MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.

Slides:



Advertisements
Similar presentations
New Reactors: NRC Plans, Process, and Progress David B. Matthews Director Division of New Reactor Licensing February 28, 2008.
Advertisements

New Nuclear Plants in the United States
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
New Reactor Activities Joseph Colaccino, Senior Project Manager Division of New Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory.
Slide 1 Doc.ppt 0144 NEW NUCLEAR POWER Ed Cummins Westinghouse Electric Company June 29, 2006.
PERMITTING CHALLENGES FOR THE NEW GENERATION OF NUCLEAR POWER PLANTS Ping Wan Bechtel Power Corporation Ninth Nuclear Utility Meteorological Data Users.
E&CS Overview & Major Construction Update Eddie Clayton.
1 The Challenges Facing New Generation Capacity An overview and discussion Paolo Gaio Westinghouse International NPP.
NRC Status and Plans for New and Advanced Reactors Michael A. Norato, PhD Chief, Component Integrity, Performance & Testing Branch 2 (BWRs) Division of.
School for drafting regulations Nuclear Safety Combined licensing approach Vienna, 2-7 December 2012 Tea Bilic Zabric.
Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.
New Reactors Bill Borchardt Director, Office of New Reactors.
NUCLEAR ENERGY What is it? David J. Diamond Energy Sciences & Technology Department February 2009.
1 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 David Cliff UK Licensing Manager AP1000 Westinghouse.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s.
Westinghouse Non-Proprietary Class 3© 2013 Westinghouse Electric Company LLC. All Rights Reserved. 1 October 2013 Westinghouse Overview and AP1000 ® Plant.
Ralph L. Andersen, CHP Director – Health Physics & LLRW Nuclear Energy Institute May 15, 2008 The Resurgence of Nuclear Power Health Physics Society Baltimore-Washington.
Nuclear Energy in 2013: Status and Outlook Briefing for Czech Technical University Scott Peterson, Senior Vice President Nuclear Energy Institute March.
Nuclear Energy: Safety, Radiological Protection and Physical Security in the post-carbon era (Energía Nuclear: Seguridad, Protección Radiológica y Seguridad.
Rated # 1 “BEST PLACES TO WORK IN THE FEDERAL GOVERNMENT” Dale A. Powers US Nuclear Regulatory Commission.
WALL STREET UTILITY GROUP The Energy Policy Act of 2005: The Implications for Nuclear Energy 22 September 2005.
Overview of Conventional 2-loop PWR Simulator. PCTRAN Dr
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
California Energy Commission James Madigan April 27, 2015.
Westinghouse Operational Experience and Prospects for New Build
Calvert Cliffs Unit 3 Status Summary for PPRAC Meeting 26 August 2008.
Comanche Peak Nuclear Power Plant Existing and Proposed Units American Society of Civil Engineers Dallas Chapter November 1, 2010.
Nuclear Power Plant New Build Activity: A Market Overview
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
Michael deLamare Requirements Management Program Functions R-9.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Sixth Northwest Conservation & Electric Power Plan Resource Development Parameters Jeff King Northwest Power and Conservation Council Generating Resources.
The Resurgence of the Nuclear Industry Angie Howard Nuclear Energy Institute April 23, 2009.
Nuclear Industry QA Initiatives and Opportunities ASQ Southern Jersey Section October 22, 2008 Dinner Meeting October 22, 2008 Dinner Meeting Tom Mudge.
Plant Parameter Envelope for Early Site Permits
Reiner W. Kuhr Executive Consultant University of Calgary November 2, 2006 PBMR Oil Sands Applications.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
New Reactor Construction Inspection
U.S. Energy Policy Legislation Thelma L. Wiggins Manager, Media Relations Nuclear Energy Institute ENS PIME 2004 Barcelona, Spain Feb. 9, 2004.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
Vogtle Nuclear Plant Update Moderator: Honorable Greg White, Michigan Panelists: Honorable Lauren “Bubba” McDonald, Georgia Public Service Commission Buzz.
PP571.1 The Prospects for New Nuclear Construction Eugene S. Grecheck Vice President Nuclear Support Services ANS Virginia Section Meeting March 16, 2004.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
Georgia Public Service Commission Regulatory Update Presentation For: Southeastern Energy Society Luncheon September 18, 2006 Alston & Bird LLP Law Offices.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
2007 CMBG Conference Sam Melton Progress Energy June 19, 2007 Charleston, SC Configuration Management Principles And Practices for New Nuclear Plants.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
Nuclear Energy 2016: Status and Outlook
Nuclear Energy in 2013: Status and Outlook Paul Genoa Senior Director, Policy Development Nuclear Energy Institute Florida Senate Committee on Communications,
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
SNC/SCANA – New Build Configuration Management
Nuclear Power Update for The Society of American Military Engineers
Plant Vogtle Units 3 and 4 Alex Thirkell.
Dr. Nils J. Diaz 28th Annual Bonbright Center
Adding Nuclear Power to the Grid
Plant Parameter Envelope for Early Site Permits
Anna Bradford, Deputy Director Division of New Reactor Licensing
NuScale Micro-Reactor Technology
Presentation transcript:

MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010

MPMP Power Supply 2 Nuclear Power Facilities- Safety is Key 45 inch steel-reinforced concrete 1/4 inch steel liner 36 inch concrete shielding 8 inch steel reactor vessel nuclear fuel assemblies Multiple Layers of Safety

MPMP Power Supply 3 Industry Activities Industry Activities l Licensing risk is a key issue for the industry to move forward with actual plant orders l Previously separate construction and operating licenses were required – No certainty provided by this process – Many physical changes were required prior to receipt of operating licenses – Costs increased due to schedule delays and rework required l Industry has adopted new process which results in combined construction and operating license

MPMP Power Supply 4 New Licensing Process provides regulatory certainty Licensing decisions finalized before major construction begins Inspections to verify construction Limited work may be authorized before license is issued Pre-Construction Construction Verification Early Site Permit Standard Design Certification Combined License Review, Hearing, and Decision Verification of Regulations with ITAAC Reactor Operation Decision Optional Pre-Application Review New page 23

MPMP Power Supply 5 Industry Activities Industry Activities l Industry has adopted several standard designs l Westinghouse AP 1000 (design certified 1/2006) l General Electric ESBWR l General Electric ABWR (design certified 5/1997) l Areva US EPR l Mitsubishi US APWR

MPMP Power Supply 6 New Technology - Advanced Reactor Characteristics lSafety –Use of passive safety systems –Gravity flow and natural circulation designs for cooling lDesign –Reduced number of components and bulk commodities –Eliminate pumps and valves previously needed –Use digital controls and fiber optic cables lProcurement –Standardization of components based on NRC approved design

MPMP Power Supply 7 Fewer Components Reduce Plant Costs Confidential and Proprietary 70% Less Cable 45% Less Seismic Building Volume 80% Less Pipe 35% Fewer Pumps 50% Fewer Valves

MPMP Power Supply 8 New Technology - Advanced Reactor Characteristics lConstruction –Extensive use of modular construction improves quality and reduces on- site construction requirements –Digital controls reduce size and complexity of systems –Shorter construction schedule lOperation and Maintenance – Use of proven systems and components – Man-machine interface advancements – Fewer systems to maintain and test reduces staff

MPMP Power Supply 9 Smaller and Simpler than Current Plants 74147A Sizewell BAP1000

MPMP Power Supply 10 l What makes Nuclear attractive? – Fuel volatility, both gas and coal, is a major concern – Fuel transport and supplies are showing signs of capacity constraints – Environmental compliance measures are increasing cost of coal base load resources – Regulation of carbon dioxide (CO 2 ) emissions is gaining traction – New licensing process expected to allow cost control – New design units are smaller and less costly to construct Economics

MPMP Power Supply 11 Costs of Competing Fuels

MPMP Power Supply 12 Plant Vogtle Reactor Containment Bldg. Cooling Towers Turbine Bldg. Electrical Switchyard

MPMP Power Supply 13 Plant Vogtle Expansion

MPMP Power Supply 14 Schedule Overview S/U ConstructionLWA ActivitiesPre-Construction NRC COL Review COLA Preparation EPC Contract Signed PSC Certification Process (complete) ESP PreparationESP and LWA Review ESP and LWA Received PSC Certification received COL Received Fall 2011 COD U COLA Submitted Commercial operation date is April 2016 & 2017 for Units 3&4 As of 6/30/2010

MPMP Power Supply 15 Permit and License Activities l Early Site Permit Submitted to NRC in 2006 Issued by NRC August 2009 First to include Limited Work Authority l Combined License Application COL Application Filed in March 2008 Application Under Review at NRC Anticipate License in Fall 2011 Vogtle Named Reference Plant

MPMP Power Supply PSC Certification LWACOL Pre Certification Pre Construction LWA COL Surveying Subsurface Exploration Environmental Protection Site-clearing Demolition & Relocation of existing facilities Construction of training & storage buildings Excavation of the nuclear island Back Fill Waterproof Membrane Rebar Basemat Concrete Safety Related Construction Onsite Workers Vogtle 3 & 4 Construction Phases

MPMP Power Supply 17 Construction Activities – Module Assembly Building

MPMP Power Supply 18 Construction Activities Steam Generator Head Circulating Water Pipe Reactor Vessel Head

MPMP Power Supply 19 Construction Activities – Foundation Excavation and Backfill

MPMP Power Supply 20 Chinese Construction AP1000 Sanmen U1 Nuclear Island

MPMP Power Supply 21 Questions