Prequalification WORLD BANK Seminar on Procurement of Goods, Works and Consultancy Contracts financed from World Bank Loans and IDA Credits, February 27.

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
MASBO February Information to purchase Services Information to purchase Construction.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Tendering Yuck!.
Pre qualified Contractors or Professional Contractors: Role of BPP in stopping quackery in the Water Industry Presented by Engr. Emeka Ezeh OFR Director-General,
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
ZHRC/HTI Financial Management Training
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Construction Industry Development Board development through partnership Activating the Registers within Construction Procurement 1b.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Marcy Mealy Procurement Specialist CDBG Program
CIVL202 Construction Engineering I
Contracting with WYDOT
PROCEDURES FOR SELECTING THE CONTRACTOR
Washington Metropolitan Area District Office SBA.
Selection of Consultant Nazaneen I. Ali Sr. Procurement Specialist 1.
Very Small-Value Procurement Under World Bank/IDA Small Grants, Loans and Credits Zagreb Regional Procurement Training Feb. 27 – March 3, 2006.
INTRODUCTION TO PUBLIC PROCUREMENT
 When Permitted  Size Requirements in Joint Ventures  8(a) Joint Venture Requirements  Joint Venture Review Process  Summary of Substantive Changes.
1 Bid evaluation - Works  Clarification of bids ( if necessary)  Determination of responsiveness “Substantial” responsiveness No material deviations.
U.S. Small Business Administration
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
1 1 Module II. Bidding and Evaluation Process I.Bidding documents (Stages of bidding & preparation of bidding document) II.Bid evaluation methods (principles.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
Construction Contracts and Project Delivery Methods
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
COMPETITION REQUIREMENTS
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Walkthrough February 27 – Mar 3, 2006, Zagreb, ECA.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Salient IRR Revisions Standardized Bidding Procedures Goods, Infra, Consulting.
CONSTRUCTION CONTRACTS DOCUEMENTS
Generic Documents for the Design, Build, Operate Contract for a Solid Waste Facility.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
TRAINING PROGRAM PROCUREMENT GUIDELINES IMPORTANT ASPECTS 1.
Procurement in Projects Financed by Islamic Development Bank Presented during Project Start-up Workshop September 2015, Jakarta, Republic of Indonesia.
Evaluation of Goods and Works …and Case Studies to test your new skills! Seminar on Procurement of Goods, Works and Consultancy Contracts financed from.
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Invitation to Bids (ITB) and Bid Data Sheet (BDS) February 27- Mar.
Millennium Challenge Account-Benin II Feasibility Study to Establish a Power Generation Company (GENCO) Pre-proposal Meeting March 30, 2016 Brief Procurement.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.
FIDIC Tendering Procedures
Advisor, IDS Cell1 NEGOTIATIONS G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell Monday, July 11, 2005.
Tender Evaluation and Award Process
FAR Part 2 - Definitions of Words and Terms
Content of Tender Dossier - Instructions to Tenderers - Tenders
Presented by: AfDB Team Facilitator: Sophie DIMBUNGU
WORLD BANK Harmonized SBD-Works
Evaluation Grids Evaluation Grids.
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
Qualification Criteria and Available Tender Capacity
Bid Evaluation and Award
PROJECT DELIVERY METHODS
PROCUREMENT POLICIES AND GUIDELINES
Chapter 11 Sources of Capital
Provision of HR Services, UNOPS Nepal
Procurement of Works -1 Ghana Shyam Gautam.
Presentation transcript:

Prequalification WORLD BANK Seminar on Procurement of Goods, Works and Consultancy Contracts financed from World Bank Loans and IDA Credits, February 27 - March 3, 2006, Zagreb, Croatia

2 Prequalification Definition Capability assessment of firms to carry out a particular contract prior to being invited to submit a bid is a process called prequalification

3 Prequalification SPECIALLY SUITABLE FOR Large or complex civil work Custom designed equipment Industrial plant Specialized services Complex information technology Turnkey,design and build, management contracting

4 PQ – Why do it? ADVANTAGES Enhances participation of serious contractors (since unqualified bidders are excluded) Reduces high cost of bidding Gives early warning of competition potential Reduces complaints of disqualified bidders Gives “ Peace of Mind ” to Employers

5 Prequalification MORE ADVANTAGES Borrower able to assess interest of qualified firms Identifies potential conflict of interest (contractors with business association with consultants) Reduces time in evaluating bids from unqualified bidders Reduces potential for controversy Early Detection of Employer’s capacity to manage procurement

6 Prequalification DISADVANTAGES Increases procurement lead time (minimized by undertaking prequalification while preparing bidding document) Review of all application is mandatory whereas post-qualification requires review of only winning bid (BUT VERIFICATION OF INFORMATION SUBMITTED IS NOT REQUIRED FOR THE PQ EXERCISE) Possibility of collusion ADVANTAGES OUTWEIGH DISADVANTAGES

7 PQ – If you meet the Criteria you may enter in contest! Every firm or JV that meets the PQ criteria, which is always Pass or Fail, does become pre-qualified. Employer can not modify the criteria to increase or decrease the number of pre-qualified firms during evaluation. The worst problems in civil works usually arise from contractors lacking knowledge, means, funds, equipment or personnel.

8 PQ CRITERIA (Slide 1 of 3) History of Non-Performing Contracts. The Employer must ensure that the prospective Contractor doesn ’ t have a history of litigation an non- performance. Failure to Sign Contract Not being under execution of a Bid Securing Declaration. Pending Litigation All pending litigation shall in total not represent more than [insert number ] %, [insert percentage in words] of the Applicant's net worth and shall be treated as resolved against the Applicant.

