost are among the properties considered.” Architect? A Candid Guide to the Profession Roger K. Lewis

Materials and Methods of Construction “The designer is concerned with the control of moisture, heat loss and gain, dimensional stability, durability, availability of labor and materials, cost and last but not least, appearance. The architect must show in design drawings how pieces fit together, how joints and connections are made, and what the dimension of all assembled components will be. Typical details depict roof, wall, and floor assemblies, window and door assemblies, railings, stairs, cabinetry and decorative finishing elements.’ Lewis

The Need for Integrated Design “To improve overall performance, the team needs to optimize the functioning of the whole building as a system. Integrated design means capturing the benefits of multiple systems designed to work effectively together rather than separately.” The HOK Guidebook to Sustainable Design

MasterFormat Material Selection Building Design Industry Standards Codes Barrier-Free Design Sustainable Building Design