EVM-2 Notice of Partnership Questions and Answers January 23, 2015.

Slides:



Advertisements
Similar presentations
GN/MAE155B1 Orbital Mechanics Overview 2 MAE 155B G. Nacouzi.
Advertisements

More Satellite Orbits Introduction to Space Systems and Spacecraft Design Space Systems Design.
CHRIS (Compact High Resolution Imaging Spectrometer) sira group sira electro-optics Dr Mike Cutter EO & Technology Business Manager.
WorldView-1 By Michael Jones. Abstract  The WorldView-1 satellite is one part of what is to be a three satellite constellation. The group includes QuickBird,
Geospace Electrodynamic Connections (GEC) Mission The GEC mission has been in the formulation phase as part of NASA’s Solar Terrestrial Probe program for.
Return to Flight Status of Launch Window Changes Manager, Space Shuttle Systems Integration (Operations) – John Shannon Chief, Ascent/Descent Dynamics.
Resolution.
1 Air Launch System Project Proposal February 11, 2008 Dan Poniatowski (Team Lead) Matt Campbell Dan Cipera Pierre Dumas Boris Kaganovich Jason LaDoucer.
1 Winter Launch Block Modeling and Results MMS Flight Dynamics Team MIWG 8 Feb. 20, 2014.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
Orbits and Sensors Multispectral Sensors
Line scanners Chapter 6. Frame capture systems collect an image of a scene of one instant in time The scanner records a narrow swath perpendicular to.
Satellite orbits.
Frank Stocklin Ron Vento Leslie Ambrose June 28,2001 SUPERNOVA/ACCELERATION PROBE (SNAP) Data Systems.
Remote sensing in meteorology
Satellite Orbits Satellite Meteorology/Climatology Professor Menglin Jin.
Spacecraft Design and Sizing Dr Andrew Ketsdever MAE 5595 Lesson 14.
History and Features of Landsat 7 By: Andy Vogelsberg Photo of Landsat 7 taken from tures/litho/landsat/land.jpg.
Teamo Supremo Critical Design Review Ahna Issak Wes Roos Kristen Brenner Kimberley Fornall Barton Tofany Nick Martinez Ahna Issak Wes Roos Kristen Brenner.
Autonomous Landing Hazard Avoidance Technology (ALHAT) Page 1 March 2008 Go for Lunar Landing Real-Time Imaging Technology for the Return to the Moon Dr.
Remote Sensing of Mesoscale Vortices in Hurricane Eyewalls Presented by: Chris Castellano Brian Cerruti Stephen Garbarino.
Satellite Orbits 인공위성 궤도
Hyperspectral Satellite Imaging Planning a Mission Victor Gardner University of Maryland 2007 AIAA Region 1 Mid-Atlantic Student Conference National Institute.
Spaceborne Weather Radar
ATS-III: Making the Images Available Jean Phillips Schwerdtfeger Library, Space Science and Engineering Center University of Wisconsin-Madison ASLI Conference,
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Technical Forestry GPS and GIS Systems Shawn Linder 7/29/02.
Metr 415/715 Monday May Today’s Agenda 1.Basics of LIDAR - Ground based LIDAR (pointing up) - Air borne LIDAR (pointing down) - Space borne LIDAR.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
BRITE-Constellation consists of six nano-satellites: UniBRITE and BRITE-AUSTRIA (TUGSAT-1) are funded by Austria, two more by.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
9/17/2015 GEM Lecture 20 Content Flight preparation –Equipment –Weather conditions –Flying height –Coverage.
BRITE-Constellation currently consists of two satellites, UniBRITE and BRITE-AUSTRIA (TUGSAT-1) and two satellites to be funded by the Canadian Space Agency.
