Just-In-Time Manufacturing David Comita Arielle Herold Jaslyn Moore Shanelle Williamson.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
JIT, TPS, and Lean Operations
Just-in-Time and Lean Systems
Just-In-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Just-in-time.
INDUSTRIAL & SYSTEMS ENGINEERING
CSUN - Prof. David Shternberg
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
1 JUST IN TIME SYSTEMS Figen KAS Dokuz Eylul University Industrial Engineering Department.
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Operations Management
JIT and Lean Operations
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Just-In-Time Manufacturing. JOIN KHALID AZIZ  FRESH CLASSES  ICMAP STAGE 3  COST ACCOUNTING PERFORMANCE APPRAISAL  18 TH FEBRUARY 2010  INDIVIDUAL.
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Define Just-in-Time.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Introduction & Implementation of TQM Introduction & Implementation of TQM By -Fuad Al- Ruhaili -Mohammed Al-hosawi -Talal Al-Hawsawi -Mohammed Al-Otaibi.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Just-in-Time Manufacturing. A. INTRODUCTION Why “Just-in-Time” manufacturing ? Why “Just-in-Time” manufacturing ? No large capital outlays required. No.
18-1 Irwin/McGraw-Hill ©The McGraw-Hill Companies, Inc., 2000 Operations Management: Managing Quality, Efficiency, and Responsiveness to Customers Technology.
1 1. Some Thoughts on Production Management 2. What is Just-In-Time ? 3. How does EOQ Impact JIT ? 4. Motivation For EOQ 5. Impacts of Reducing Inventory.
Value Analysis/ Flow Analysis
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
JIT – Just-In-Time Production
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
Chapter 7 – Just-in-Time and Lean Systems
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
UNIT 4. All facilities, functions, activities, associated with flow and transformation of goods and services from raw materials to customer, as well as.
Just-in-Time and Lean Systems
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
Just in time manufacturing
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
Chapter 20 Managing inventory and quality. The importance of inventory management §Cope with uncertainties in customer demand and in production processes.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Lean Operations.
Lean Production.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Operations Fall 2015 Bruce Duggan Providence University College.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
Teamwork Presentation on JUST IN TIME” METHOD World Wide Science, Online MBA Program 25 June 2011 Head of Group: Head of Group: Ahmad Shikeb Farazi Ahmad.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
BRIGHT NSIAH FORDJOUR INNOVATION IN BUSINESS CREATION AND MANAGEMENT.
“Japanese Manufacturing Techniques” & “Uprooting the Toyota Production System” PRESENTED BY: SLAVIK DEMIN & ALON SIMCHONI Based on the articles by xxxxxx.
Lean Manufacturing Series
A Brief Overview Central Themes Prerequisites for Implementation
Inputs and Outputs to Aggregate Production Planning
Pull Manufacturing and Just In Time
Introduction to Lean Emily Varnado.
A Look into Efficiency in Business
Welcome to my presentation
MODERN TRENDS IN PRODUCTION ENGINEERING
Just In Time.
Presentation transcript:

Just-In-Time Manufacturing David Comita Arielle Herold Jaslyn Moore Shanelle Williamson

Introduction Just-In-Time or JIT Manufacturing is a management philosophy that improves businesses by decreasing inventory and the costs associated with it. JIT focuses on constant improvement of manufacturing’s organizations return on investment, quality and efficiency.

Outline O History O Philosophy O JITs approach to Manufacturing O Strengths O Weaknesses O Real Life Examples

History O JIT was first developed within Toyota manufacturing plants by Taiichi Ohno during the early 1970s. O “The oil embargo probably triggered his theory, the program was intended to avoid wastes, reduce inventories and increase production efficiency in order to maintain Toyota’s competitive edge” (Lorefice).

History O “JIT is a Japanese management philosophy which has be applied in practice since the early 1970s in many Japanese manufacturing organizations. It was first developed and perfected within the Toyota manufacturing plants by Taiichi Ohno as a means of meeting consumer demands with minimum delays. O “Toyota realized that JIT would only be successful if every individual within the organization was involved and committed to it, if the plant and processes were arranged for maximum output and efficiency, and if quality and production programs were scheduled to meet demands exactly” (JIT Just-in-Time manufacturing).

Philosophy O A management philosophy that continuously focuses on integrating and streamlining the manufacturing system into the simplest process possible. O A devotion to the process of continuously striving to minimize elements in manufacturing system that restrain productivity.

JITs approach to Manufacturing's

Goal#1 : Design for optimum quality and cost and ease of manufacturing O Design for customer satisfaction O Reduce the cost of manufacturing. O Design products for manufacturability O Use only proven technology. O Use design standardization O Simplify product design O Design for ease of construction and assembly O Minimized design and production cost O Design for product strength

Application of Goal #1 O Monitor customers request and problems O Use production and supplier involvement in the design process O Have a formal design acceptance based on production goals O Set formal goals on production performance O Minimize the cost of labor, materials and equipment in production

Goal#2: Minimized the resources expanded to produce a product O Integrate and optimize every step in manufacturing process O Build product to specification O Use work cell and pull production process O Locate and remove source of excess inventory O Set manufacturing standards at zero defects O Have each function be responsive for its own quality

Application of Goal#2 O Eliminate idleness in production system O Establish goals requiring continuous improvement in the manufacturing system O Remove all forms of gate inspection from the production system O Establish production responsibility for product quality

Goal#3: Be responsive to the customer O Provided customer with he or she wants O Develop manufacturing flexibility O Design product to meet costumer requirements O Reduce manufacturing lead time O Provide product on schedule O Provide product at the expected quality level

Application of Goal #3 O Continually monitor customer satisfaction O Have engineers meet with customers O Use kanban system for triggering production requirements O Eliminate all unnecessary inventory O Reduce or eliminate lead time from: supplies, overhead processes and manufacturing functions O Use flexible production processes and equipment O Train employees to operate a wide variety of process

Goal#4: Develop and trust open relationship with both suppliers and customers O Gain supplier and customer confidence in the company’s ability to maintain commitments O Develop processes and procedure necessary to commitments. O Use open kimono policy to develop supplier and costumer confidence O Use long-term contracts

Application to Goal#4 O Stabilize the supplier base O Fail-safe the production process O Give employees the authority to stop the production process (if needed) O Set a company wide policy of doing the job right O Deliver quality product on schedule.

Goal#5: Develop the commitment with each function and employee to improve the total manufacturing system O Do each job right every time O Use an open approach to planning and implementing a JIT system O Focus on prevention of problems rather than the resolution of problem after they occur O Continuously educate employees with regard to the need of supplier, costumers and the production process

Application of Goal#5 O Design production systems with intent to prevent problems O Establish a company wide defect prevention O Program O Use total quality control and statistical process control techniques.

Weakness O Requires considerable discipline on the part of every worker and supervisor; e.g. O Don’t work if no Kanban O Don’t lose Kanbans O Requires “pushing” for long lead-time raw materials and components (or huge inventories) O “Entropy”; i.e., explosion of WIP and Finished Goods for Products with Lots of Variety

Strengths O Shop floor makes and implements decision’s in response to the “Pull” on the system O Status of shop floor easy for management to see O Designed to respond quickly to: O Past events O Future events (if carefully planned in advance by management)

Real life Example

Real Life Example