Best practice – from the perspective of NoBo EN 1090

Slides:



Advertisements
Similar presentations
Manufacturing Processes Lab I, MET 1321 Inspection and Testing Welds
Advertisements

ASME Certified Yankee Dryer King Hardware May 3rd, 2010.
Speech by Chinese Shipbuilding Industry ( CSNAME &CANSI ) Contents 1. The acceptation of IMO PSPC standard 2. Preparation done by Chinese shipbuilding.
EN 81-1/2+A3 - UCM Application in Germany Wolfgang Adldinger WITTUR
Relation between CEN standards and performance based operations By JP Michaut Colas’ Group.
Confidential.  Name: Leadtech precision Engineering Pte Ltd  Address: Blk 20, Woodlands Link, #02-01 to 03 & #02-06 & #02-14 Singapore  Date.
Arc Welding Techniques and Metal preparation
SAROND WELDING s.r.o. is a manufacturing company focusing on deliveries for power-, transportation- and construction engineering businesses. The company.
Twinning Project RO2006/IB/EN/09 1 Saxony-Anhalt State Environmental Protection Agency Wolfgang GarcheBukarest Wolfgang Garche Saxony-Anhalt.
CE Regulation Service PROLAB Tech Rev 1 Machinery Directive Flow Chart A brief guide.
Angular Measurement.  Chapter ’ s key points 1. Introduction (international meter) 2. Classification of Angular Measurement instruments (line and end.
For the benefit of business and people
Adhesion Testing for Protective Coatings
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Shafts for rotating machines. Sorting of rotating el. machines According power –Small < 10 kW –middle-class up to 1 MW –big (not correctly specified)
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
EUROPEAN UNION GOVERNMENT OF ROMANIA SERBIAN GOVERNMENT Structural Funds Common borders. Common solutions. Romania – Republic of Serbia IPA Cross-border.
EN an Introduction Some thoughts by Harald Kahles.
13.4. GENERAL DESIGN CONSIDERATIONS: PRESSURE VESSELS
Materials Bratislava 11/12/13 April 2005 Presented by Peter Hanmore For the benefit of business and people TAIEX Workshop on the Pressure Equipment Directive.
24/03/2006 Introduction to IMO Performance Standard for Protective Coating and IACS Common Structural Rules BV Surveyor’s Training Development Department.
Accreditation and Notification in Poland CEOC CEE meeting, Prague, 8th – 10th April 2014.
REPUBLIC OF CROATIA STATE OFFICE FOR METROLOGY Conformity Assessment Procedures of the „New Approach“ of EU illustrated by the Measuring Instruments Directive.
1 TAIEX PED workshop - IM TAIEX Workshop on the implementation of the Pressure Equipment Directive (PED) Bucharest, 27 February - 1 March 2007 Non-Destructive.
Chamdor Plant Tungsten Street Plant Cobalt Street Plant Dedicated Welding And QC Facility Machine Shop THREE FOUNDRIES AND SUPPORTING PLANTS.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Váradi Metal Kft. H-7020 Dunaföldvár, Paksi u. 73. Tel:
1 ACCREDITATION – BG situation April 2014, Prague STATE AGENCY STATE AGENCY FOR METROLOGICAL AND TECHNICAL SURVEILLANCE TECHNICAL SURVEILLANCE 1.
AFTHAP m Luis A. Agudo Fernández AFTHAP CONFERENCE REINFORCED AND PRESTRESSED CONCRETE PIPE, STEEL CYLINDER TYPE Module 4: Significant.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
1 PED: equivalent overall level of safety PED Annex 1, clause 7: The following provision apply as a general rule. However, where they are not applied,
1 Comparative Study: EN – ASME VIII Workshop on the Pressure Equipment Directive Warsaw, June, 2004 Dr. Reinhard Preiss TÜV Austria Krugerstrasse.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
SPVD 87/404/EEC TUKES SAFETY TECHNOLOGY AUTHORITY Market surveillance of simple pressure vessels - practical approach Teuvo Blomberg Senior Safety Engineer.
Approximation of legislation to the internal market acquis An EU funded project managed by European Agency for Reconstruction Directive 89/106/EEC on Construction.
Application of Thermal Spray
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
05/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2005:3 Inspection of pressure equipment.
Development of Agreement Concerning the Adoption of Uniform Conditions for Periodical Technical Inspections of Wheeled Vehicles and the Reciprocal Recognition.
NRTLs, FEBs and the NEC What every electrical inspector needs to know about NRTLs, FEBs, listing, labeling and the NEC. Presented by ACES
Concrete Weight Coating Plant “Aladja”
WELCOM TO EGIQC. EGIQC Engineering Group For Inspection & Quality Control.
Duties and Responsibilities
Chapter VI Summary. Welding testing is one of welding professional disciplines which based on modern physics, chemistry, mechanics,electronics and materials,It.
WELDED CONNECTIONS I.
SIA “Reserv Inc” Arturs Andersons Latvia Tel
NCSLI 2007 Training Records from an Auditors Viewpoint Shawn Mason Boston Scientific.
- Generals for PED matters - Definition of pressure vessel and classes - Who is who according to PED - Definition of pressure vessel + codes for XFEL -
COATING STANDARD Primary surface preparation
Scope of Accreditation Katerina Bouranta Physicist MSc. Dynamics of Engineering Structures TAIEX Workshop on Better Understanding the Requirements for.
DRY TREATMENT STANDARD
PLASMA CUTTING MACHINES AT ARCRAFT PLASMA
ISO/IEC
Strategy for conformity of non-standard cryogenic equipment
CLEAN UP & INSPECTION.
Ti/SS transitions A.Basti INFN-PISA*
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
EMC & COMPLIANCE ENGINEERING
Cryostat design Mechanical design: Thermal screens: Specifications:
Third Party Activities for FH1 Project
Thomas Otto, TE Department, CERN
Testing and Certification according to ISO and ISO 17065
For the benefit of business and people
Non-Destructive Testing: New Methods and Qualification of Personnel
Quality Assurance for Emulsified Asphalt Surface Treatments
Quality Regulation for Mechanical Equipment RESSQ – Mech
Dennis Harwig and Bill Mohr, EWI
Supplier Briefing Pack
GNB-CPR Technical Secretariat
Presentation transcript:

