CIDC Delhi Role of Quantity Surveyor As Profit Center

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Training & Development Contract Management. Contents Introduction to Contract Management Definition Contract Management Issues Activities Overview Contract.
An Introduction to professional services. The professional services The professional services support businesses of all sizes across the economy, providing.
Funds administration, also referred to as funds control, funds disbursement, funds management, and escrow, is a method that sureties use to offset the.
STRATEGIES TO HELP YOU MEET YOUR TRAINING NEEDS.  Our goal today is to have discussion on what Facilities Management Departments in our region are doing.
Note: Lists provided by the Conference Board of Canada
Preparing for Part 3 (Examination in Professional Practice and
NEC - Engineering and Construction Contract (ECC)
Marcy Mealy Procurement Specialist CDBG Program
Time for a new standard - AS General Conditions of Contract
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Approval System (Workflow) Tender Information System Bid Selection Tool Pre-Qualification Portal Vendor Mgmt System Tendering Software Risk Mgmt System.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
ZHRC/HTI Financial Management Training
EM15 – Contractors COST MANAGEMENT
Marketing BY: CHEREESE LANGLEY. Nature of work Formulate, direct and coordinate marketing activities and policies to promote products and services, working.
IT Job Roles Task 20. Software Engineer Job Description Software engineers are responsible for creating and maintaining software of various different.
1 RICS The Royal Institution of Chartered Surveyors London Quantity Surveying & Construction Faculty The Built Environment Group Corporate Professional.
Practical Placements & the QAA and ASET Guidelines By Ian Sunley & Lorna Uden Faculty of Computing, Engineering & Technology, Staffordshire University,
Kenny McKenzie MRICS Chair of Building Control Professional Group
HR Planning & HRIS. HR Planning The process of systematically reviewing HR requirements to ensure that the required number of employees, with the required.
Financial literacy is defined as the ability to read, analyze, manage and communicate about the personal financial conditions that affect material well-being.
Association for Biblical Higher Education February 13, 2013 Lori Jo Stanfield Evaluator Team Training for Business Officers.
Introduction Time Quality Cost Project Constraints Success Introduction.
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
The Route to Chartered Membership A presentation to the London Branch
Implementing SAE Programs!. NEXT GENERATION SCIENCE/COMMON CORE STANDARDS ADDRESSED! CCSS.Math.Content.HSN-Q.A.3 Choose a level of accuracy appropriate.
Mechanical Engineer By Connor Armstrong. You could be: carrying out basic research into particular issues and problems in the design or manufacture using.
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
McGraw-Hill/Irwin © The McGraw-Hill Companies 2010 Audit Planning and Types of Audit Tests Chapter Five.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Financial Management Back to Table of Contents. Financial Management 2 Chapter 21 Financial Management Analyzing Your Finances Managing Your Finances.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Accounting & Financial Analysis 1 Lecture 9 Manage finances within a budget (THHGLE13B)
Unit F Supervised Experience in Agriculture/Horticulture.
Project Procurement Management
Head Office Hannay House 39 Clarendon Road Watford Hertfordshire WD17 1JA UK Telephone: +44 (0) Facsimile: +44 (0)
Overview ENGINUITY Copyright Virtual Management Simulations.
Careers in Distribution, Copyright 2005, WERC Careers in Distribution Management Jobs.
Q. What does a Building Surveyor do? A.Building Surveyors provide professional advice on property and construction. Commercial Industrial Leisure Agricultural.
N ational Q ualifications F ramework N Q F Quality Center National Accreditation Committee.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Folie 1 Sarajevo, October 2009 Stefan Friedrichs Managing Partner Public One // Governance Consulting Project Management in the Public Sector Monitoring.
Marketing to Main Contractors Winning Work from a Main Contractor Paul Clarkson Iain Flatters Construction Director Group Procurment Manager.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Being a Governor: Challenges and Expectation Jim Benson Secretary to Council Brunel University.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Roles and responsibilities PM
The Design Team Carl James.
Personal and Professional Development Life Long Learning
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
Clinical Engineering Lecture (3).
Infrastructure Cost Mitigation
Temporary Works Co-ordination
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Monday 14th May – Friday 18th May 2018
United Nations Voluntary Fund on Disability (UNVFD)
Candidate Registration & Induction
CEng progression through the IOM3
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

CIDC Delhi Role of Quantity Surveyor As Profit Center S A Reddi Value Engineering Consultant sareddi32@rediffmail.com

Quantity Surveyor A quantity surveyor (QS) is a professional working within the construction industry concerned with Project costs. The profession is one that provides a qualification gained following formal education, specific training and experience that provides a general set of skills that are then applied to a diverse variety of problems.1 Predominantly these relate to costs and contracts on construction projects.

