Dr. V M Patel (Principal) Shankersinh Vaghela Bapu Institute Of Technology B.E. (Civil), M.E. (Structure – Gold Medal), Ph.D. ISTE, GICEA, ISES, AMIE,

Slides:



Advertisements
Similar presentations
PRESENTATION ON TURNKEY CONSTRUCTION.
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
CDIO Approach for Real-Time Experiential Learning of Large Structures By Dr Tao Nengfu, Yoong Yuen Soo, Tan Poh Seng School of Architecture and the Built.
MOST CRITICAL AND TASK AND MOST IMPORTANT 1.1 NO SOONER REDEVELOPMENT IS DISCUSSED OR EVEN MENTIONED.... HOST OF BUILDERS RELATED O MEMBERS OR THEIR FRIENDS.
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Interior Lifestyles Pvt. Ltd Welcome to our six step process for Interior designing of your commercial space. 6 6.
Construction Engineering 221 Drawings and Specifications.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Design & Layout of Foodservice Facilities
Civil engineering branches & scopes
MADDOX INFRASTRUCTURE PRIVATE LIMITED COMPANY PROFILE Maddox Infrastructure Private Limited.
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
GRK INFRAESTATE PRIVATE LIMITED BHOPAL M-207, 2’nd Floor, Vijay Stambh, M P Nagar, Bhopal – BANGALORE Flat No. C -02/ 001, Provident Housing, Dodballpur.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING FALL SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Constructionsite Roles in Construction Ron Gatepain.
TECHNOLGICAL DESIGN Architectura l Design Process.
 ELECTRI Council Meeting  Information Technology Assessment for Line Electrical Contractors Vanessa Valentin, Ph.D. Assistant Professor Department of.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Specification & Quantities Estimating
Topic1b: Project Life Cycle
Architect Eionde Driver.  Meet with clients to determine objectives and requirements for structures  Estimate the amount of required materials, equipment,
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
JOBS By: Ben Simmons CAREERS OCCUPATIONS. Architect Architects plan and design houses, office buildings, and other structures. I am interested in this.
Construction of a Transfer Station
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
Designer/Contractor JV- Apron Services Projects- A Winning Case
INTRODUCTION TO DEVELOPMENT LEARNING OBJECTIVES Discuss issues specific to the development and construction business. Identify the members of development.
Survey Meeting John Osborne, CERN 8 February 2016
TCCTC.  Everything in the world has a drawing that was drafted by a drafter.  You would be working with engineers to develop new and innovative ideas.
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
EC&O – BUSINESS Business Benefit Due to OMNI. OMNI – Complete EC&O Solution What is EC&O stands for… Real Estate Developer Developer plus contractor Core.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 8 PowerPoint presentation Industry bodies Unit.
What does a Civil Engineer do?
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 UNIT 6 Fields, Careers, Work Skills.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Contract and Tender form Phases of Designing Phases of Implementation VIA / TCU 4th semester workshop S2016 Contract and Tender form S2016 VIA University.
A cooperative program to serve all of India
Build Smart for a Future Ready Singapore
Façade Management Consulting
The Design Team Carl James.
Real Estate Development
Architecture, Interior and Project management consultant
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Construction Documents
(Refer to Chapter 2 of the textbook)
Measure N Modernization
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Architect A Person who works closely with clients to design structures by making preliminary drawings, sketches, and suggestions for material to be used.
4th Annual Construction Law Summit
GENERAL CONCEPTS RELATED TO BUILDING
BUILDING PROCESS STAGES
BUILDING PROCESS STAGES
Introduction DEFINATION :-
Contract and tender form Phases of designing Phases of implementation
ROLE OF ARCHITECTS ABHISHEK RAJ. Architect makes a plan, designs and then review the process of building construction. Architect is a person who makes.
Stoke Medical Centre RIBA Plan.
Architecture & Interiors Design Process
Presentation transcript:

Dr. V M Patel (Principal) Shankersinh Vaghela Bapu Institute Of Technology B.E. (Civil), M.E. (Structure – Gold Medal), Ph.D. ISTE, GICEA, ISES, AMIE, IGS(A), FIV Presented By Points To Be Discussed During Visit Of Project Site 1

POINTS TO BE DISCUSSED DURING VISIT OF PROJECT SITE Client information (private, govt., semi govt., board, Panchayat, etc.) Time duration of project Estimated project cost Name of contractor / builder / developer Name of architect / structural / drainage / plumbing / electrical / air conditioning / horticulture / interior / PMC consultant Type of tender / contractor work contract

POINTS TO BE DISCUSSED … Any Bar Chart or other method adopted for progress monitoring Any problem they faced during the planning & solution of it Any problem they faced during the execution & solution of it Development length, anchorage, splicing of bar proper or not Construction joint, member joint and separation joint Any special care or treatment adopted on site Any innovative idea implemented for increasing strength or decreasing cost or time

POINTS TO BE DISCUSSED … Construction cost per sq. mtrs. Floor area FSI, carpet area and built up area calculation Land rate at the time purchase of land and at the time of project completion Safety of labour and engineers on site High tech. equipments used for the project execution Design and execution quality check / monitoring authority while showing deficiency)

POINTS TO BE DISCUSSED … Take photographs as many as possible with permission Do not misuse the data of project site (do not mention project name while showing deficiency) Prepare site visit report with all mentioned details.

6Dr. V M Patel, Principal, SVBIT, Gandhinagar