Community Reference Group Meeting #3 MITCHELL FREEWAY EXTENSION Burns Beach Road to Hester Avenue Chris Raykos Project Director Infrastructure Delivery.

Slides:



Advertisements
Similar presentations
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
Advertisements

A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Fleurieu Regional Aquatic Centre Project summary October 2013 council meetings.
Chris Raykos Project Director Infrastructure Delivery Directorate
Fountaingrove Parkway Summary of Recommendations November 27, 2007.
Presentation to Environment, Housing and Planning Scrutiny - 16 th March 2009 Allotment Service Update Report David Robinson, Assistant Director (Liveability)
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Environmental Assessment Public Meeting
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
River Road West Penrose Street Bridge Street Road Safety Scheme May 2014.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
MTF Rail Development Forum
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
The Ministry of Transportation and Infrastructure welcomes you to an Open House for: Trans Canada Highway No.1 Improvements in Salmon Arm Your comments.
Trail Funding Sources & General Information
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Road Infrastructure and Road Safety George Mavroyeni – Executive Director, Major Projects (former Executive Director, Road Safety and Network Access) May.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
STA Safety Project PID #76439 December 12, 2006.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
1/23/20161 Traffic Calming Devices Workshop Prepared by City Engineering Department.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Proposed Amendments to the OPGGS Environment Regulations Information Session Melbourne & Perth December 2013.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, January 21, 2016.
METRO PADYAKAN Walk and Bike Ways Go to Home Page.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
 May 1, 2012 City Council approved lease of premises at MLK to the Lycée Français La Pérouse (the “Lycée Français”)  Under section 16.5, Traffic and.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Light Rail Project Community Light Rail Support Plan Committee 14 August 2014 Kensington Kingsford.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Planning Commission Meeting July 30, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Improvements to Stockton Street
All About the County Road 22 Roundabout
Four Winds Condominium Association August 2, 2017
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Project Status & Right-of-Way Acquisition
Project Management Team Meeting #3
The Oakton Condominium Association September 12, 2017
US-223 Connector PUBLIC MEETING
Winkleigh Neighbourhood Plan What is the Neighbourhood Plan?
Comprehensive Transportation Plan
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
PUBLIC HEARING PRESENTATION: RESIDENTS’ CONCERNS
Harbour Island Force Main Replacement
Manilla Low Level Crossing Project
Metropolitan District | mndot.gov
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Presentation transcript:

Community Reference Group Meeting #3 MITCHELL FREEWAY EXTENSION Burns Beach Road to Hester Avenue Chris Raykos Project Director Infrastructure Delivery Directorate 2 December 2013

Project Development Activity Update: Design CONCEPT DESIGN/TRAFFIC STUDIES: Concept design for the road and structures nearing completion expected to complete by end of December Traffic studies have been completed and GHD will be presenting the study to the group today. Noise modelling has commenced and is nearing completion. GHD will also be presenting the noise wall requirements and their locations to the group today.

Project Development Activity Update: Geotechnical Investigation GEOTECHNICAL INVESTIGATION: Works are in progress It is expected that the investigation works to complete by end of February 2014.

Project Development Activity Update: Environmental Studies(1) Graceful Sun Moth (GMS) survey – completed – Final report has been received. Level 1 Flora/Fauna Survey – completed – Final report has been received. European Heritage desk top survey and field study completed – final reports have been received. Dieback Assessment- completed – final report has been received. Carnaby black cockatoo Assessment report – completed – final report has been received. Contaminated sites report – completed – final report has been received.

Level 2 Flora (Spring) Survey has been completed and draft report is received for Main Roads review. Level 2 Fauna study including fauna Movement Study in conjunction with Department of Parks and Wildlife– Survey is currently underway. Reports is expected by January After the environmental approvals the Development Application to Western Australian Planning Commission (WAPC) will be prepared. Project Development Activity Update: Environmental Studies(2)