Best practice – from the perspective of NoBo EN 1090 Zoltán GÖRBE, welding eng., ÉMI-TÜV SÜD Ltd., Hungary Oslo, 24. april 2013.

Best practice - from the perspective of NoBo TÜV SÜD is one of the world's leading technical service organisations

Best practice - from the perspective of NoBo America: Headquarter TÜV SÜD America Inc. Peabody, Massachusetts Europe: TÜV SÜD AG München, Germany Asia: TÜV SÜD Asia Pacific Pte. Ltd. Singapore more than 17,000 employees 800 locations

Best practice - from the perspective of NoBo About ÉMI-TÜV SÜD Ltd. (Hungary) Headquarter: Szentendre Offices: Budapest Nagykanizsa since 1991 155 employees 8 departments Hajdúnánás

Best practice - from the perspective of NoBo Notified Body Directives 87/404/EEC Simple Pressure Vessels 97/23/EC Pressure Equipment 95/16/EC Lifts 98/37/EC Machinery 89/106 EEC-CPD Construction products

Best practice - from the perspective of NoBo What will be discussed? 5 questions - 5 answers 1. thermal cutting 2. tack welds 3. painting 4. initial type testing 5. subcontractor of welding

Best practice - from the perspective of NoBo 1. thermal cutting 2. tack welds 3. painting 4. initial type testing 5. subcontractor of welding

Best practice - from the perspective of NoBo Thermal cutting The capability of thermal cutting processes shall be periodically checked - EN 1090-2 6.4.3 (EN ISO 9013) Quality of the cut surfaces perpendicularity or angularity tolerance (u) mean height of the profile (Rz5) Hardness of surfaces (HV 10)

Best practice - from the perspective of NoBo Manufacturer Nyír-Mezőgép Ltd., Hungary Execution class EXC 3 Product steel structure, for buildings Material S355J2 / EN 10025-2

Best practice - from the perspective of NoBo

Best practice - from the perspective of NoBo Questions Answers Who has to have these tests executed? The owner/user of the thermal cutting equipment. These results will be valid for that particular cutting machine. What shall happen with a new or another cutting equipment? Tests must be done for this cutting equipment, too.

