Do not put content on the brand signature area Basic template Subtitle Location – Date www.ing.com Name of the speaker Job title.

Slides:



Advertisements
Similar presentations
Guide to Business Improvement Tools
Advertisements

Lean Six Sigma Project Presentation Template
Project Storyboard Template
Roberto lopez LSSMBB DMAIC project template.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
Overview of DMAIC A Systematic Framework for Problem Solving
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Black Belt Level DMAIC Certification Checklist
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
DMAIC Process Storyboard
1 Project Name Team Lead Location Month XX, Year.
Welcome to Lean Six Sigma Green Belt Training
11 Explanation to Participants about this template and final presentation This template is meant as a Six Sigma / Re engineering Submission Template This.
Black Belt Project Storyboard Template
Project Title Team Leadname Team MembersMember names Process Ownername Championname Insert your company logo here.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Items Required for Process Hand-off
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
Practical Assessment Project Template
Project Title GB or BB name: XYZ. Define Phase D D M M A A I I C C.
Define Tollgate Checklist
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Lean Six Sigma Project Briefing Type Briefer Organization Here
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
Project Title GB or BB name: XYZ.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Confidential, , MBX Template Book Confidential, ,
David Pasquarello Ikon Office Solutions
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Practical Assessment Project Template
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
Practical Assessment Project Template – DMADV
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template

Lean Six Sigma Road Map Improvement Process Road Map
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Lean Six Sigma DMAIC Improvement Story
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Practical Assessment Project Template
Lean Six Sigma DMAIC Improvement Story
DMAIC Project Template
OPS/571 Operations Management
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
The Define Phase Templates and Worksheets
Explanation to Participants about this template and final presentation
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
Certification Resources Workbook
Six Sigma DMAIC Process
DMAIC STANDARD WORK TEMPLATE
Measure Phase Wrap Up and Action Items
Practical Assessment Project Template – REV. 5.2
CPI Event / Project Tollgate Template
Lean-Green belt six sigma program
Practical Assessment Project Template – REV. 5.2
Practical Assessment Project Template – DMADV
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services2 Executive Champion: Local Champion: Process Owner(s): Master Black Belt: Black Belt: Green Belt: Financial Analyst: Other Team Members: Related Projects: Project Name ICE Country and Functional Line Advisors Network Finance Human Resources Legal / Compliance Customer Service Defined Contribution Employee Benefits Information Technology Marketing Mutual Funds Retail Annuity Retail Life Reinsurance / Institutional Markets Tollgate Stage MM /DD/ YYYY Project ID:

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services3 Project CCR’s Validated VOC Completed Team Charter Preliminary CBA Estimate Validated Process Map Identify Quick Wins Identify Issues & Barriers Project Schedule List of Potential Root Causes List of Statistically Significant Xs Demonstrate Relationship of X’s to Y Preliminary CBA Process Evaluation Develop to be process Demonstrate Improvements via Pilot Graphical Analysis of Pilot Finance Approved CBA MSA Results on Xs New Process Performance Statistical Confirmation of Improvements Process Management System Plan (SPC) Process Owner Handoff Final CBA Completed QFD/CCR Tree Operational Definitions Specification Limits Stated Targets Defect Definitions Measurement Plan Measurement System Analysis Graphical Analysis Rolled Through Put Yield Baseline Current Process Performance ( Z st) Key Deliverables: Surveys Focus Groups Interviews SIPOC Functional Deployment Map FAST, Stakeholder Analysis QFD / CCR Tree Measurement Plan Continuous Gage R&R Attribute Gage R&R Sample Size Calculator Pareto Charts Graphical Summary Line Charts Benchmarking Process Capability Dot Plots Box Plots Run Charts Normality Testing Fishbone Diagram Hypothesis Testing Regression Analysis DOE NVA and VA Analysis Pugh Matrix New Functional Deployment Map FMEA on new process Pilot Continuous Gage R&R Attribute Gage R&R Control Charts Hypothesis Testing Control Plan Process Capability 1) 2) 3) DefineMeasureAnalyzeImproveControl Tools 1.Identify Critical Customer Requirements 2.Develop Team Charter 3.Develop Process Maps 4.Select Critical Customer Requirement 5.Data Collection Plan Validate MSA on (Y’s) 6.Calculate Baseline Process Capability 7.Identify Potential Root Causes 8.Validate Root Causes 9.Evaluate Root Cause Relationships ( y = f (x)) 10.Develop Improvements 11.Confirm Results and Validate Improvements 12.Validate MSA on X’s 13.Calculate New Process Capability 14. Implement Process Control DMAIC Process Steps

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services4 Identify Potential Critical Customer Requirements Define - Step 1 Internal or External Customer (Name, Role & Business) Customer (Name, Role & Business) Critical Customer Requirements (CCR’s) Voice of the Customer (VOC) Customer Customer Surveys, Tick Sheets, Data Logs, Surveys Existing Metrics, Dashboards, Management Reports Customer Surveys, Tick Sheets, Data Logs, Surveys What Customer Research Methods Will You Use To Collect New Data? Existing Metrics, Dashboards, Management Reports What Sources Of Customer Data Already Exist?

