Network Modeling Group Modeling Off Nominal Transformers in NMMS By Nitika Mago, Model Administration.

Slides:



Advertisements
Similar presentations
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Advertisements

Photos placed in horizontal position with even amount of white space between photos and header Sandia National Laboratories is a multi-program laboratory.
ECE Electric Drives Topic 6: Voltage-Fed Converters Spring 2004.
EE 369 POWER SYSTEM ANALYSIS
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Presented by: Hao Liang
EE 369 POWER SYSTEM ANALYSIS
On Load Tap Changing Transformer Paralleling Simulation and Control.
Transformer Professor Mohamed A. El-Sharkawi. 2 Why do we need transformers? Increase voltage of generator output –Transmit power and low current –Reduce.
ECE 333 Renewable Energy Systems Lecture 13: Per Unit, Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
Transformer Construction
Connecting Diverse Web Search Facilities Udi Manber, Peter Bigot Department of Computer Science University of Arizona Aida Gikouria - M471 University of.
Announcements Be reading Chapter 3
Transformer heat run test: The loading back method IEEE transformer Committee meeting, March 2008 By Marcel Fortin, eng., Consultant.
Substations. Substations Chapter 4 Substations Major types of equipment found in most transmission and distribution substations with their purpose,
Resource Asset Registration Form Version 5.0 / 5.1 Changes for WGRs QMWG Presentation - July 9, 2012.
Jay Britton
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
Coupling Element and Coupled circuits Coupled inductor Ideal transformer Controlled sources.
Connections of a CT and a PT to supply, load and relay.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
Announcements For lectures 8 to 10 please be reading Chapter 3
KD Relay Application: Compensator distance relay that provides a single zone of phase protection for all three phases. It provides tripping for phase to.
Announcements Please read Chapter 3 H4 is 4.34, 4.41, 5.2, 5.7, 5.16
SMART SENSORS FOR A SMARTER GRID BY KAILASH.K AND LAKSHMI NARAYAN.N.
POLYPHASE CIRCUITS LEARNING GOALS Three Phase Circuits Advantages of polyphase circuits Three Phase Connections Basic configurations for three phase circuits.
Announcements Please read Chapter 3; start on Chapter 6
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
SPWG SHORT CIRCUIT CASE BUILDING AND DEVELOPMENT July 17, 2014 Qiuli Yu and Jay Teixeira ERCOT.
Resource Asset Registration Form Version 5.1 Update July 12, 2012.
Status Update: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
II. WIND TURBINE GENERATOR MODEL
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Announcements For lectures 9 and 10 please be reading Chapter 3
1 TSP Nodal Engagement Market Participant Call ERCOT July 14, 2010.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
November 12, 2010 Regional Planning Group Long-Term System Assessment Project Update Warren Lasher Manager, Long-Term Planning and Policy Jonathan Rose.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
1 Update to NATF on Resource Registration Feb 2, 2010.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
Nodal Planning Model Process and Data Set A case use June 28, 2010 Planning Working Group.
Status Update to ROS: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
Hao Zhu Dept. of Electrical & Computer Engineering University of Illinois, Urbana-Champaign ECE 498HZ: Power Distribution System Analysis.
October 29, 2012 RARF Workshop 2 ERCOT RARF Data Request Issues Jay Teixeira Manager, Model Administration.
SCR760 Preliminary Impact Analysis SCRTSP RequirementCost Delivery Keep TP current for all new PSS/E releases $610K - $760KDec Represent.
SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY PREPARED BY: 1)BALDIWALA ALIABBAS ( ) 2)PARTH GUPTA ( ) 3)ANIL KHATIK ( )
1 TSP Nodal Engagement Market Participant Call ERCOT June 02, 2010.
Nodal Planning Go Live Austin, TX February 3, 2011
Transformers. Single Phase Transformers Principles of Operation – Single Phase.
Transformer Professor Mohamed A. El-Sharkawi
Low Scale Grid Emulator Test Bench For In-house Validation Of High Power Converters Oriented To Offshore Speaker: Markel Zubiaga
Lesson 26: Transformers and Reflected Impedance
POWER FACTOR CORRECTION
ECE 476 POWER SYSTEM ANALYSIS
B4.2 Power System One-Line Diagrams
Transformer heat run test: The loading back method
Module B4 Per Unit Analysis
GUJARAT POWER OF ENGINEERING AND RESEARCH INSTITUTE (104)
Computing Reliability
ECE 333 Green Electric Energy
ECE 333 Green Electric Energy
Transformer Impedance
FPGA Glitch Power Analysis and Reduction
The Network Model Management System
ECE 333 Green Energy Systems
ECE 576 Power System Dynamics and Stability
Module B4 Per Unit Analysis
Model Validation for Large Scale PV Plants
Presentation transcript:

