Warm Up Notes What is an Assignment? What’s the objective? When is it due? How much effort? What criteria? E-mail protocol Subject: CVEN 349 - ??? ???

Slides:



Advertisements
Similar presentations
Costs and Benefits.
Advertisements

Project Control: Developing the As-Planned S-Curves
Behaviour and Design of Steel Structures Lecture 3 Conceptual design.
Transport.tamu.edu OSU Parking Privatization Overview Texas A&M University Transportation Services.
Financial Ratios 1.Levels of information 2.The power of ratios 3.A context for using ratios 4.Different perspectives 5.Published v. Management Accounts.
Experiential Learning Cycle
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
KINGWOOD UDGET PRESENTATION TOWNSHIP OF KINGWOOD 2012 BUDGET PRESENTATION.
3/21/2003CVEN349-Maxwell1 Equipment Costs Part 6.3 Follows Halpin Chapter 9 November 6, 2002.
Three Approaches to Value There are three general approaches that we use to value any asset. –Discounted Cash Flow Valuation –Relative Valuation –Contingent.
Reading: ABC for Higher Education Institutions Group II Aftab Usmani Alexander Derevin Carla Daniels Shantanu Kumar Singh.
ICS 324 Database Systems Second Semester (072) Information & Computer Science Department.
General information CSE 230 : Introduction to Software Engineering
Reliability Chapter 4S.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Document 51 1 Lansdowne Partnership Plan Business Model Document 5.
Cost-Benefit Analysis I PAI 723 Economics for Public Decisions 11/19/
Information Technology Project Management, (chapter#2) Methods of IT Project Management, (chapter#2)
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
Introduction Lecturer: Professor Stephen T. Thornton.
Introduction to Statistics for the Social Sciences SBS200, COMM200, GEOG200, PA200, POL200, or SOC200 Lecture Section 001, Fall, 2014 Room 120 Integrated.
Project Comparison and Evaluation Techniques Module 02-1: Project Comparison Modified: August 23, 2015.
TRANSPORTATION PLANNING. TOPICS 1.ROADS AND PUBLIC GOODS 2.RATIONALE TO JUSTIFY ROAD BUILDING 3.URBAN PLANNING AND TRAFFIC CONGESTION (UNINTENDED CONSEQUENCES)
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
Survey Implementation Learning Objectives  Create a survey in Microsoft Publisher  Analyze survey data  Make charts based on data in Excel or PowerPoint.
3/11/2003CVEN Maxwell1 Types of Contracts, Ownership, etc. Module Follows Halpin Chapter 5 Updated: March 11, 2003.
1 The George Washington University School of Engineering & Applied Science Department of Electrical & Computer Engineering Engineering Economic Analysis.
Warm-Up Rules of Engagement Office hours are in the afternoons, unless you have made other arrangements. If the door is open, I’m in the area come look.
INDIANA DEPARTMENT OF HOMELAND SECURITY Joe Wainscott, Executive Director IDHS: Leadership for a Safe and Secure Indiana.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
Setting Your Fees Project Cost and Setting Your Fees.
Financial Project Metrics in Feasibility Study
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
PHY 1405 Conceptual Physics (CP 1) Spring 2010 Cypress Campus.
Project Cashflow Part 7.3 February 18, RAT # Take out a sheet of paper, write your name … … What is the annual St-Line depreciation amount.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Business management is frequently faced with making decisions about price. How will I set prices? What should pricing accomplish? What about “loss-leaders”?
CORNERSTONES of Managerial Accounting, 5e © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
COURSE INTRODUCTION BUSINESS ENGLISH 2. Lecturer: BOGLARKA KISS KULENOVIĆ Office hours: Tuesday: 10:00 – 12:00 1 more hour to be set for meetings Room:
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
In the name of Allah the Most Gracious the Most Merciful.
AP World History Review Project
The Project Development Process: Setting the Context for Project Control Part #1 November 28, 2015.
CGMB324: MULTIMEDIA SYSTEM DESIGN
Contractor Alternate Design Serving the Public’s Best Interest.
3/19/2003CVEN Maxwell1 Forms of Organization Presentation: March 19, 2003.
Chapter 13 Estimates for Remodeling Work
ACCOUNTING FOR CAPITAL PROJECTS Financial Policies and Procedures for the Capital Project Delivery Process Office of the CFO.
FY08 PARKING PERMIT FEE PROPOSAL November 20, 2006.
Project Control: Work and Cost Versus Schedule Module: April 22, 2003.
Car Smashing Fundraiser Ryan Kuhn December 21 st, 2015.
CSE Senior Design II Day 1: Getting Organized Spring 2012 Instructor: Mike O’Dell.
Train Station Project Update Report from Ad Hoc Committee December 11, 2007.
(Crash-Course in understanding the Allen Weiss Excel Pro Forma Model) J. Gunderson Dec12.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Project Controls: As-Built S-Curves
(Additional materials)
FIN 375 Competitive Success/tutorialrank.com
FIN 375 Education for Service-- tutorialrank.com.
FIN 375 Education for Service-- tutorialrank.com
Project Estimating Overview
Cornerstones of Managerial Accounting, 6e
Academic Communication Lesson 3
The Project Development Process:
Traditional Steps Leading To A Bid Document
Activity on Node Approach to CPM Scheduling
Business Plan Preparation Introduction
Presentation transcript:

Warm Up Notes What is an Assignment? What’s the objective? When is it due? How much effort? What criteria? protocol Subject: CVEN ??? ??? CyberDude Attachments: DOC, XLS, EXE, VBA, VBS, … … Attachments: PDF (Adobe), txt, csv, mdb … …

Feasibility Studies Module 01.1 Revised: 8/21/2015

Purpose Introduce Students to the concept of “back of the envelope” Plans, Specifications, and Estimates (PS&E) Develop conceptual solutions to selected local problems.

