Airstrip (Total Disturbance 17.9 ha) and Borrow Pit (Total Disturbance 5.2 ha)

Slides:



Advertisements
Similar presentations
Lowermost Pajaro left-bank bench vegetation just downstream from Thurwatcher Bridge.
Advertisements

N Test Pit with no pottery of this date Disturbed levels Test Pit with 1 sherd 4g or less Test Pit with 1 sherd 5g or more Test Pit with 2-4 sherds Test.
Designing least erodible canal David Eichinger, Ryan Habben, Brad Harriger and Venkatesh Merwade 1.
CLIMATES WITH RAIN ALL YEAR S3 CLIMATIC REGIONS. In this topic you will learn The location of equatorial climate areas The characteristics of their climate.
Mine Construction. Start of Barge Landing area. A trailer, excavator and generator. Early Barge Landing June 2007 with one trailer to start construction.
1 Beaver Lake Dam. 2 Coffer Dam (20’ high) 3 Dam site before construction Coffer dam.
Identifying and Evaluating Levee Improvement Alternatives – The City of West Sacramento Michael J. Vecchio, P.E. Watershed Planning and Design Sacramento,
Jasmit Bains and Jamie Laukaitis.  East Midlands - centre of the ‘Industrial revolution’  FACT : PRIDE - P artnership to R egenerate through I nnovative.
1 Armour Ranch Road Bridge Emergency Repairs SB County Project Number 01STRM R015 Storm Damage caused during March 5 th 2001 storm.
Digley Reservoir, Holmbridge
Potlach Feeder #2 CR 65 Potlach Feeder #1 Dark Potlach site Non-permitted and improper placement of fill material in the two Potlach cold-water.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
Levitation? Dr. French, is this levitation?
HOW BIG IS THAT HOLE? USING ARCGIS TO CALCULATE THE VOLUME OF SEDIMENT NEEDED TO MITIGATE EROSION OF AN ARCHAEOLOGICAL SITE SEAN STCHERBININE – RESOURCE.
Coastal defence (management) against flooding and erosion.
MINING EQUIPMENT OPERATOR By Ben Miland. Why this job?  Heavy Machinery  Good Income  The Natural Recourses  Someone has to do it.
Conflict over a resource At a local scale. UK conflicts tend to be over building work Second runway in Manchester Newbury bypass New container Terminal.
Tampa Bay Dredged Hole Habitat Assessment Project: Management Recommendations.
Cultural Resources and Structural Rehabilitation Your NRCS Responsibilities.
Types of Sea Defence These forms of sea defence are very expensive.
Central Arkansas Transit Authority Enhancing the Downtown Economy.
Waste Rock Storage Area NAG/HPAG/PAG/Pyrite Pond (Total Disturbance 8.6 ha)
Erosion on the Holderness Coast
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
N Isleham Test pits containing pottery dating to 8 th century BC – mid 1 st century AD Undisturbed levels Test Pit with no pottery of this date.
N 1 sherd 4g or less 1 sherd 5g or more 2-4 sherds 5 sherds or more Disturbed levels 1 sherd 4g or less 1 sherd 5g or more 2-4 sherds 5 sherds or more.
1 sherd 4g or less 1 sherd 5g or more 2-4 sherds 5 sherds or more Disturbed levels 1 sherd 4g or less 1 sherd 5g or more 2-4 sherds 5 sherds or more Undisturbed.
N Writtle Test pits containing pottery dating to 1 st – 5 th century AD 1 sherd 4g or less 1 sherd 5g or more 2-4 sherds 5 sherds or more Disturbed.
Weathering and Erosion
DRAINAGE ROAD BELOW NSL CORRUGATIONS Working in the APY Lands APY right of entry requirements National Police Clearance Permit for entry Notification.
Flood of At Dam Looking East Over Lake. Flood of At Dam Looking Northeast.
Bonnet Carré Spillway Recreation. Bonnet Carré Spillway  Flood Control is priority  Structure has been in operation for a total of 309 days since 1936.
1 1 LTC CHRISTENSEN J44J44 UNCLASUNCLAS Agenda Engineering Orientation Engineering Planning Guidance Engineer Mission Engineering Tasks (Main and Follow-on)
Rainforests. Why are Rainforests so important? They provide a home for many plants and animals. Help stabilize the worlds climate. Protect against.
CLIMATES WITH RAIN ALL YEAR S3 CLIMATIC REGIONS. In this topic you will learn The location of equatorial climate areas The characteristics of their climate.
Environmental Protection Division January 29, 2013 BCC Public Hearing Solid Waste Management Facility Permit Renewal Request Hubbard Construction Company.
Paddy’s Flats Construction laydown area (Total Disturbance 12.8ha)
What would you do? You are a planning officer responsible for choosing the best coastal defences to use for a number of different places. You need to look.
Directions Choose one of the following Cities and Destinations:
Coastal Depositional Landforms
A CASE STUDY OF COASTAL EROSION & MANAGEMENT
Erosion • outline a cause of soil erosion in  NSW due to: – an agricultural process – urbanisation and identify a management strategy that prevents or.
EAG346-Sem II 2014/2015 Lesson 2.
Sinking Fund Millage Proposal
N Toft 2013 Test pit locations 200m
Water Tanker Services In KSA Water Tanker
Water Tanker Services By Trucksi
Container Transport Services Containers Transportation
Truck Transportation Services By Trucksi
SIZEWELL C: STAGE 2 CONSULTATION
Test pits containing pottery dating to BC
Coastal defence (management) against flooding and erosion.
KQ: What are the environmental issues
Building a Strong and Safe Structure
PowerPoint 9: Coastal management strategies
D. Archival Indicators St. Joseph County, IN
D. Archival Indicators St. Joseph County, IN
PIPE LIFTING KIT HAMMER MULETRAX 2300 C
Hard Engineering Case Study
Test pits containing pottery dating to mid 1st – 5th century AD
SEA DEFENSES : hard engineering
What do humans require from their settlements?

Test pits containing pottery dating to mid 1st – mid 5th century AD
Sawtry Test pits containing pottery dating to the mid 1st – mid 5th century AD Test Pit with no pottery of this date Disturbed levels 1 sherd.
Ipswich 2011 Test pits containing pottery dating to 8th century BC – mid 1st century AD Test Pit with no pottery of this date Disturbed levels Test Pit.
ETDL5S Designed for surface application ONLY.
WCR ROAD COMMITTEE REPORT – Skip Porter


Presentation transcript:

Airstrip (Total Disturbance 17.9 ha) and Borrow Pit (Total Disturbance 5.2 ha)

Airstrip Location Shazah Airstrip location (50 m wide by 950 m long raised at least 1 m above flood plain)

Area before airstrip was completed (2007) as a comparison

Shazah Airstrip under construction with material from Borrow Pit – Looking North (~50,000m3 fill extracted from borrow pit for airstrip) Borrow Pit Airstrip

Shazah Airstrip – Under Construction – Looking South. Note construction camp required for the construction of airstrip and further site development Shazah Airstrip under Construction Borrow Pit Construction Camp

heavy rip rap placed from quarried rock along road Heavy Rip Rap Placement

Heavy Rip Rap to protect airstrip against the annual flood Heavy Rip Rap Armour

Airport Fill – Raising the Airstrip Airport Fill against Rip Rap

Airport Fill from Burrow Pit

1 st Lift Complete Construction Camp 1 st Lift Complete

Airstrip upgrade

Completed airstrip

Construction Camp - Tulsequah