Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.

Slides:



Advertisements
Similar presentations
Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
Advertisements

Central Valley Flood Protection Board Meeting – Agenda Item No. 7A APPLICATION NO
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
FDOT R/W Guidelines Use of License Agreements
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Central Valley Flood Protection Board Meeting – September 27,
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
Central Valley Flood Protection Board Meeting – Agenda Item No. 13B.
Hydraulic Screening and Analysis Needed for USACE Review
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
Central Valley Flood Protection Board Meeting – Agenda Item No. 11 DESIGNATED FLOODWAY MODIFICATION.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO
Central Valley Flood Protection Board Meeting – December 20,
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
Central Valley Flood Protection Board August 9, 2013 Presented by: Michael Mierzwa California Department of Water Resources DWR’s Involvement in Flood.
Productive SB 18 Consultation Michelle LaPena, Esq. LaPena Law Corporation 2001 N Street, Suite 100 Sacramento, CA (916)
La Center, Washington: Balancing Pipelines and Populations 1.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
August 28, 2015 Meeting of the Central Valley Flood Protection Board Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
CORPS OF ENGINEERS REGULATORY PROGRAM PUBLIC INTEREST REVIEW (33 CFR Part 320) August 12, 2005.
Preparing a Right of Way Clearance Certification Request Missouri Local Programs How to complete right of way clearance certification-No new property rights.
Department of Water Resources FloodSAFE Environmental Stewardship and Statewide Resources Office Gail Newton, Chief, FloodSAFE Environmental Stewardship.
Yuba County Comprehensive Flood Protection Program
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
1. Land Conservation Act (LCA) * Public Agency Webinar Public Acquisition Notification Procedure – A Step by Step Guide * LCA, also known as the Williamson.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
1 Natomas Levee Improvement Program Crediting Issues Before the Central Valley Flood Protection Board February, 2009 Sacramento Area Flood Control Agency.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Residential Plats Orange County Board of County Commissioners August 19, 2014.
Tracey Ferguson Project Manager, Integrated Water Resources ATKINS.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 City of Portland Bureau of Development Services Staff Presentation to the Historic Landmarks Commission Type II Appeal of Approval LU HDZ –
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
June 13, 2013 Presented by: California Department of Water Resources Flood Management Programs Status and Interactions.
San Francisco Public Utilities Commission Water System Improvement Program Bay Division Pipeline Project July 14, 2009.
BOR Real Property Conveyances and Restrictions Anita Bain, Director Natural Resource Management Division August 18, 2006 Anita Bain, Director Natural.
Planning & Community Development Department 180 South Euclid Avenue Demolition of Existing Structure Consolidated Design Review (Appeal) City Council June.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
May 14, Planning Commission Planning Commission May 14, 2015.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Jefferson County SA Red Rocks Site Approval
WVAR Sierra RV S. Virginia Street (old 395 S)
Continuing Authorities Program
Preparing a Right of Way Clearance Certification Request
Construction Management & Inspection
Consideration of Action Re: Commercial Cannabis Businesses
Chapter 15 Site Plan Layout.
Moratorium Session 7 Oceanfront Development Proposals: December 3rd Folly Beach Planning Commission Reminder that this presentation, as well as past.
Flood Plain Regulations
WSUP (Lightning W Tank #2)
Sacramento Environmental Commission January 2019.
Presentation transcript:

Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board February 26, 2009

Purpose of Briefing Illustrate challenges associated with the unknown location of the current Project Levee. Describe methodology used to propose a new location of the “jurisdictional” levee. Explain relationship between proposed location and future improvements. Obtain direction from Board for DWR staff to acquire easements for the SSJDD.

West Sacramento is the lightly shaded area. The Triangle is the dark shaded area bounded by: - Sacramento River - former SR US 50 RD 900 is the LMA

Tower Bridge Flow

Triangle Above Base Flood Elevation The high-ground is not natural but is the result of river dredge materials placed here in the early 20th century. Dredge materials not only created the high ground but buried the original levee prism. The area is generally above base- flood elevation location.

Comparative Cross-Sections Standard Project Levee Triangle High Ground

No Clear Indicators on Levee Location Sacramento River Flood Control Project authorized in 1917 No easements were acquired for the project in this area. No drawings or other records delineating the levee location have been discovered. –Only tiny dots in the O&M manual. Recent borings did not provide any location data.

Board Jurisdiction? Future development by City and landowners will likely require encroachment permits Lack of easements and no physical location of the levee prism has prevented Board staff to determine Board jurisdiction City and landowners do not know where encroachment permits are needed

A Cooperative Process Landowners, RD 900, city of West Sacramento, Corps, and Board staff have worked together to determine how to protect the public safety and also allow for future development to occur. An informational briefing by the city to the Board in March 2008 presented this issue and requested feedback, which it received.

Proposed “Virtual Levee” Solution Determine levee location by imagining a “virtual levee” within high ground. Assure that the “virtual levee” provides clear location of Project Levee for locals, State, and Corps. Record location of “virtual levee” and a “building setback line” to develop undisputed Board jurisdiction by conveying easements to SSJDD.

“Building Setback” Line Criteria 3:1 water side slope, located to protect against past and future erosion with no daylighting along the existing riverbank 20 foot top width. Top of levee elevation equals actual ground (1.5 feet higher than 1957 design profile plus freeboard) 2:1 land side slope to estimated native grade 10 foot “virtual” inspection road.

“Virtual Levee” Cross Section

Solution Will Support Future Actions to Reach 200-year Protection Levee will need to be raised ~1.5 feet to provide 200- year protection. The proposed solution will obtain a large enough easement to accommodate future 200-year improvements The following maps show the proposed building setback line and Corps-requested 200-year easement requirement

Process to Date Based on Board feedback from March, 2008 briefing, West Sacramento ran additional scenarios. Board staff reviewed final proposal Corps staff reviewed final proposal –Operations and Readiness Branch (flood ops & response) –Engineering Branch (geotechnical review) Board and city staffs met with DWR Real Estate City and landowners willing to offer or dedicate easements to the State All cooperating parties support the proposed resolution

Local Agency Endorsement Because this is not an application for an encroachment permit no written endorsement is required from Reclamation District 900, but the District has been an active participant throughout development of the proposed solution.

CEQA Environmental Evaluation Board staff propose that the project is exempt from CEQA under CEQA Guidelines Section (b) (3) because the activity is covered by the general rule that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment the activity is not subject to CEQA.

CEQA Environmental Evaluation The proposed acquisition of easements will not lead to rebuilding the levee, but will more clearly define the levee (and thus the extent of Board jurisdiction) as it currently exists. Future development in the Triangle area including residential, commercial, recreation, and flood control projects may require Board encroachment permits, and will need to be evaluated for CEQA compliance at that time.

Need for Board Action Approval of this proposal will allow the State of California to acquire flood control easements for the Sacramento River Flood Control Project in the Triangle high ground area of West Sacramento New easements will give the landowners and city of West Sacramento certainty as to the landward extent of the Sacramento River Flood Control Project

Staff Recommendation For the Central Valley Flood Protection Board to approve Resolution –finding the project exempt from CEQA –requesting the DWR Real Estate Branch to acquire all necessary real property rights to clear title for the Sacramento River Flood Control Project in the city of West Sacramento Triangle high ground area by acquiring all necessary easements through dedication or for nominal compensation

Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board February 26, 2009