1 ACG Pipelay Barge “Israfil Guseynov” Fatal Accident Summary 24 th April 2005.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Training Package Session 1- Overview Version:
Height Aware Campaign. Background Work at height Who the campaign is for What will happen Work at Height Regulations 2005.
Work at Height Regulations 2005
Description On the 12 th July 2011, a truck carrying a container was inspected at the SBS Gantry, prior to being sent to the Quayside. A 4ft long, 4x2.
Gulf Petrochemical Industries Co. Turnaround Contractors – Ensuring the safety of our Manpower GPIC Bader Al-Mansoori Planning Superintendent.
Where are we now? D.Napier / W.Crawford Dropped Object Progress.
Job Loss Analysis Overview
Drill ICAM-preliminary information For information purposes only. Managers & Supervisors should evaluate this information to determine if it can be applied.
Safety and Health Management Program
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
Compliance - Work Permit CAKE Session 17. Purpose of the Work permit system: The Purpose of the system is to: - Prevent undesired incidents and mitigate.
RCAF Contractor Training T First Tool In LPS.
1 The task: Salvaging Operation. Included cutting and removal of equipment from site WELDER FATALITY August 2003.
Human factors Training & Competence CaspianExplorer.com.
1. 2 Safety work-stoppage PDO & its contractors have suffered THREE high potential incidents involving cold cutting in the last TWO months.
Obligations of the Company
1.2.1 > ISPS Module ISPS Code Responsibilities
UK’s CDM Regulations 2007 and its Applications in Singapore
Workforce Engagement Survey Engaging the workforce in simple and effective action planning.
Risk Assessment – An Essential Standard
Copyright © 2011 Resource RTO 1 Copyright © 2011 Resources RTO 1 When things go wrong! What are the issues buried within the training systems?
Aviation Maintenance Risk Management Checklist Maintainer U.S. Navy Safety criticality has been identified 5 Aviation Maintenance Risk Management.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Overview Version: September 07.
December 5, 2014 Task Training For ACNM. Always Remember your PPE When Task Training.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Contact with a Stored Energy Source 1 Feb 2012 Summary of events Contributing factors Moving forward, What did we learn and do.
BSP/BLNG 25th August 2004 BSRC Ball room
Hot Work Procedure and Permit
Risk Management and PINs Why risk management is so important Why HSRs should be “qualified” to issue PINs 1 Training & Safety Consultants.
BG Group Communication Pack Learning the lessons ELNG Construction Site Train 2, Idku Egypt - Fatal Incident on 21st March 2005.
Elements of Effective Behavior Based Safety Programs
Hazards Identification and Risk Assessment
MNM Fatal Falling Material Accident Falling Material Accident April 4, 2013 (Arizona) April 4, 2013 (Arizona) Copper Operation Copper Operation.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
MNM Fatal Other (Drowning) Other (Drowning) December 10, 2013 (Kentucky) December 10, 2013 (Kentucky) Sand & Gravel Mine Sand & Gravel Mine Dredge.
Responsible Care® Health & Safety Task Force – 06 H&S.
A guide to... Safe Systems of Work.
Survival Skills for Supervisors Safety Leadership and Building a Safe Community Presenter: Mark Linsenbigler Environmental Health and Safety
Loading and Unloading of Drilling Rigs & Compressors Safe Transportation of Drilling Rigs and Compressors Drilling and Blasting Toolbox Talk : 02 This.
GUPCO Kamose Fatality Incident Toolbox Talk Lessons pack Presenter’s Name Title Department Prepared By Dave Goodwill for Dave Blevins.
HSE Plan meeting - November – Health, Safety & Environmental Plan 2015.
Safe Systems of Work. Legislation w HSWA Section 2 (2) (a): Provide and maintain plant and systems of work that are, so far as is reasonably practicable,
Roles and Responsibilities Explain the roles and responsibilities for health and safety of key personnel in selected workplace.
MNM Fatal Falling Material Accident Falling Material Accident April 21, 2009 (Tennessee) April 21, 2009 (Tennessee) Sand & Gravel Operation Sand.
SOLGM Wanaka Retreat Health and Safety at Work Act 2015 Ready? 4 February 2016 Samantha Turner Partner DDI: Mob:
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
BSP/Contractor fatality Incident Investigation Slide: 1 Time Out For Safety BSP/BLNG 25 th August 2004 BSRC Ball room.
OHSAS Occupational health and safety management system.
MNM Fatal Slip or Fall of Person Slip or Fall of Person August 21, 2004 (Oregon) August 21, 2004 (Oregon) Sand & Gravel Operation Sand & Gravel.
Cross Industry E-Reps Forum Increasing Environmental Awareness and the role of the E-Rep 21 November 2012.
1 Identification & Elimination of High Potentials Lessons Learned - Discussion.
Focus on What's Important
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
HSE rules & regulations
Simplification – What does it mean?
Injury: Fall from height
GHANA INSTITUTE OF MANAGEMENT AND PUBLIC ADMINISTRATION ( GIMPA)
What is Safety Stand Down?
Life Saving Rules-Do it Right!
Safe Systems of Work.
STFC Safety, Health and Environment (SHE) Codes
Safety is part of our culture at Halliburton
What is Safety Stand Down?
LIFTING & HOISTING ENGAGEMENT PACK
Desert Line Project Fatal Incident
Always intervene an unsafe act
K9 Operations Leader (K9OL) Overview
In the line of fire Disclaimer: this safety moment is designed to prevent similar incidents occurring. All guidance herein is provided in good faith and.
Presentation transcript:

