Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Moderator: Paul Sutto, PE Joint Base San Antonio Small Business.

Slides:



Advertisements
Similar presentations
DTC Meeting, 28 Feb DESP II USAF DESP II Overview of Design Engineering Support Program (DESP) II Hal Burnside DESP II Program Manager Director,
Advertisements

AFCEC Execution & AFIMSC Future
I n t e g r i t y - S e r v i c e - E x c e l l e n c e AF Facility Energy Perspective 1 David J. Bek, P.E. Energy Director AFCEC/CN.
Cave Tonitrum Fly, Fight, & Win Mary L. Peetz Small Business Program Specialist LUKE AIR FORCE BASE.
One Team, One Mission: Your Success The Premier Joint Base in the Department of Defense! Joint Base San Antonio Civil Engineering Opportunities, Challenges.
Pwc V6 Mr Chris Sharp 502 ABW Joint Base San Antonio 502d Air Base Wing.
Successful SB Contracting: Engineering Service - CMTA Presented by: Tony Hans, PE, RCDD, LEED AP.
Milan Srskic, CCM, FHFI Acting Chief, Project Management Service Office of Construction and Facilities Management.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers (USACE) South Pacific Albuquerque (SPA) Daniel Curado Small Business Deputy Albuquerque.
2011 ADC WINTER FORUM | PAGE 1 Joint Base San Antonio Sustainable Energy Innovation Center Sid Saunders Defense Transformation Institute February 15, 2011.
Significant Work. Extraordinary People. SRA. Property Management Solutions for Unique Identification, AIT, and the Supply Chain March 30, 2011 Susan Pearson,
Ms Renaye Tyce OC-ALC/SB (405) I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY.
Civil Engineer Program Outlook
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 “To BRAC or Not to BRAC” What happens if there is not a BRAC? ADC.
US Army Corps of Engineers Our Army at War – Relevant and Ready Fort Worth District  22 October Fort Worth District Military Construction Program.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers SAME DC Post Briefing SAME DC Post Briefing Mohan Singh, P.E. 25 March 2010.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Air Force Center for Engineering and the Environment I n t e g r i t y - S e r v i c e - E x c e l l e n c e Col Scott Hartford, P.E. Chief, Capital Investment.
1 State of Good Repair Research Vincent Valdes Associate Administrator for Research, Demonstration, and Innovation July 9, 2009.
INTRODUCTION Mr. Benjamin W. Lawless NGB/A7O Chief, Operations Division Installations and Mission Support Directorate.
Tulsa District – Building Strong! Overview and Opportunities U.S. Army Corps of Engineers Tulsa District April 29, 2009.
UNCLASSIFIED Mission and Installation Contracting Command FOUO Cathy Bella PARC February 2012 Contracts or Agreements with Municipalities.
BUILDING STRONG ® SAME San Antonio Post Small Business Conference John Roberts Deputy District Engineer for Project Management Tulsa District July 26,
AIRFIELD ELECTRICAL IMPROVEMENT PROJECTS Innovations in a Low Bid Environment John E. Joyner III, P.E. Matthew W. Kundrot, P.E. 3 October 2012 MILITARY.
Pwc Joint Base San Antonio 502d Air Base Wing Mr. Benjamin Stohr Ch. Installation Support Section HQ AETC/FM.
US Army Corps of Engineers BUILDING STRONG ® CONSTRUCTION CONTRACTING Presenter Name John Moore Chief Contracting Division Savannah District 20 May 2010.
502d Contracting Squadron Small Business Specialist
I n t e g r i t y - S e r v i c e - E x c e l l e n c e U.S. Air Force Civil Engineer Center Society of American Military Engineers San Antonio Post SMALL.
Joint Base San Antonio 502d Air Base Wing 7 Nov 12 JBSA Construction Update to MTTF Mr. David Dentino Director 802d Civil Engineer Squadron.
78TH AIR BASE WING The CE Planning Office and Installation Development Plan 1 By: Terry Landreth, PE CE Planning Office Supervisor Aug 2015 " The Installation.
Private Sewer Transfer David Walter Managing Director, Dyno Rod Drainage and Sewerage Service provision in the future.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 AFCEE BAA Program – Funding Opportunities Adria Bodour, Ph.D. Technology.
11th Wing The Chief’s Own! Lt Col Rockie Wilson, PE Commander, 11th Civil Engineer Squadron SMART Procurement Conference: Joint Base Andrews Infrastructure.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Colonel Tim.
Seattle District MILITARY CONSTRUCTION PROGRAM
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
2004 DoD Standardization Conference Product/Process Certification Panel Bldg. 33 Washington Navy Yard Federal Bldg. Oakland, CAU.S. Courthouse Las Vegas,
82d Contracting Squadron Sheppard Air Force Base August 2015
Information Technology Services Strategic Directions Approach and Proposal “Charting Our Course”
U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville.
Succeeding in the Federal Market Strategies to be Competitive SAME and SMPS Orange County Joint Breakfast Event 27 August 2009 Presented by: Massie Hatch,
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
1 Contracting with NAVFAC Washington Allison Evans Deputy for Small Business 30 November 2011.
Energy Huntsville Opportunity Report and Government Collaboration April 2016.
PORT OF TACOMA. Request authorization for the Executive Director to Award Purchase Orders for the purchase of hardware and software for the Blair-Hylebos.
Efficient Renovation, Repair, and Minor New Construction LEAN - Job Order Contracting Best Management Practices Moderator: Peter Cholakis, CJE Board Member.
Louisville District Overview
AIM HIGH  FLY  FIGHT  WIN B ASE C IVIL E NGINEER O UTLOOK Amir Mott, R.A., Chief, Project Execution Wright-Patterson AFB, OH (937)
Recruit, Train, and Educate Airmen to Deliver Airpower for America ENJJPT Steering Committee Briefing Facility Projects Mr. Christopher Coppala Air Education.
2016 SAME Jacksonville Post Industry Day 8 Dec 2016
Energy Huntsville Opportunity Report August 2016
Base Maintenance Contract (BMC) Industry Day Participants
2016 SAME Small Business Conference - Atlanta
January 18, 2017 City of San Diego
USACE SAVANNAH SAME PRESENTATION
USACE SAVANNAH SAME PRESENTATION
USACE-Fort Worth District
Air Force Construction Management
Presented by: Sandra Easter
Small Business Outreach
“building and preserving Alaska’s Future” Program Highlights
Dr. Vida G. Wright, P.E., F.SAME Southwest Region Vice President
Joint Base Langley – Eustis Overview
Louisville District IDIQ Opportunities
Mirko Rakigjija, PE (256) Dr. Michael E. Stovall, PE (256)
75TH Civil Engineer Group
Design and Construction Cost Engineering
USACE infrastructure team update
377th Mission Support Group/ Contracting Division Construction Branch
Society of Military Engineers Monthly Meeting, October 11, 2018
Presentation transcript:

