BENCHMARK PARAMETERS OF ANDHRA PRADESH
ELURU CIRCLE
BENCHMARK PARAMETERS - ELURU PARTICULARS Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06 Input Energy (MU) Metered Energy (MU) Billed Energy (MU) Revenue Billed (Crs) Revenue Collected (Crs) ARR on Input Energy (Rs./unit) ARR on Billed Energy (Rs./unit) Collection Efficiency (%)99.53%95.65%78.71%100.70% Billing Efficiency (%)47.12%69.93%80.91%85.03% Metering Efficiency (%)47.12%49.79%43.02%50.29% Energy Realised (MU) AT& C Loss (%)53.10%33.11%36.31%14.38% DT failure rate (%) 9.79%7.02% Feeder Tripping (Nos.) Reliability Index(%) 99.99%
TIRUPATI CIRCLE
BENCHMARK PARAMETERS - TIRUPATI PARTICULARS Apr02 - Mar03 Apr03 - Mar04 Apr04 - Mar05 Apr05 - Mar06 Apr06 - JUL06 Input Energy (MU) Metered Energy (MU) Billed Energy (MU) Revenue Billed (Crs) Revenue Collected (Crs) ARR on Input Energy (Rs./unit) ARR on Billed Energy (Rs./unit) Collection Efficiency (%)79.60%82.68%91.49%98.67%96.26% Billing Efficiency (%)76.71%79.01%80.99%73.43%88.07% Metering Efficiency (%)37.33%37.92%41.15%45.67%41.01% Energy Realised (MU) AT& C Loss (%)38.94%34.68%25.90%27.57%15.09% DT failure rate (%) 13.21%7.64%9.78%0.71% Feeder Trippings (Nos.)
WARANGAL CIRCLE
BENCHMARK PARAMETERS - WARANGAL PARTICULARS Apr 02 - Mar 03 Apr 03 - Mar 04 Apr 04 - Mar 05 Apr 05 - Mar 06 Input Energy (MU) Metered Energy (MU) Billed Energy (MU) Revenue Billed (Crs) Revenue Collected (Crs) ARR on Input Energy (Rs./unit) ARR on Billed Energy (Rs./unit) Collection Efficiency (%)97.28%82.77%92.91%95.48% Billing Efficiency (%)74.48%77.33%79.40%80.65% Metering Efficiency (%)28.61%30.06%31.41%34.32% Energy Realised (MU) AT& C Loss (%)27.54%35.99%26.23%22.91% DT failure rate (%) 12.55%13.29% Feeder Trippings (Nos.) Reliability Index(%) 99.98%99.99%
END