Different Coverage Patterns for a Single Satellite and Constellation of Satellites in Real Time with the STK Pedro A. Capó-Lugo Graduate Student Dr. Peter.
Resolution Resolution. Landsat ETM+ image Learning Objectives Be able to name and define the four types of data resolution. Be able to calculate the.
1 Global Tropospheric Winds Sounder (GTWS) Reference Designs Ken Miller, Mitretek Systems January 24, Jan-02.
1 An Observatory for Ocean, Climate and Environment SAC-D/Aquarius HSC - Radiometric Calibration H Raimondo M Marenchino 7th SAC-D Aquarius Science Meeting.
A SATELLITE CONSTELLATION TO OBSERVE THE SPECTRAL RADIANCE SHELL OF EARTH Stanley Q. Kidder and Thomas H. Vonder Haar Cooperative Institute for Research.
Remote Sensing Data Acquisition. 1. Major Remote Sensing Systems.
Spaceborne 3D Imaging Lidar John J. Degnan Geoscience Technology Office, Code Code 900 Instrument and Mission Initiative Review March 13, 2002.
Satellite Support For Climate Change Studies 1 Satellite Support for Climate Change Studies Badri Younes, NASA Deputy Associate Administrator for Space.
-1 - Outline 1.Science goals, mission name (bonus for acronym and logo!!) 2.Define telescope and instrument 3.Choose orbit 4.Calculate data volume, rate.
Exploring Space CHAPTER the BIG idea People develop and use technology to explore and study space. Some space objects are visible to the human eye. Telescopes.
From you host … Dr. H. Introduction Communications design requires us to think about the following issues: Communications design requires us to think.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
LuNet Integrated Network Architecture for Sustained Human and Robotic Exploration Gary Noreen Telecommunications Architect Communications Architecture.
March 2004 At A Glance Advanced Mission Design (AMD) researches and develops innovative trajectories and the mathematical methods used for optimal designs.
Orbital Analysis for Inter-Calibration Dave Mac Donnell Brooke Anderson Bruce Wielicki Don Garber NASA Langley Research Center Solar Workshop January 30,
SATELLITE ORBITS The monitoring capabilities of the sensor are, to a large extent, governed by the parameters of the satellite orbit. Different types of.
The Search for Another Earth Exoplanets and the Kepler Spacecraft.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Kick off Questions 1. Discuss at your table and be ready to defend your answer --which is larger the Solar System or an Oort Cloud? Then on a piece of.
BOWSER 1 COSGC Space Research Symposium 2010 BOWSER Balloon Observatory for Wavelength and Spectral Emission Readings.
Orbits and Sensors Multispectral Sensors. Satellite Orbits Orbital parameters can be tuned to produce particular, useful orbits Geostationary Sun synchronous.
Presented by Beth Caissie
Environmental and Disaster Monitoring Small Satellite Constellation
RENISH THOMAS (GPM) Global-Precipitation- Mapper
Maxim Pathfinder Prework 16 August 1999
Satellite Meteorology
VIRTIS Operations at Lutetia
AIRS (Atmospheric Infrared Sounder) Instrument Characteristics
Measurements of the Moon by CLARREO Pathfinder and ARCSTONE
Flight Dynamics Michael Mesarch Frank Vaughn Marco Concha 08/19/99
Warm-up Which planet has the fastest revolution around the sun?
USGS Agency Status Landsat Operations Jenn Lacey 21 July 2016
BASIC ORBIT MECHANICS.
Worldview II Launched October 8, 2009 Altitude: 770 km
Classroom Rocket Scientist
Remote sensing in meteorology
Presentation transcript:

EVM-2 Notice of Partnership Questions and Answers January 23, 2015

Q1 The NPO states "The imager(s) on each spacecraft shall create images covering a ground swath of +/- 576 km from nadir align the orbit track by +/-100 km across the orbit track from nadir". At 825 km orbit with 30m per pixel resolution at 8 bits per pixel, each image would be 1.8 Gbits = 216 Mbytes. This would produce approximately 43 Gbytes per orbit. It is not possible to downlink this much data. Is the requirement really 30 km per pixel? Or is the footprint of each image not as big? Or a combination thereof.

A1 The pertinent GRC EVM-2 mission requirements from the Notice of Partnering Opportunity are as follows: The GRC EVM-2 mission shall consist of four spacecraft flying in formation in a Sun Synchronous low Earth orbit at approximately 825 km. altitude. Each spacecraft shall carry monochromatic imagers resolving the red light component of the visible spectrum ( nm) at eight bit per pixel resolution. The images shall have a ground resolution of 30 meters/pixel. The imager(s) on each spacecraft shall create images covering a ground swath of +/- 576 km from nadir along the orbit track, and by +/-100 km across the orbit track measured from a line that is canted 15 degrees to the east from nadir. Imaging shall be done only when the spacecraft are in sunlight. Potential partners may also consider the following: An image is required to be taken every 20 seconds The orbit parameters are: – Altitude = 824 km – Inclination = 98.7º – Period = 101 minutes – Local Time of Ascending Node = 13:30 hours +/- 10 minutes – The constellation of four spacecraft should have image overlap as shown below

A1 continued Potential partners should consider: the amount of on-board data storage the spacecraft would require the type of communications system and communications protocols necessary to return this amount of data to the ground. Ground network coverage requirements

Q2 What role does GRC have in this? A2 The NASA Glenn Research Center (GRC) is managing the Project, providing Systems Engineering and Integration (SE&I), Safety and Mission Assurance (S&MA) oversight, and contract oversight.

Q3 What is the science that GRC is trying to accomplish and what heritage does GRC have in the science area? A3 GRC is working with a team of scientists to determine the updraft velocity of clouds. While GRC does not have specific heritage in this particular science area we have a very strong science team from major universities with strong atmospheric science involvement. This mission aligns with GRC strategic planning to align our flight systems experience to Earth Science missions, and a GRC scientist is supporting the science team.

Q4 The GRC EVM-2 mission shall consist of four spacecraft flying in formation in a Sun Synchronous low Earth orbit at approximately 825 km. altitude. Questions: 1) Is there a required time of ascending node? 2) What is the nature of the formation desired? 3) For example, are all the satellites in the same orbit separated by true anomaly? A4 See A1

Q5 The spacecraft shall be capable of being launched in a ride-share configuration along with a primary spacecraft or by themselves on a single launch vehicle. The spacecraft shall have an operational life on-orbit of at least one year, commencing at the completion of on-orbit commissioning. Each spacecraft shall carry monochromatic imagers resolving the red light component of the visible spectrum ( nm) at eight bit per pixel resolution. Questions: What volume (configuration), mass, and power should SC vendors assume for each imager in preparing responses? A5 The budget constraints imposed by an EV class mission combined with the NOP requirements of launching four spacecraft on a single launch vehicle, or in a ride share configuration with a larger spacecraft will drive the size of the spacecraft, which will, in turn, drive the configuration of the imager(s).

Q6 Do the data have a latency requirement for downlinking? A6 At this time there is no latency requirement, but such a requirement may evolve during proposal writing.

Q7 The images shall have a ground resolution of 30 meters/pixel. The imager(s) on each spacecraft shall create images covering a ground swath of +/- 576 km from nadir along the orbit track by +/-100 km across the orbit track from nadir. What is the SC pointing control and jitter requirement? The imager(s) on each spacecraft shall have a cant angle of 15 degree measure eastward from nadir. Questions: Is 30m resolution required at nadir or the furthest extent of the swath? A7 The 30m resolution pertains to each pixel in the image, irrespective of it being at nadir or at the periphery of the image. We do require ideally 30 m resolution at all ranges. But practically we can have 30 m resolution at the longest ranges, and respectively higher resolution at the shorter ranges. With the current swath area, there would be a bow tie effect, which will widen the nominal 200 km at the furthest range to much more than at the shortest range. We can accommodate this if the nominal width is 200 km at the furthest range. Ideally, we can have a camera with better pixel resolution and field of view, that will collate adjacent pixels at the shorter range to keep the nominal resolution nearly constant. Options and issues regarding this requirement should be discussed in the response to the NOP.