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Moderator: Paul Sutto, PE Joint Base San Antonio Small Business Opportunities

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Presenter: Michael Luhrman, PE 502 CES Small Business Opportunities

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Presenter: Zakary Payne, PE 902 CES Small Business Opportunities

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Active Workload Current FY11 Program Proposed FY12 Program Contact Information Joint Base San Antonio – Randolph AFB

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Active Workload 74 projects scheduled for completion in FY11 – Total Cost $83.1M 35 8(a) Direct Award Projects - $35.8M 13 SABER Projects - $2.1M 8 IDIQ Projects (roof & fence) - $4.8M 6 MACC Projects - $17.4M Joint Base San Antonio – Randolph AFB

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Current FY11 Program 64 Projects (including EOY) totaling $70.8M 14 8(a) Direct Award Projects - $24.1M 15 SABER Projects - $2.7M 7 Competitive SB Set Aside - $8.8M 6 IDIQ Projects (roof) - $4.8M 4 MACC Projects - $7.8M Joint Base San Antonio – Randolph AFB

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Planned FY12 Program MACC - $75M Ceiling - Anticipate FY12 Q1 Award Paving IDIQ - $50M Ceiling - Anticipate FY12 Q1 Award Paint IDIQ - $20M Ceiling - Anticipate FY12 Q1 Award Roof IDIQ - Ceiling TBD - Anticipate FY12 Q2 Award Floor IDIQ - Ceiling TBD - Anticipate FY12 Q3 Award SABER - Ceiling TBD - Anticipate FY12 Q3 Award Joint Base San Antonio – Randolph AFB