EUROPEAN HERITAGE: European Heritage Desktop Assessment and field study completed – final reports have been received. ABORIGINAL HERITAGE: Aboriginal Heritage Survey – Department of Aboriginal Affairs advised that there is no need for an archaeological survey as the previous surveys will suffice. An Ethnographic Survey has been completed - Report expected by mid- December We have been verbally advised that a S18 is not required as the Project is not impacting any sites. During consultation it was suggested by the Aboriginal groups that: a)Yaberoo Budjara walk trail to be maintained b)Sign board preferably at Wanneroo Road/Neerabup Road intersection details the cultural association of the Aboriginal group to the area c)Naming the Neerabup Road with an Aboriginal name Project Development Activity Update: Environmental – Heritage

FEDERAL APPROVAL UNDER EPBC ACT The Federal Referral to Department of the Environment (DotE) under the EPBC Act will be submitted to on 6 December Arrangements are in place to secure offset land. This is in addition to the offset land that was set a side during MRS amendments. The Federal approval process could take up to 6 months. Project Development Activity Update: Environmental – Approvals

STATE APPROVAL Neerabup Road referral for deferred factors (under Section 38) - Concept Plan, Park Management Plan, Fauna Movement Study and outcome of the Spring Survey. Also the framework for various Management Plans covered under Ministerial Statement 629 as part of the referral document. A discussion with local environmental groups is required prior to Environmental Protection Authority (State) referral which is anticipated February 2014 after receiving the Fauna Movement Study Report. It is expected to submit the State referral in March Project Development Activity Update: Environmental – Approvals

Project Issues QUARRY ACCESS ROAD BCG quarry (SE quadrant of Mitchell Fwy/Hester Ave interchange. Access to the BGC quarry falls within the Hester Avenue reserve which interferes with Hester Avenue duplication. Main Roads has commenced discussions with the relevant stakeholders on relocating the current access road (miscellaneous lease with RCG) where it interferes with the freeway/Hester Avenue works. Relocation of access will involve environmental approval requirements.

Items for Discussion Carried Forward from CRG#2 Recreational Walkways Installing underpasses to coincide with walking trails and suitable for both fauna and pedestrian. Flynn Drive update; and Intersection Improvements. A meeting is scheduled for Fri 6 th December with City of Wanneroo and City of Joondalup to discuss.

Delivery Period StageDescriptionDelivery Period 2013 to 2015 Immediate Intersection improvements (Under existing procurement) Marmion Avenue / Hester Avenue: Modify roundabout and include peak load signals – CoW 2012/13 NBSPOT Wanneroo Road / Hester Avenue: Improve right turn provisions for vehicles travelling to and from Hester Avenue and left turn onto Wanneroo Road from Hester Avenue (has commenced) – CoW 2009/10 NBSPOT , our project description is Install TCS and protected right turn lane. Anchorage Drive / Marmion Avenue / Neerabup Road: Seek opportunities to increase throughput during peak load and with planned Catalina development – CoW. Marmion Avenue / Kinross Drive: Review Raised Reflective Pavement Markers CoJ. Burns Beach Road / Connolly Drive: Include dedicated left turn southbound or possible signalisation CoJ. Works by City Of Wanneroo is currently in progress. The work has been completed. Further improvement will take place when Hester Avenue is duplicated as part of Mitchell Freeway Extension works. CoJ is currently investigating and preparing a concept. CoJ is currently investigating. Intersection Improvements

QUESTIONS? Delivery Period StageDescriptionDelivery Period 2013 to 2015 Immediate Intersection improvements (Under existing procurement) Burns Beach Road / Sunlander Drive: Modify/close right turn provision CoJ. Burns Beach Road / Mitchell Freeway: Provide for two right turns east bound on Burns Beach Road to Mitchell Freeway CoJ. Burns Beach Road / Joondalup Drive: Provide for additional left turn from Burns Beach Road to Joondalup Drive with dedicated right turn – CoJ. Wanneroo Road / Joondalup Drive: Second left turn eastbound on Burns Beach Road to Wanneroo Road; Second right turn from Burns Beach Road to Wanneroo Road – CoW. Network improvements and road safety upgrades on Wanneroo Road from Joondalup Drive to Hall Road CoW. CoJ is currently investigating This is about forming a lane further east through the median. The line marking allows one dedicated left lane and shared left turn and right turn to allow both movements. The traffic studies indicates that the roundabout is working satisfactorily. Intersection Improvements

QUESTIONS?