Learning Objectives Students should be able to develop a “back of the envelope” feasibility study for a selected, simple project to include” Gross Work Breakdown Structure Order of Magnitude Quantity Estimates Order of Magnitude Cost Estimates

RAT 02.1: Take out a piece of paper, put your name on it, Take 2-minutes to write: … the three things you should be able to calculate for a “back of the envelope” estimate according to the previous slide. Now hand it to the front of the room in 30 seconds, starting now.

Some Examples of Local Projects Renovation of Ross Street (good starter) PS&E for a new CE Building (good example) Cost and Revenue projection for WERC Parking Garage (good example) Enhanced Parking and Access to the Main Campus (too complex)

Ross Street: Project Development Plan Need – facility for opposing traffic. At least two wide lanes for busses to pass each other. Mix of other traffic – emergency vehicles?, Access to parking lots? Traffic circulation? Local traffic is NOT a consideration.

In Class Exercise What tasks (work break-down structure) are required to complete the job? Write down list as individuals As pairs refine the lists As groups of four refine lists Report results.

As Individuals Estimate the following Construction quantities: Demolition of existing pavement (30-ft by 1,500-ft, for a first SWAG) Repair of utilities (FTE-Years) Sub base (average 4-ft deep) Base course (average 1-ft deep) Pavement with curb and gutter (average ¾ -ft deep)

Estimate the following: Direct Construction Costs (labor & materials): Demolition of existing pavement Repair of utilities Sub base Base course Pavement with curb and gutter Fringe Benefit Costs (15% of Direct) Indirect Costs (150% of Direct) Profit and Contingency (It depends upon risk factors but let’s say 10-25%)

Rough Cost Calculation Example Warning: I asked a slightly more complex problem on the Final Exam and 30% of the class missed it. Since I asked about the same problem on all three exams, not being able to answer it cost some students a letter grade.

Basic Assumptions TAMU Owns the property. There are no significant environmental issues. Construction will occur over the summer; so, traffic will not be a problem. TAMU will pay cash for the work.

Project Development Process: General Steps Needs Assessment (Re)Definition & Scope Identify Stake Holders Supporters and Blockers Conceptual Design Generation of Alternatives Physical Assessment – Research Required? Fiscal Assessment – Timing? Political Assessment – Climate?

… Continued Development of “Pathfinders” or Pilot Studies Based upon research needed. Based upon gaining political support Based upon the fiscal situation Development of Prototype(s) or Final Design(s)

Machiavelli on Change One should bear in mind that there is nothing more difficult to execute, nor more dubious of success, nor more dangerous to administer than to introduce a new system of things: for he who introduces it has all those who profit from the old system as his enemies and only lukewarm allies in those who might profit from the new.

Additional Parking/Access Project - Needs All would generally agree that the campus is congested. What is really needed? More Parking – structures and/or lots? More busses? Jitneys? Trolley? Organized “kiss and ride”? Car and Vanpools? Internal circulation plan?

Additional Parking/Access Project – Business Plan Business Plan Revenue Stream? Bus Fees Parking Fees Other Initial Cost? Construction Other – Design, ?? Operation and Maintenance (O&M) Cost?

Additional Parking/Access Project – Engineering Select Final Plan (list of selected alternative phases or construction projects) Prepare PS&E (plans, specifications, and estimates) Etc.

Basic Assumptions TAMU Enjoys Sovereign Immunity and can do as it pleases – state law. TAMU owns the land. There are no significant environmental issues. General Revenue can not be used to provide for parking – state law. TAMU can not “go into debt” – state law.

New CE Building Project Development Plan Need – Modern Classroom and Project Space. Classrooms Traditional TAL – ACL – ILC Type space Project Space Growth Areas Traditional Laboratories High Tech Offices Departmental Faculty and Other Instructors Student Organizations

CE Building Business Plan How many sq-ft of laboratory, office, and classroom space? What will enhance our reputation? Cash Flow Considerations: What will big donors support? What will the State support? Location Considerations

Back-of-the-Envelope Estimate Determine Sq-ft Traditional Classrooms High Tech Classrooms Traditional & Computer Labs Offices – Individual and Departmental Price out each using Means Manual and other sources of Info

Cont’d. Sum Direct Costs Building Equipment Determine A/E Fees Add TAMU Indirects Add Profit and Contingency Etc.

CE Building Basic Assumptions We Own the Land There are no significant environmental issues. We can use a mix of State and Private Funds TAMU can not “go into debt” – state law

Assignment As Teams, by Monday at the start of class, make a first cut at the estimate and be prepared to discuss and ask questions in class. Then, as Teams refine your work and turn in a final estimate on Wednesday as Assignment #2

CE Building – Assignment? As Individuals make first cut at the costs and be prepared to explain. Turn In and Keep a copy. After Teams are formed. We will refine the estimates from your original work.