Q8 Is there a jitter requirement? A8 Not at this time, but one will evolve during proposal preparation based on the spacecraft systems.

Q9 Are there pointing or knowledge requirements? A9 Not at this time, but one will evolve during proposal preparation based on the spacecraft systems.

Q10 Can you explain how to interpret the requirement to image +/- 100 km across the orbit track along with the requirement for the imager(s) to be canted 15 degrees eastward of nadir? A10

Q11 Must the entire swath be imaged at all times or is a scanning mechanism acceptable? A11 See the Answer to Q19

Q12 Please confirm the due date for the responses to this notice is Feb, 3, A12 Confirmed.

Q13 Is the cost cap for Earth Venture Mission-2 the same as before (i.e., $150M) and does the cap include spacecraft, instrument, launch and all science team support? A13 The Earth Venture Mission-2 Announcement of Opportunity has not been posted.

Q14 In section 2 – Overview it is stated: Based on the responses to this Notice, GRC anticipates selecting one or multiple instrument suppliers and a single spacecraft vendor with which GRC would then immediately work directly with in development of the GRC EVM-2 mission. o Can the instrument supplier and the spacecraft be one and the same? o Are you looking for instrument designs as well as spacecraft designs? A14 Yes.

Q15 In the EARTH VENTURE SPACECRAFT section it is stated: The GRC EVM-2 mission shall consist of four spacecraft flying in formation in a Sun Synchronous low Earth orbit. Can you provide more details of the formation, e.g.: Will the spacecraft be required to maintain a given position with respect to each other that might require fuel to maintain that position? A15 The spacecraft should be maintained 80 seconds apart in the orbital arc.

Q16 Will the spacecraft be dispersed around the same sun synchronous orbit with the same crossing time? A16 The LTAN (Local Time of Ascending Node) crossing time should be assumed to be at the center of the constellation.

Q17 How accurately does that crossing time have to be maintained? A17 See the answer to Q1.

Q18 There are very few details provided of the imagers that the spacecraft will have to carry. Is it your intention that the responders will provide estimates of the size, weight and power of imagers that can meet the performance requirements stated and hence deduce the size of spacecraft required to accommodate them? A18 Yes

Q19 In the EARTH VENTURE SPACECRAFT section it is stated: The imager(s) on each spacecraft shall create images covering a ground swath of +/- 576 km from nadir along the orbit track by +/-100 km across the orbit track from nadir. Does this requirement imply that the 200 km x 1152 km image is captured simultaneously or can the along track +/-576 km image be built up using the motion of the spacecraft like a conventional pushbroom imager? A19 A pushbroom imager could be acceptable only if the entire swath area (in- track and cross-track) could be scanned in 2 seconds. While longer scan times of up to 10 seconds might be acceptable, the in-track swath dimension would have to be increased to compensate for the spacecraft movement during that time. The precise amount would have to be calculated. This could be assessed during proposal development.

Q20 To size the onboard data recorder we need to know the CONOPS such as how many such images are collected before the opportunity to downlink the data and where the downlink stations are assumed to be. Will this information be provided? A20 Downlink should be assumed to NASA communications assets in the Near Earth Network or the Space Network.

Q21 In the EARTH VENTURE SPACECRAFT section it is stated: The imager(s) on each spacecraft shall have a cant angle of 15 degree measure eastward from nadir. Does this requirement mean that the +/-100 km swath across the orbit track is across the orbit track that is 15 degrees off nadir? A21 The cross track swath is +/- 100 km measure from a center line that is canted eastward from nadir by 15 degrees. See the figure associated with the answer to Q10.