The Importance and Value of Process Improvement. Rationale for Process Improvement Establishing an attitude and culture of quality improvement and continuous.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Lean Six Sigma Green Belt Training
Systems Investigation and Analysis
27-Feb-01 1 Implementing Effective Requirements Practices Presented by Dr. Ralph R. Young Director, Software Engineering Systems and Process Engineering.
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
How to Map a Sales Process That Creates Value for Customers! July 2003.
Total Quality Management
Requirements Analysis INCOSE Systems Engineering Boot Camp
1 Continuous Improvement. 2 1.Overview of the PDCA Problem Solving Cycle. 2.Foundations of the PDCA Cycle 3.Plan Step 4.Do Step 5.Check Step 6.Act Step.
SOFTWARE PROJECT MANAGEMENT Project Quality Management Dr. Ahmet TÜMAY, PMP.
Introduction to Systems Analysis and Design
Overview of DMAIC A Systematic Framework for Problem Solving
Capability Maturity Model
Quality Improvement Prepeared By Dr: Manal Moussa.
Managing Project Quality
Chapter : Software Process
Process: A Generic View
Process: A Generic View n A software process  is a roadmap to building high quality software products.  provides a framework for managing activities.
Delmar Learning Copyright © 2003 Delmar Learning, a Thomson Learning company Nursing Leadership & Management Patricia Kelly-Heidenthal
Process Management Process improvement (for Chronic problems) Process control (for Sporadic problems)
CMMI Course Summary CMMI course Module 9..
© 2005 Wiley1 Total Quality Management Chapter 5.
Integrated Capability Maturity Model (CMMI)
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
Introduction & Implementation of TQM Introduction & Implementation of TQM By -Fuad Al- Ruhaili -Mohammed Al-hosawi -Talal Al-Hawsawi -Mohammed Al-Otaibi.
CQI (TQM) Tools and Time Management. CQI or TQM?? u CQI – Continuous Quality Improvement or u TQM – Total Quality Management Technically, there are some.
N By: Md Rezaul Huda Reza n
Business Analysis and Essential Competencies
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
Chapter 2 Process: A Generic View
Software Engineering Lecture # 17
Chapter 12: Systems Investigation and Analysis. Agenda  How to Develop a CBIS?  Systems Development Life Cycle (SDLC)  Prototyping  Join Application.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Human Resource Management Lecture 14 MGT 350. Last Lecture Holland Vocational Preferences Three major components – People have varying occupational preferences.
PRINCIPLES 4 PRINCIPLES OF TQM : 1.DELIGHT THE CUSTOMER 2.MANAGEMENT THE FACT 3.PEOPLE-BASED MANAGEMENT 4.CONTINOUS IMPROVEMENT.
Week 8 - Quality Management Learning Objectives You should be able to: §List and explain common principles of quality management (QM) §List, distinguish.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Process Walk & SIPOC Define Kaizen Facilitation. Objectives Understand the process as a “system” Describe the concept of an entity and how it relates.
Software Development Cycle What is Software? Instructions (computer programs) that when executed provide desired function and performance Data structures.
Process Improvement. It is not necessary to change. Survival is not mandatory. »W. Edwards Deming Both change and stability are fundamental to process.
6/6/01 1 Copyright 2001 by Ralph R. Young Effective Requirements Practices Designed to improve individual, project, and organizational effectiveness. Based.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Requirements Gathering: Pragmatic Ways to Meet Real Customer Needs Requirements Gathering: Pragmatic Ways to Meet Real Customer Needs PMI CVC Professional.
Process: A Generic View
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
DMAIC 1. (Define, Measure, Analyze, Improve and Control) is a process for continual improvement. It is a systematic and fact based approach to plan, sequence.
Project Quality Management.  Define project quality management.  Describe quality planning and its relationship to project scope management.  Discuss.
Chapter 11 TQM & Quality Tools. Management 3620Chapter 11 TQM and Quality Tools11-2 Total Quality Management A philosophy that involves everyone in an.
OM7a -1TQM and Quality Tools Chapter 11 TQM & Quality Tools.
Process Improvement. It is not necessary to change. Survival is not mandatory. »W. Edwards Deming.
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
Chapter 5 Value Stream Mapping. IT-465 Lean Manufacturing2 What is VSM? It is a method of creating a “one page picture” of all of the processes that occur.
 CMMI  REQUIREMENT DEVELOPMENT  SPECIFIC AND GENERIC GOALS  SG1: Develop CUSTOMER Requirement  SG2: Develop Product Requirement  SG3: Analyze.
Data Collection & Analysis ETI 6134 Dr. Karla Moore.
Software Engineering (CSI 321) Software Process: A Generic View 1.
UNIT 5.
Mahindra Satyam Confidential Quality Management System Software Defect Prevention.
1 Systems Analysis & Design 7 th Edition Chapter 2.
CMMI Overview Quality Frameworks. Slide 2 of 146 Outline Introduction High level overview of CMMI Questions and comments.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Lean Six Sigma DMAIC Improvement Story
Lean Six Sigma DMAIC Improvement Story
Lean Six Sigma DMAIC Improvement Story
Title: Owner: Ver: Date:
Why is Implementing Effective Requirements Practices So Hard?
Capability Maturity Model
Capability Maturity Model
1 -: 8D Problem Solving Technique :- Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Presentation transcript:

The Importance and Value of Process Improvement

Rationale for Process Improvement Establishing an attitude and culture of quality improvement and continuous improvement enables and empowers the members of an organization to get “ever better.” Having and using a set of “Rules of Conduct” is helpful - some would say “essential.” Using a process improvement approach and “quality tools” is necessary to achieve “customer satisfaction.” Treat all others with whom you work as “customers.” – Internal customers – External customers

How Can We Best Support Each Other in Our Work Environment? Consider establishing a set of “Rules of Conduct,” for example: Respect for each person Share responsibility Criticize ideas, not people Keep an open mind Question and participate Arrive on time Keep interruptions to a minimum Manage by fact

Our Customer Satisfaction Approach We are in a long-term relationship with our customers. We want to help our customer identify and satisfy their real needs. We understand that “joint” effort is needed to emerge real requirements and that needs will change and evolve. We desire to maintain excellent communications and relationships with all internal and external customers.