Quantity Surveyor Job description A quantity surveyor manages all costs relating to building and civil engineering projects, from the initial calculations to the final figures Surveyors seek to minimize the costs of a project and enhance value for money, while still achieving the required standards and quality Many of these are specified by statutory building regulations, which the surveyor needs to understand and adhere to.

QS Typical Work Activities Preparing tender and contract documents, BOQ Costs analysis, Control Assist in establishing a client’s requirements and undertaking feasibility studies Prepare Analyze costing for tenders Allocating work to subcontractors Advice on contractual claims Progress reports, value completed work Aware of the different contracts in use Understand Health & Safety Regulations Risk and Value Management Advise on procurement strategy; Identify, analyse, develop responses to risks

QS Typical Work Activities A surveyor calculates all related costs so that companies will be well informed about how much each portion of their building will cost and the areas where they can minimize their costs Quantity surveyors goal is to enhance the value of a building in relation to the amount of money spent building it The surveyor looks at the construction process & determine Standards and Regulations to meet minimum statutory building regulations Will also determine areas most important to maintaining the quality of the new building.

QS Work Activities- Options A quantity surveyor can find business from either a contractor or the client, and they also have the option of choosing to work on-site or away in an office. Once chosen, he is involved in the entire building process from start to finish. At the beginning, he will evaluate the property and prepare estimates on the total costs involved in the project He will continue to prepare contractual documents, bills, and other tender documents. He will perform cost analysis, perform a risk and value management assessment of the property, as well as provide insight on cost control and procurement strategies

Entry Requirements for a Quantity Surveyor A first degree will give the best opportunities as a quantity surveyor Accredited institutions like the Royal Institution of Chartered Surveyors (RICS) or the similarly well-known Chartered Institute of Building (CIOB) offer many degree programs With such a degree, One will probably be able to secure a better position and earn more money, but may not necessarily need a degree in quantity surveying in order to be successful in this career.

Case: Quantity Surveyor of A Construction Co Mr X, a Matriculate, Started as Administrative Assistant in the QS Dept Diligent Observation, Studies Enabled Rise To The Position OF HOD On Retirement, The Position Was Difficult to Fill He Studied General Conditions of Contract of Each Tender, Made Copious Notes of Strengths and Weaknesses in the Documents Which Enabled Successful Claims Later On!

Case: QS Director In UK Const Co Personal Experience As Head of Foreign Operations, Visited A Leading Construction Co in UK The Managing Director Introduced Fellow Board Members; One Was Director, QS! The MD Clarified That During Lean Periods, It is The QS Director Who Helped Generated Profits Thro Identifying Claims At The Tender Stage

Qualifications You may also be able to enter without any degree at all. You will need to be prepared to work your way through the industry Some businesses may actually fund degree courses related to quantity surveying so that you can get the education necessary to make the most out of this career. if you do have a degree unrelated to quantity surveying you complete further study and the RICS. The RICS is a qualification program designed to give career seekers another route to becoming a quantity surveyor.

Skills Required Methodical and analytical thinking as will as practical and logical reasoning skills Problem solving skills with a creative approach Skill related to mathematics and financial management Concise writing skills to produce reports on complex information * Thorough knowledge and understanding of building and construction codes, regulations, etc have enough hands on, work experience Formal education is important, but being able to demonstrate that you have a relevant understanding of building and construction can go a long way

Continuing Professional Development (CPD) Continuing professional development is almost the norm in today's business world. The RICS offers a lifelong learning programme that will allow you to record and mark any professional developments that you have made over the years. Programs designed to promote learning in an open atmosphere, as well as provide a space for private study RICS has also established conferences and events that quantity surveyors can attend to learn more

Quantity Surveyor Functions The QS reports to Project Manager Provides advice in the decision-making throughout the management of a project from initial inception to final completion The QS handles estimating and cost control, the tendering process and, after contract award, the commercial interface QS carries out estimating and measurement of works prior to tender, producing the bill of quantities; produce tender documentation and manage the tender process; clarify and evaluate tenders; and manage the resultant contract through monthly valuations, variations control, contract administration and assessment of claims. .

Quantity Surveyor Functions Some are trained in techniques of cost control. Those who emphasize the cost discipline Are Often Called "Construction Cost Consultant". They ensure that projects are designed and constructed in such as to Get value for money, cost certainty , programme dates Others emphasize contracts management. Trained to draft, interpret and administer complex contracts, those who operate in the broader field of project management often adopt other titles such as "Contracts Manager" or "Construction Surveyor".