Best practice - from the perspective of NoBo Subcontractor Nyír-Dinamika Ltd. (thermal cutting) specifications thermal cutting test report drawings contract (which equipment) plates with certificates cutting list (each project) systematically super- cut parts vise the process Manufacturer Nyír-Mezőgép Ltd.

Best practice - from the perspective of NoBo Example for typical shape from representative thickness sharp corner, curved arc (EN 1090-2 6.4.3) D D ≥ 200 mm L ≥ 200 mm

Best practice - from the perspective of NoBo 1. thermal cutting 2. tack welds 3. painting 4. initial type testing 5. subcontractor of welding

Best practice - from the perspective of NoBo Tack welds „The minimum length of the tack shall be the lesser of four times the thickness of the thicker part or 50 mm, unless a shorter length can be demonstrated as satisfactory by test.” – EN 1090-2, 7.5.7

Best practice - from the perspective of NoBo Manufacturer GeneralNet Corp., Hungary Execution class EXC 2 Product steel structure for mobile telecommunication Material S235JR / EN 10025-2

Best practice - from the perspective of NoBo

Best practice - from the perspective of NoBo Question Answer How can be demonstrated the conformity of the 10 mm long tack welds? With tack weld test. Visual testing / EN ISO 17637 Macro examination Penetrant test / EN 571-1 or Magnetic particle inspection / EN 17638

Best practice - from the perspective of NoBo Tack weld Fillet weld

Best practice - from the perspective of NoBo Visual test passed Penetrant test passed Macro examination passed Shorter tack weld length can be demonstrated as satisfactory by test.

Best practice - from the perspective of NoBo 1. thermal cutting 2. tack welds 3. painting 4. initial type testing 5. subcontractor of welding

Best practice - from the perspective of NoBo Painting According to EN 1090-2 F6.1, the temperature of the surfaces to be coated should be 3 degrees above the dew point.

Best practice - from the perspective of NoBo Manufacturer Nyír-Dinamika Ltd., Hungary Execution class EXC 1 Product steel structure basis of machines Material S355J2 / EN 10025-2

Best practice - from the perspective of NoBo

Best practice - from the perspective of NoBo Questions Answers Which equipments must be used to measure temperature and humidity? Calibrated thermometers and humidity meters. Which are the most important data of the painting log? Date Air & steel temperature Air humidity Dew point List of products Name of paint Thickness of coating Painter’s name

Best practice - from the perspective of NoBo Subcontractor Nyír-Mezőgép Ltd. (painting) contract specifications declaration (painting acc. to workpieces EN 1090-2 Annex F) systematically super- surface preparation vise the process painting Manufacturer Nyír-Dinamika Ltd.

Best practice - from the perspective of NoBo 1. thermal cutting 2. tack welds 3. painting 4. initial type testing 5. subcontractor of welding

Best practice - from the perspective of NoBo Initial type testing „Initial type testing is the complete set of tests or other procedures, determining the performance of samples of products representative of the product type.” – EN 1090-1, 6.2.1

Best practice - from the perspective of NoBo Question Answer There is no order for any product acc. to EN 1090. How can a manufacturer prove that they are capable to execute the initial type testing? The product for initial type testing can be a simple welded structure. Important! EXC of this simple structure = = EXC to be certified

Best practice - from the perspective of NoBo 1. thermal cutting 2. tack welds 3. painting 4. initial type testing 5. subcontractor of welding

Best practice - from the perspective of NoBo Question Answer The subcontractor has got only EN 3834-2 certificate. The manufacturer is responsible for the whole product, the subcontractor is responsible for the welding technology. Is EN 3834-2 enough for manufacturing according to EN 1090-1? This is not enough. The subcontractor has to be certified acc. to EN 1090-1 by a Notified Body for the suitable execution class.

Best practice - from the perspective of NoBo www.emi-tuv.hu www.en1090.hu gorbe.zoltan@emi-tuv.hu