BENCHMARK PARAMETERS OF ANDHRA PRADESH. ELURU CIRCLE.

Slides:



Advertisements
Similar presentations
Partnerships in Power Franchisees
Advertisements

Slide 1 Leveraging GIS to improve efficiencies and reduce costs at North Delhi Power Ltd Arup Ghosh Chief Technical Officer North Delhi Power Ltd (Joint.
" Limited Use, Unlimited Power... "1 Welcome To The Esteemed Consumers Of BESCOM In Tariff Revision FY-16 Hearing.
STATE : KARNATAKA BESCOMMESCOMHESCOMGESCOM BENCHMARK PARAMETERS BESCOM CESCO GESCOM MESCOM HESCOM.
1 RESTRUCTURED APDRP-II IN XI PLAN Scope of Part - B :  Strengthening of Distribution System. Fund Allocation of Part - B:  Proposed fund allocation.
Reactive Power Management - Case study -- Nandan Pathak (AE)
KERALA STATE BENCHMARK PARAMETERS BENCHMARK PARAMETERSOF.
Line Efficiency     Percentage Month Today’s Date
MAHAVITARAN Mumbai ( 6 th June 2005 to 5 th June 2006) Performance and Future Vision.
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
What to look for when completing an AWWA Water Audit for the first time Reinhard Sturm, Vice President Water Systems Optimization, Inc. Paul Johnson, Vice.
1 PRESIDENTIAL ADDRESS by Shri B K Das Chairperson, OERC
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
10-11-November, 2010 Organised by
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
GE Energy Effective Operation and Maintenance of Wind Turbines Through Use of Advanced Services Technologies Philippe Kavafyan GE Energy February 2006.
1 17 August 2001 K Balarama Reddi & Usha Ramachandra TARIFF SETTING UNDER INDEPENDENT REGULATION Rs.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
WATER AND WASTEWATER BENCHMARKS IN AUSTRALIA, NEW ZEALAND AND THE PACIFIC ISLANDS A COMPARISON OF INITIATIVES AND OPPORTUNITIES FOR ALIGNMENT.
Theft in Domestic and Commercial sectors 1Non-metering for want of meters, resulting in arbitrarily assessed consumption 2Tampering of meters 3Wrong recording.
Curriculum Inventory Kickoff. Goals Develop an initial technical specification for the exchange of medical school curriculum inventory data. Provide assistance.
Python Arrays. An array is a variable that stores a collection of things, like a list. For example a list of peoples names. We can access the different.
Mary Ann Woodson National Credit Union Administration Office of the Chief Financial Officer NCUSIF Quarterly Statistics March 31, 2008.
CSEN 5314 Quiz 1. A data model is a collection of concepts that can be used to describe the ___________ of a database. a. structure b. extension c. state.
Global Benchmark Report 24.mar. 14 Global Benchmark Report 2014 Graphs and benchmark figures from: Africa: Open for business.
Benchmarking Water Loss Performance:
WM-OFMP ANNUAL PERFORMANCE MONITORING OF SEVEN REGIONAL WATER COMPANIES Presented by: vera muhaxhiri.
1 POWER FOR ALL. 2 POWER TO ALL WBSEDCL - Overview Consumers151 Lakhs Peak Demand 5, 586 MW Energy Handled 38, 110 MU Total Revenue Rs.19,583Cr Number.
ENERGY MANAGEMENT CASE STUDY. Establish an Energy Savings Strategy for your organisation.
Chilbolton Site Instrument Availability Major Chilbolton Instrumentation Availability during CloudNet Major Chilbolton Instrumentation Availability during.
Key Performance Indicators
Jan 2016 Solar Lunar Data.
Narragansett Electric Rate Classes
Best viewed in slide show mode (F5)
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Best viewed in slide show mode (F5)
Average Monthly Temperature and Rainfall
Apr-Jun Jan-Mar Jul-Sep Oct-Dec
Energy Tracking, Monitoring and Reporting
شاخصهای عملکردی بیمارستان
مفاهیم بهره وري.
What is a Zero Energy House?
Key Performance Indicators
فرق بین خوب وعالی فقط اندکی تلاش بیشتر است
Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat
NERC-WECC Coordination
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Orifice plate meter error resolution – cash flows

Jan Sun Mon Tue Wed Thu Fri Sat
NERC-WECC Coordination
Electricity Cost and Use – FY 2016 and FY 2017
DisCo Performance- An Annual Comparison
01 DRAW YOUR TIMELINE HERE JAN. MAR. JAN. MAR. FEB. APR. FEB. APR.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Module 18 BENCHMARKING.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

BENCHMARK PARAMETERS OF ANDHRA PRADESH

ELURU CIRCLE

BENCHMARK PARAMETERS - ELURU PARTICULARS Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06 Input Energy (MU) Metered Energy (MU) Billed Energy (MU) Revenue Billed (Crs) Revenue Collected (Crs) ARR on Input Energy (Rs./unit) ARR on Billed Energy (Rs./unit) Collection Efficiency (%)99.53%95.65%78.71%100.70% Billing Efficiency (%)47.12%69.93%80.91%85.03% Metering Efficiency (%)47.12%49.79%43.02%50.29% Energy Realised (MU) AT& C Loss (%)53.10%33.11%36.31%14.38% DT failure rate (%) 9.79%7.02% Feeder Tripping (Nos.) Reliability Index(%) 99.99%

TIRUPATI CIRCLE

BENCHMARK PARAMETERS - TIRUPATI PARTICULARS Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06 Apr06 - JUL06 Input Energy (MU) Metered Energy (MU) Billed Energy (MU) Revenue Billed (Crs) Revenue Collected (Crs) ARR on Input Energy (Rs./unit) ARR on Billed Energy (Rs./unit) Collection Efficiency (%)79.60%82.68%91.49%98.67%96.26% Billing Efficiency (%)76.71%79.01%80.99%73.43%88.07% Metering Efficiency (%)37.33%37.92%41.15%45.67%41.01% Energy Realised (MU) AT& C Loss (%)38.94%34.68%25.90%27.57%15.09% DT failure rate (%) 13.21%7.64%9.78%0.71% Feeder Trippings (Nos.)

WARANGAL CIRCLE

BENCHMARK PARAMETERS - WARANGAL PARTICULARS Apr 02 - Mar 03 Apr 03 - Mar 04 Apr 04 - Mar 05 Apr 05 - Mar 06 Input Energy (MU) Metered Energy (MU) Billed Energy (MU) Revenue Billed (Crs) Revenue Collected (Crs) ARR on Input Energy (Rs./unit) ARR on Billed Energy (Rs./unit) Collection Efficiency (%)97.28%82.77%92.91%95.48% Billing Efficiency (%)74.48%77.33%79.40%80.65% Metering Efficiency (%)28.61%30.06%31.41%34.32% Energy Realised (MU) AT& C Loss (%)27.54%35.99%26.23%22.91% DT failure rate (%) 12.55%13.29% Feeder Trippings (Nos.) Reliability Index(%) 99.98%99.99%

END