Andy Blue Glasgow Update. Andy Blue WP3 Meeting UV Glue In November, I sent UV Glue, hybrid panel + jig to Anglo Production Process LTD –UK supplier of.

Slides:



Advertisements
Similar presentations
What determines impedance ?
Advertisements

Electrical and thermal testing at Glasgow and Liverpool.
BeginningNext SlideBack End Program AVADAL 1 of 21 SK-1 Roller Apron Segment Overview.
ATLAS Module building at Glasgow
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
WP6: Quality Assurance and Reliability Testing A. Honma, CERN PH/DT 30 April 2010DT Steering Board Meeting, A. Honma1  Mandate  Manpower and Resources.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
Welcome to. 2 Information Rich Event On around 1330 hours, facility workers smelled smoke Stopped work and called the Emergency Service Dispatch.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
Experts in Chem-Feed and Water Treatment An Overview of Possibilities Dulcometer Disinfection Controller ( DDC )
Precision Dispensing Purdue takes advantage of the gantry’s precision by fixing a 150 micron inner diameter dispensing tip to an EFD dispensing pressure.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: Calibration of Johansson measuring machine Cooling components Half-stave.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
MSD II Week 5 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Manchester Qualification M-O-048. Mechanical dummy. Check that tuning of alignment parameters had correct sign and adjustment of transfer chucks Z was.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Sensor Testing Phil Turner. LHCb PRR - P. Turner Contents Reception Inspection Metrology Mounting Electrical tests Storage Changes since EDR Results Throughput.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Gluing trials continuing: Loctite is favourite (for Dispensemaster) Bonding: exercising the machine; practising in laying down patterns (Simon and.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
Andy Blue Glasgow Update. Andy Blue WP3 Strip Meeting Environmental Chamber Installed into cleanroom –Working on controlling scans via Ethernet connection.
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
ATLAS pixel module assembly flow
→ need to guide UV light into gap; also beware temp effects
Glue curing studies (contd)
Status Report on Bonding at Catania
Ladder Assembly All tools and jigs produced Glue dispensing works
ITK Strip Module Meeting; 12st October 2015
Gluing jigs for Demonstrator
HR-HV CMOS activities and plans at Glasgow
Phase 2 Outer Tracker Module analysis
Database requirements from ITk-Strips for DAQ loads
Far Detector Activities Late 2017 – Early 2018
ATLAS Upgrade Module Bonding Trials Using Glass Asics
LHCb Upgrade Chris Parkes Stefano de Capua May 17, 2013
What determines impedance ?
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Module Testing Status Week of 3/14-3/18.
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Enrico Scarlini INFN and University of Florence CERN 25-Oct-2005
After service guide for changing PCB
Presentation transcript:

Andy Blue Glasgow Update

Andy Blue WP3 Meeting UV Glue In November, I sent UV Glue, hybrid panel + jig to Anglo Production Process LTD –UK supplier of UV Glue valve for machine we have in Glasgow Wanted to see if machine we have could perform UV glue work with proposed new UV Valve Received results last week –Damage to glue machine delayed trials –They said UV Glue had cured Strange as glue was covered in tin foil and had been since arrival from DESY Used Humiseal UV Cure Acrylic Gel

Andy Blue WP3 Meeting UV Glue Platform ModelX1022 Axiom ValveEFD741 Dispense Station HeatN/A Parameters ValveEFD741 MaterialHumiseal Acrylic Gel NozzlePurple EFD Nozzle Nozzle TemperatureAmbient Fluid Pressure10.0 psi Valve PressureN/A Settling time0 Down Speed50mm/sec Down Acceleration7620 mm/sec2 Dispense Gap0.4mm Dwell0.003 Retract Speed50mm/sec Retract Acceleration7620mm/sec2 Retract Distance5.0mm

Andy Blue WP3 Meeting Questions How comparable is this glue to the ones we would use? Cost –New Valve + software upgrade = £4.4k –Craig aka Pixels willing to pay half of this cost

Andy Blue WP3 Meeting Shopping list Pt 2 I really don’t have any type of visual inspection system for strip gluing/wire bond checking etc. –High powered microscope –BATY system Was looking at Mikkrolite II from Vision Systems Guide price for the console version is £3,633 PC version (with pc) is approximately £5,400

Andy Blue WP3 Meeting Parts & Components Is there possibility we could get parts to trial wire bonding/gluing in the near future? –Quite keen to get as much experience as early as possible –Any use in wire bonding ABC130s to new hybrid panels? –Is there a plan for dummy modules for sensor wire bonding trials?