1 ACG Pipelay Barge “Israfil Guseynov” Fatal Accident Summary 24 th April 2005

April 24 th 2005 ACG Pipelay Barge “Israfil Guseynov” Fatality 2 Key Messages Nature of the incident Ugurlu Gasanov (40 yrs old, Azeri, married with 2 children) fell through grating that he was working on and into the sea at 01:30hrs. Despite good weather at the time, rescue attempts were unsuccessful and he has not been found. Work being undertaken: Safety improvement work to remove grating, install a beam to improve mechanical support, and reinstall the grating on the bow deck extension of the MCCI (McDermott) Pipelay Barge (PLB). What went wrong: Inadequate work control processes (job planning, permits, task risk assessments, toolbox talks) by the barge management, supervision and the work crew allowed the job to be undertaken, without a full understanding of the hazards and without proper safety precautions. Key forward actions: Improve the work control processes and accountabilities, and implement an audit process to ensure that work is controlled as planned. Area where Ugurlu Gasanov was working Tack welds being cut out New support to be placed here Existing support in place Port Starboard

April 24 th 2005 ACG Pipelay Barge “Israfil Guseynov” Fatality 3 What Happened? What was the job: Safety improvement work to remove grating, install a beam to improve mechanical support, and reinstall the grating. Pre Incident: The pipelay barge had just laid down pipe in advance of a storm, and workers were reallocated onto storm fastening of deck equipment and maintenance jobs. The grating safety improvement job was not included on any planned activity list and was not part of the planned activity for that night and was not discussed at the start of shift toolbox talk. Events: The barge foreman and welding foreman discussed the workscope and this resulted in the welding foreman assembling a work team. No permit was issued, and no task risk assessment or job specific toolbox talk undertaken. Welder leaderman cut around the grating and together with the welder were to use hooks to pick up the grating from each side and remove. Near the end of the job, the welder was reassigned to a different job and was replaced by Ugurlu, an assistant welder; by this time the welder leaderman had already cut most of the welds around the grating. Within moments of arriving in position, Ugurlu stepped fully onto the grating with only two welds remaining. The grating gave way, and Ugurlu with the grating fell into the sea. Despite a fast ‘man overboard’ response and subsequent search activity Ugurlu was not recovered Air Tugger Hydraulic rollers Uprights Pipework Grating to be removed Walkway grating Welding Foreman Two remaining tack welds in green Location of support to be inserted PORT STARBOARD 900mm Welder Leaderman Welder Ugurlu

April 24 th 2005 ACG Pipelay Barge “Israfil Guseynov” Fatality 4 What Went Wrong? Work Planning & Control Processes: Work planning processes were inadequate:  Jobs to be completed were not identified within a central list, collectively reviewed by the barge management and supervision regarding the requirement for a permit or a task risk assessment, or communicated as a whole to the crew. Work control processes were inadequate:  Although four other jobs were satisfactorily permitted that night, the grating removal job did not have a permit, task risk assessment or toolbox talk  When the welder was replaced by Ugurlu there should have been an effective handover but there was not  Barge leadership were unaware of the totality of jobs that were being performed at any time Leadership & Supervision: Barge management and supervision did not enforce the work control processes The site ‘BP Rep’ was unclear of his safety responsibilities and did not enforce the work control processes

April 24 th 2005 ACG Pipelay Barge “Israfil Guseynov” Fatality 5 What Actions Are Needed? AzBU Work Planning & Control: Improve work planning & control on the barge:  Implement a revised job planning process that includes: compilation of a job list, a daily planning meeting to review jobs to be performed that day and an active discussion of each job regarding the requirement of a permit or task risk assessment  Develop and implement an audit process to ensure that jobs are executed with the appropriate permit or task risk assessment and a toolbox talk  Establish a requirement for the toolbox talk to be repeated if there is a change in personnel performing the task Across the BU:  Undertake the required verification to ensure that all locations in the BU have adequate work planning and control processes being practised  Roll out the updated version of the ‘Supervisor Safety Leadership’ programme Leadership & Supervision: Establish clear accountabilities for barge leadership, supervision and work crews with regard to work planning and work control Re-enforce the safety expectations and accountabilities of the ‘BP Rep’ Enhance the focus of management visits, particularly at remote locations across the BU, and strive to include all aspects of the operation

April 24 th 2005 ACG Pipelay Barge “Israfil Guseynov” Fatality 6 Messages for Other E&P BUs Although your site may have a good Permit-to-Work system, are you confident that all jobs undertaken are permitted, if appropriate, or have a task risk assessment? In particular, does the Permit-to-Work system cover non routine tasks as well as routine tasks? Are your supervisors clear on their roles and responsibilities regarding Permit-to-Work, task risk assessments and toolbox talks? Are they fulfilling their roles and responsibilities? Is the BP Rep on your contractor managed work site fully aware of his safety roles and responsibilities and competent to fulfill them? Do BP management get out to all of your remote worksites to conduct ASAs at sufficient frequency and with sufficient focus upon non core activities? Is the interaction on site broader than ASAs alone – e.g. does it include engagement of staff in work meetings and townhalls?

April 24 th 2005 ACG Pipelay Barge “Israfil Guseynov” Fatality 7 Backup: Further Pictures of the PLB