9 PQ Criteria (Slide 2 of 3) Financial Requirements  Sound position; long term profitability.  Cash Flow (on hand) of about 4 months (to finance work unpaid) Straight line calc.  Annual turn-over for a number of years of no less than 2 times annual disbursement of contract. (used to be 10 and then 5, 3, and now 2) This reduces chance of contractor going broke on your job! Borrowers may use 3 which is more conservative. We will see an example of how to calculate these figures later in this presentation!

10 PQ criteria (Slide 3 of 3) Construction Experience  Completed one or 2 “ Contracts ” of similar type and value (80%) during last 5 years.  Executed similar work of same key items of BOQ in similar periods, at a 80% of the rate required. Including peak periods if needed. We will see an example of this later in this presentation!

11

12 Prequalification (& the new PQ document) REVISED PREQUALIFICATION DOCUMENT DESIGNED TO Simplify Employer’s preparation time Reduce Applicant’s preparation time Simplify evaluation of applications by Employer Minimize Bank’s review time

13 Prequalification – PQ Document PART I -APPLICATION PROCEDURES Section I:Instructions to Applicants(ITA) Specifies procedures to be followed by the Applicants No modifications permitted in Section I Section II- Application Data Sheet (ADS) Provisions specific to given package Section III -Qualification Criteria Section IV- Application Forms

14 Prequalification PART 2: WORKS REQUIREMENT Section V Briefly describes scope of works, time for delivery and completion, technical specification,etc. EMPLOYER REQUIRED TO FILL ONLY SECTION II - Application Data Sheet SECTION III- Qualification criteria SECTION V - Scope of work USER’S GUIDE – Not a part of prequalification document

15 Prequalification IMPORTANT CLAUSES OF INFORMATION TO APPLICANT (ITA) Source of Fund Corrupt Practices Eligible Applicant What comprises PQ Document Procedure for preparation of application

16 Prequalification – Important Clauses in ITA (Information to Applicants) Submission of application( deadline,late application,etc.)- Late applications to be returned unopened Procedure for evaluation of application (clarifications,domestic preference, specialist subcontractor,etc..) Evaluation and notification

17 Prequalification QUALIFICATION CRITERIA ELIGIBILITY CRITERIA No conflict of interest, government owned entity restrictions, Nationality,Bank ineligibility, UN Resolution,etc. (each partner of Joint Venture to meet each eligibility criteria)

18 Prequalification EXPERIENCE CRITERIA (a) General Construction Experience-normally 5 years or more; 3 years under special circumstances to allow new entities (Each partner of JV must also meet this criteria) (b) Specific construction experience: similar contracts based on physical size,complexity, methods/technology, etc. (1 to 3.. normally 2); Applicant to have completed or substantially completed one or more contracts of a value(not less than 80%) of the proposed contract over the stated period say five years key construction activity( earthwork, concrete etc);Applicant to demonstrate experience ;example pouring or placement of rock or concrete of 80% of peak monthly or annual rates expected under proposed contract over stated period say 5 years

19 Prequalification FINANCIAL CRITERIA (a) Applicant to establish financial soundness and long term profitability for last 5 years (exceptionally 3 years) – each Joint Venture partner must meet this requirement (b) Minimum cash-flow for specified amount (c) Average Annual Construction Turnover within last five years or more (three years exceptionally) for not less than twice the estimated annual turnover of proposed contract(may be reduced to 1.5 for contracts over US$200 million);for JV each partner must meet a percent (say 25%) and one partner must meet a percent (say 40%) of requirement

20 Prequalification Criteria for historical contract non-performance and pending litigation Pending litigation not to exceed 50% of Applicant’s net worth( each partner of JV to meet this requirement) OTHER IMPORTANT ASPECTS Employer to set pass/fail criteria Joint Venture must satisfy collectively specified qualification requirement in full, in addition to each partner meeting specified minimum

21 Prequalification Verification of liquid asset/line of credit,key personnel and equipment at time of award Multiple Contracts: Qualification criteria to be indicated for each contract and applicants to be qualified for one or more contracts Basis for multiple contract awards:consider combination of bids offering lowest evaluated cost to Employer for all contracts

22

23

24

25

26

27

28 Prequalification Will need to Address the Slice and Package: size of package, preferably to be similar and number of slices not to exceed 4 – complexity of evaluation increases with more numbers Conditional Prequalification ( examples, provision of additional critical information, revision of preliminary JV Agreement, proposal for subcontracting specialized elements, questionable ability to undertake subject contract along with pending contracts)

29 Prequalification No upper limit on numbers: all firms that meet criteria must be prequalified Notify each disqualified Applicant giving an indication for reasons for disqualification Invite all qualified Applicants to bid Changes in structure or formation of Applicant after prequalification : requires prior written approval of Employer/Bank Re-verify critical qualification information at time of award

30 vs. Postqualification ! Only for selected bidder Criteria (Goods) Eligibility Experience of supply of similar items over a specified period Manufacturer’s authorization to supply Production capacity

31 Production capacity Technical capability Financial resources Spare parts and service Past performance Postqualification

32 Postqualification Criteria (works) Eligibility Past experience (size/complexity) Personnel resources Equipment resources Financial capacity Litigation/arbitration history If there was prequalification, confirm that bidder’s status is substantially the same as at prequalification