Contractor's QS Responsible for performance of operations that mirror those of the owner's QS- the measurement and pricing of construction work, but specifically that actually performed by the contractor as opposed to the construction work described and measured in the construction contract between the owner and the contractor. Such a difference in quantity of work may arise from changes required by an owner, or by an architect or engineer on an owner's behalf. Typically, the settlement of a change

Contractor's QS The role of a contractor's QS will extend further than the day to day running of building projects Will cover sub-contract formation, forecasting of costs and values of the project, cash flow forecasts and the collation of the operation and maintenance manuals of the project This increase in the capacity of the surveying profession has led to an increased demand for qualified personnel

About RICS : RICS (Royal Institution of Chartered Surveyors) coversall aspects of property, construction and associated environmental issues. RICS has 86,000 chartered members (FRICS and MRICS) and 55,000 members in other categories of membership globally. It represents, regulates and promotes the work of these property professionals throughout 146 countries. RICS is governed by a Royal Charter approved by Parliament which requires it to act in the public interest. It is also a professional regulatory body approved by Government

Planning During the planning procedures the QS plays a key role in assessing whether the project is feasible economically The Quantity Surveyor may act in consulting role to engineers and architects, advising them on cost effective methodologies and procedures Professionally trained in building code and by-laws, He ensures the project adheres to local and national regulations Feasibility, both engineering and economical , is a key factor in the planning procedure

Construction While the project is underway , the Quantity Surveyor Ensures the process runs smoothly and within budget limits Conflict can arise and the Quantity Surveyor Steps in to act as a liaison between conflicted members of the construction process Interpersonal relationships Among the construction team keep the project moving Attention to monitoring the costs and economics involved during the construction. Keeping the project running without conflict

Post-Construction After the project is completed, responsibilities and function shift. This objective now is to monitor the building and make sure that operational costs are kept inside the budget. the responsibilities are to make sure the project adheres to local and national tax laws. Insurance claims and cost of replacement are dealt with by the Quantity Surveyor. Accurate estimates of damages and costs of destroyed or damaged goods are also provided.

Responsibilities During Tendering To establish the cost of installation, materials and workmanships and to come out with a well –planned quotation which is beneficial to both the company and the main contractors for each individual project that the company is handling To prepare contracts for projects by stating clearly the terms and conditions, studying and understand the contracts When projects are completed, proceed with claiming of payments from the relevant parties and complete the collection of payments as soon as possible.

Basic Roles And Responsibilities Prepare , submit and collect claims for payment Prepare, submit quotations. Diligently to following up Do awarding of contracts and preparation of contracts related documents Sourcing and purchasing of materials and related products needed for production Perform liaison with engineer and sales department Perform liaison with main contractors, sub contractors and other parties involved the projects Studies other project cases to solve any problems Report Progress Daily to boss without being asked

Monitor Construction Cost As advisers, they estimate and monitor construction costs, from the feasibility stage of a project through to the completion of the construction period After construction they may be involved with tax depreciation schedules, replacement cost estimation for insurance purposes and, if necessary, mediation and arbitration.

Liaison Work Quantity Surveyors work closely with architects, financiers, engineers, contractors, suppliers, project owners, accountants, insurance underwriters, solicitors and Courts Quantity surveyors get their name from the Bill of Quantities,. This is measured from design drawings, to be used by the contractors for tendering and for progress payments, for variations and changes and ultimately for statistics, taxation and valuation.

Advise on Economics Initially quantity surveyors use their knowledge of construction methods and costs to advise on the most economical way They use Cost Planning, Estimating, Cost Analysis, Cost-in-use Studies and Value Engg to establish a project budget During design the QS ensures that the design remains on budget through Cost Management Essential additions offset by identified other savings On completion of design and drawings, the quantity surveyor may prepare a Bill of Quantities, which is issued with the specification, for use by contractors in submitting tenders.

Tenders The contractor's quantity surveyors prepare tenders, and price alternatives Involved in assessing tenders, advise on the type of contract or special clauses in it During construction they fairly value progress payments at regular intervals, value changes to design or quantities which may arise by reference to appropriate Bill of Quantities rates They prepareclaims for progress payments and additional work.

Role On Project Completion On completion the quantity surveyor produces depreciation schedules of project components advises on insurance replacement costs In case of disputes the quantity surveyor is called on as an expert witness, and some quantity surveyors act as arbitrators. Both the contractor's and owner's quantity surveyors will be involved in this They use their skills in refurbishment of old buildings, alterations to existing buildings and insurance replacement estimates

Analytical Mind Quantity surveyors have orderly and analytical minds and prepared to work to very rigid time schedules. As decisions involving large sums of money are often made using information produced by them they must be accurate in all aspects of their work Quantity surveyors work in the private sector with Contractors, in the public sector mainly with the Government Departments/Authorities, financiers, property developers, project managers and universities

Comments, queries, suggestions? sareddi32@rediffmail.com Thank You