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Contact Information Jose Farias 902 CONS/SBS (210) Zakary Payne, PE 902 CES/CEP (210) Joint Base San Antonio – Randolph AFB

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Presenter: John Enyeart, PE Roles Responsibilities and Relationships 802 CES Small Business Opportunities

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Presenter: Zakary Payne, PE 902 CES Small Business Opportunities

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Agenda Marketing basics for AF Customers Timing of project lists Lackland & JBSA Opportunities Marketing summary by capabilities

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Roles, Responsibilities, and Relationships End User Customer Commander Marketing Portal to Securing Contracts MAJCOM Contractors Arch / Eng Construction Operations Maintenance Environmental Service Agents Base Contracting Squadron Major Command (i.e. AETC) US Army Corps of Engineers Naval Facilities Eng. Command Air Force Center for Engineering and the Environment Government Service Agency

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Roles, Responsibilities, and Relationships End User Program Manager Mechanic Craftsman Custodian Facility Manager Technician Benefactor

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Roles, Responsibilities, and Relationships Customer MAJCOM CE (or A7C) Staff Squadron Commanders Flight Chiefs (CEP, CEA) Section Chiefs (CEPM, CEPD, CEAO, CEAN) Program/Project Managers (Infrastructure, Energy) Decision Makers – Execution Authority

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Roles, Responsibilities, and Relationships Service Agents Local: Base Contracting Squadron Regional: US Army Corps of Engineers Small Business Administration Major Command (MAJCOM) National/World wide: Air Force Center for Engineering and the Environment General Services Administration Your portal to potential USAF contracts!

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Roles, Responsibilities, and Relationships End User Customer Commander Marketing Portal to Securing Contracts MAJCOM Contractors Arch / Eng Construction Operations Maintenance Environmental Service Agents Base Contracting Squadron Major Command (i.e. AETC) US Army Corps of Engineers Naval Facilities Eng. Command Air Force Center for Engineering and the Environment Government Service Agency

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future O&M Execution

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Workload Timing at Lackland AFB Annual workload list comprised of four lists Lists created at certain times yearly through Facility Board FY11 CEP Workload FY12 Projects MILCON Projects Sustainment Restoration and Modernization (SRM ) (Focus Funds, Customer Funds, etc) End of Year Quick Executes

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Lackland Opportunities FY11/12 Workload SABER (A lot of smaller dollar, lower complexity) IDIQ (paving, painting, roofing, fencing) 8(a) (DB); HubZone (IFB) AFCEE or AFCESA or USACE AE Services (plans, studies, design, Title II) Hopefully through base-level AE IDIQ AFCEE Decentralized Ordering

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Lackland Opportunities FY11/12 Workload -Type of Projects anticipated Electrical Distribution Repair/Bury Pavement Repairs - Airfield: Runway/Apron cracks - Mill/repair/overlay streets basewide Office/Classroom renovations Roof repairs/replacements Storm water drainage repairs Contracts: Pavements, SABER, fence, A-E

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future FY10/11 Project Load-Lackland NOTE: Ongoing projects from FY09 and before are not included in the totals above.

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future CEP – PLANNING, PROJECTS, INFRASTRUCTURE A/E Services Project Programming (DD 1391) GEOBASE Construction Management (Title II) LEED Certification/Sustainability Design/Build Water/Wastewater (Distribution) Systems Backflow Prevention/Cross-Connection Survey/Testing (5-year requirement) Power System Planning, Rehab, Extension Design/Build for Infrastructure Marketing By Flight

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future CEA – ASSET MANAGEMENT; ALL ENVIRONMENTAL SPCC Plans and ODS Plans Compliance and P2 Environmental Management Systems O&M/LTM Risk Assessment Landfill and Cap Design/Construction Treatability/Pilot/Bench Studies UXO/Remote Sensing/Range Management Base Comprehensive Planning Services Marketing By Flight

Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Wrap-Up Market to base – See the list, offer solutions Talk to the right people – Make appointments, don’t waste people’s time, offer solutions Make it easy – We’re extremely busy, offer solutions Be competitive…win a contract (i.e. SABER, AE IDIQ) Offer solutions! Be a teammate! Know / Learn the “AF Way” On Time, On Budget, Good Quality Delivery