Network Modeling Group Modeling Off Nominal Transformers in NMMS By Nitika Mago, Model Administration

Expectations from any proposed resolution Agenda Off-Nominal Transformer – Modeling challenges faced with prevailing software Expectations from any proposed resolution A Nominal Equivalent for two winding & three winding tranformers Nominal Equivalent – Report Card Questions 4/20/2017 ERCOT Limited

The Challenge – Scenario 1 Operations & Market Systems XFMR Impedance XFMR Tap info. NMMS Vrated = Windingrating Vnominal = Bus kV Vneutral = Windingrating @100 MVA & Vnominal Transformer Test Data (converted to appr. SI units using rated kV & 100MVA as base) Planning System XFMR Impedance XFMR Tap info. @100 MVA & Vrated 4/20/2017 ERCOT Limited

The Challenge – Scenario 2 Operations & Market Systems XFMR Impedance XFMR Tap info. NMMS Vrated = Windingrating Vnominal = Bus kV Vneutral = Windingrating @100 MVA & Vnominal Normalized Transformer Test Data (converted to appr. SI units using nominal kV & 100MVA as base) Planning System XFMR Impedance XFMR Tap info. @100 MVA & Vrated 4/20/2017 ERCOT Limited

Allow direct correspondence with field telemetery. Any resolution must….. Provide a clean & simple method for appropriately representing an off-nominal transformer. Standardize the submission & consumption of off-nominal transformer information from the model. Allow direct correspondence with field telemetery. Minimize software changes necessary to implement the resolution. Maintain system reliability & operations. 4/20/2017 ERCOT Public

A Nominal Equivalent for an Off-Nominal 2 Winding Transformer A combination of a nominal transformer with its impedance scaled to compensate for the off-nominal-turns-ratio. The scaled impedance of this resulting transformer (ztotal) can be derived using the off-nominal transformer’s impedance (z) as, 4/20/2017 ERCOT Public

A Nominal Equivalent for an Off-Nominal 2 Winding Transformer Any associated TapChangers must be modeled using prevalent modeling practices, taking care to ensure Step Voltage Increment is provided in percentage per unit of the nominal voltage. Neutral Step represents the step at which rated voltage is produced Neutral Voltage reflects the winding’s rated voltage. 4/20/2017 ERCOT Public

A Nominal Equivalent for an Off-Nominal 3 Winding Transformer Three winding transformers are modeled in the NMMS as a set of 3 two-winding transformers connected at a common 1kV node. Model consuming applications such as the Topology Processor are designed to read this T-equivalent and convert it to true three-winding Transformer model. When any of the windings in such a transformer is off-nominally rated, its nominal equivalent follow all principal’s defined for a two-winding transformer. 4/20/2017 ERCOT Limited

A Nominal Equivalent – What works and what doesn’t Operations & Market Systems XFMR Impedance XFMR Tap info. NMMS Vrated = Bus kV Vnominal = Bus kV Vneutral = Windingrating @100 MVA & Vnominal A Nominal Equivalent for an Off-Nominal Tranformer Planning System XFMR Impedance XFMR Tap info. @100 MVA & Vrated 4/20/2017 ERCOT Limited

A Nominal Equivalent – What works and what doesn’t Topology Processor is currently tuned to extract the following TapChanger information by relying on the TransformerWinding.ratedkV attribute in CIM. Winding Turns Ratio (WINDV1) Voltage or phase angle @ High Step (RMA1) Voltage or phase angle @ Low Step (RMI1) With nominal equivalent for an off nominal transformer the computations for these is affected negatively. Current Updates needed 4/20/2017 ERCOT Limited

A Nominal Equivalent – What works and what doesn’t Voltage or phase angle @ High Step (RMA1) Current Updates Needed Voltage or phase angle @ Low Step (RMI1) 4/20/2017 ERCOT Limited

A Nominal Equivalent – What works and what doesn’t Resolution options (in order of preference, ease of implementation) Update the computations in Topology Processor to extract all TapChanger related information from the TapChanger instance in CIM. Use MOD to submit corrective PMCRs. Post Process the RAW output from existing Topology Processor to correct the associated fields with information from NMMS. 4/20/2017 ERCOT Limited

Modeling Off Nominal Transformers in NMMS Questions? 4/20/2017 ERCOT Public