What is a process improvement approach? Identify our high priority processes Design and document them, involving all “stakeholders.” Deploy defined processes and implement them. “Institutionalize” use of defined processes. Continually improve defined processes. Apply quantitative measures (Ps and Qs) and quantitative management if appropriate. – Level 4 Working Group L4WG) - Craig Hollenbach, lead.

How do we identify our “high- priority” processes? Identify the products and services we provide. Identify our customers. Identify the processes we perform/use to provide products and services. Identify those that are most important

Components of a Quality Improvement (QI) Approach – A set of processes for key work functions. A “process” = a flowchart and an accompanying narrative description or “Process Description” (PD) – Use a template [“QIDW”] to design processes: Name of the process Process customers Customer valid requirements (CVRs) Process Flowchart Departments/Organizations/Roles involved Steps of the process. – Quality Teams (to design and improve processes) – Supporting QI Principles that provide the foundation: Customer Satisfaction Continuous Improvement (Plan-Do-Check-Act or PDCA) Management by Fact Respect for People

Our QI System (continued) – The customer is the one/those who receives our product(s) or uses our services – “Customer Satisfaction” is evaluated on the basis of cost, schedule, quality, responsiveness, inter-personal relationships – Customer valid Requirements (CVR) - we can use the following criteria for a CVR:  Reasonable?  Understandable?  Measurable?  Believable?  Achievable? You or your organization can meet the requirement. Customers verify that you understand what they require. Objectively determine the degree or frequency. Employees will agree to strive for that level of achievement. We can meet the requirement. This R-U-M-B-A list contains the five criteria that will identify a true valid requirement.

Flow Charting A flowchart is a graphic representation of a process. It shows how process activities are sequenced to produce an output or outcome. Reasons to create a flowchart for processes are to: describe how activities are being done. Identify where modifications to an existing process might best be made. Investigate where problems might occur. Identify how, when, or where we should measure an existing process to achieve customer satisfaction. Aid in the design of a new process.

Flowcharting (continued) A circle shows the start or end of the process. A rectangle contains a statement beginning with a verb; it represents an activity. An arrow indicates the main direction of flow from one activity to the next in the sequence. Only one main path is allowed from an activity. A diamond signifies a decision. Usually, two paths emerge from a decision--signifying “Yes” and “No” responses to a question stated inside the diamond. A circle with a letter or number inside symbolizes continuation of flowchart. A circle with the letter Q or P represents the location of a quality or process indicator. A small circle with an arrow represents input from an outside source such as a supplier. A Q1P1

QI Tools and Techniques That We Use Frequently Tools Graphs/Piecharts/Barcharts Histograms Flowchart Control Charts Pareto Charts Fishbone Diagrams Root Cause Analysis Countermeasures Action Plans PDCA Checklists Problem Statement Target Techniques Brainstorming Multivoting Stratification Cause and Effect Analysis Cost Estimation Cost/Benefit Analysis Barriers and Aids Analysis Process Design and Development Statistical Process Control (SPC) QI Story/Problem-solving Process Tracking Decision Analysis and Resolution TEAMWORKS!

PDCA – To achieve continuous improvement, we must: – Plan for it – Do (implement) it – Check and Analyze the results – Act – Sometimes we use the term “PDCA” as a noun: “Let’s do PDCA!” – At the end of meetings. – After an improvement cycle. – When we want to evaluate progress or possible improvement actions.

Processes “Macro” or high level “Micro” or lower level or sub-processes Quality (Q) and Process (P) Indicators: Q - an indicator of the quality of a product. P - an indicator of the quality of the process being used to produce a product. All indicators should be: – Measurable (able to be expressed quantitatively) – Verifiable (observable and audible) – Cost-effective (selected with economy of time and cost in mind)

Rationale for Process Improvement Capability Costs Current processImproved process Current cost Current capability Reduced cost Reduced capability for lower cost Improved capability at lower cost Cost of process improvement Source: Merle Whatley, Texas Instruments, Inc.. Downsizing Process Improvement Options depending upon business goals CMMI is a tool for improving the ability to transition to an improved process effectively

Benefits of Process Improvement Over a five-year period, the Software Engineering Institute(SEI) has documented that by having processes and a focus on continuous improvement, these results can be achieved. Productivity Increases202% Cycle Time Reduction46% Defect Reduction90% Predictability Error Reduction76% Average time 5 years Data derived from an SEI Technical Report, “Benefits of CMM-Based Software Process Improvement,” CMU/SEI-94-TR-13, August 1994.

Summary The Importance and Value of Process Improvement (PI) – An attitude and culture of QI fosters a continuous improvement ethic. – A set of “Rules of Conduct” helps us treat others as we like to be treated and encourages active involvement in work efforts. – Using a PI approach fosters customer satisfaction. – Components of a QI approach include: A set of processes A method/template to design processes Quality Teams Supporting Quality Improvement Principles – We can evaluate our CVRs utilizing the RUMBA criteria. – We have a robust and useful set of QI tools and techniques. – “PDCA” has proven very effective in generating new ideas.