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services5 Team Charter Estimated Financial Benefit: Business Case: Problem Statement: Goal Statement: (“ SMART” : Specific, Measurable, Attainable, Relevant, Time bound”) Scope (In and Out): Process (Starts and Finishes): Start point and stop point of the process Phase Tollgate Dates Status Red Yellow Green CPT > 2 weeks behind 1 day – 2 weeks behind On Track Complete STATUS Legend Explanation of why we’re doing the project? For example, will it improve customer satisfaction, decrease defects, increase market share, save estimate euros... relate it to the Business Y’s This should reflect the financial loss that results from the current process sigma or the potential gain from the future process Description of the problem/opportunity & objective in clear, concise, measurable terms; How often is the problem occurring? Where the problem occurring? Who is it impacting? Current Defect Rate: If you do not yet know the defect rate, in the Define phase you may fill in for example: The current defect rate is running at X% WHEN do you want to have the improvement in place? How much of an improvement are you aiming for, e.g. XX% defect reduction, XX% cycle time reduction)? What measurable business impact will the improvement have? Type? Magnitude? For example, Deliver an improved process to reduce rebooks in the Business Center by 50% by 12/31/01. What process will the team focus on? What are the boundaries of the process you would like to improve? Other processes, areas that will NOT be reviewed in this project scope Unit Cost Reduction Cost Out Productivity / Scale Calculation goes here MM/DD/YYYYControl MM/DD/YYYYImprove MM/DD/YYYYAnalyze MM/DD/YYYYMeasure MM/DD/YYYYDefine From Measure Step 4Customer Requirements (CCR’s): From Measure Step 4Customer Requirements (CCR’s): MTPMTP Strategic Alignment

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services6 SIPOC – Existing High Level Process Flow Define - Step 3 CustomerOutputProcessInputSupplier WHO are your customers? (From Step 1) WHAT does the customer receive? (Think of their CCR’s) What STEPS are Included in the Process today? (high level) What is provided to START the process? Who PROVIDES the input? (Who) (Verbs) (Use Nouns) (Who) Step 1: Step 2: Step 3: Step 4: Step 5: Step 6: Step 7: P SIOC (Use Nouns) List Supplier List Input List Outputs List Customer

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services7 PFD – Process Flow Diagram Define - Step 3

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services8 Chart Current Performance Define - Step 3 Identify performance gap between current performance and desired performance as identified in the goal statement

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services9 Stakeholders Map – Pre Improvement Define - Step 3 * When Populating the Stakeholder, consider the FAST Method F= FYI – Information Only A= Approver S= SME Subject Matter Expert T= Team Member Influence On Project High Medium Low MediumHig h Impacted By Project Stakeholder Position Strongly Supportive Neutral Opponent 1S 2S 3F 4T 5A 6F 7A7A 8S9S 10A 11T Stakeholders:Distribution, New Business, Underwriting, Legal, IT, Actuary, Web Team, Customer Svc/Ops, Marketing, Finance, Compliance Where are your Stakeholders?

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services10 Issues and Barriers Define - Step 3 List any project concerns or limitations that would hinder the project Issue / Concern / LimitationAbatement PlanOwner Limited or no IT resources availableSolution must Not require ITTeam Project must be implemented by X datePrioritize Project Recommendations Leaders Limited or no funding availablePrepare CBAProject Lead / MBB Political resistance as identified from the stakeholders tool Identify concerns and address them individually All

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services11 Quick Wins Define - Step 3 List any Improvements that can be implemented immediately without further investigation Quick WinImplementation PlanOwner Eliminate duplicate state appointmentsModify compliance regulations that cause these duplicates Team Lead / Process Owner

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services12 Define Tollgate 7/19 Measure Tollgate 8/23 Analyze Tollgate 9/13 Improve Tollgate 9/28 Control Tollgate 12/13 Project Timeline Define - Step 3

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services13 Summarize findings, present recommendations and document next steps. Next Steps Define - Step 3

Do not put content on the brand signature area Orange RGB= 255,102,000 Light blue RGB= 180,195,225 Dark blue RGB= 000,000,102 Grey RGB= 150,150,150 ING colour balance Guideline Banking - Investments - Life Insurance - Retirement Services14 Team Identified Roles and Responsibilities Clearly Identified VOC collected Sources Identified and Information Collected Team Charter Validated Business Case, Problem Statement and Goal Statement SIPOC Completed and Validated Process Flow Diagram Completed and Validated Stakeholders Map Prepared (Optional) Be prepared to discuss Preliminary Cost Benefit Analysis Preliminary Project Schedule Developed Project Kickoff Meeting Completed Incorporate all feedback from Kickoff Meeting and schedule tollgate Documented NEXT Steps for Measure Define Tollgate Checklist