Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 1 Peter Göttlicher, DESY For CALICE collaboration Chicago, June 11 th, 2011 A concept for.

Slides:



Advertisements
Similar presentations
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
Advertisements

Electronics for large LAr TPC’s F. Pietropaolo (ICARUS Collaboration) CRYODET Workshop LNGS, March 2006.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
HCAL heat dissipation and power management Rough ideas, calculations and numbers What is easy? Where are problems? Heat transfer Charge storage for pulsed.
Recent news about SiPM based applications R&D in DESY Nicola D’Ascenzo University of Hamburg - DESY.
   >>> 
18/05/2015 Calice meeting Prague Status Report on ADC LPC ILC Group.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
July 2003American Linear Collider Workshop Cornell U. Development of GEM-based Digital Hadron Calorimetry Andy White U.Texas at Arlington (for J.Yu, J.Li,
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
Peter Göttlicher | CALICE | Heidelberg, September 15 th 2011 | Page 1 Peter Göttlicher, DESY-FEB Heidelberg September 15 th, 2011 A concept for power cycling.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and.
A look at “Common” mistakes David Green Oklahoma State University
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
PCB Layout Introduction
L.Royer– Calice DESY – July 2010 Laurent ROYER, Samuel MANEN, Pascal GAY LPC Clermont-Ferrand R&D LPC Clermont-Fd dedicated to the.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
PCB Layout Introduction
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
S.Manen– IEEE Dresden – Oct A custom 12-bit cyclic ADC for the electromagnetic calorimeter of the International Linear Collider Samuel.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Peter Göttlicher | LC power workshop | Orsay, May 9 th 2011 | Page 1 EMI aspects for systems with train cycled operation: CALICE-AHCAL Peter Göttlicher.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Peter, Wieczorek - EE Low Noise Charge Sensitive Preamplifier Development for the PANDA Calorimeter Design and Measurements of the APFEL - Chip.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
1 Vertex-detector power pulsing CLIC Detector and Physics Collaboration Meeting, 02/10/2013 Cristian Alejandro Fuentes Rojas, PH-ESE-FE,
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
1 10 th October 2007Luciano Musa Considerations on readout plane IC Area (die size) 1-2 mm 2 /channel Shaping amplifier 0.2 mm 2 ADC0.6 mm 2 (estimate)
Peter Göttlicher, DESY, Prague Introduction: Parameters from accelerator, physics, detector - Physics prototype - System aspects: electromechanical.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
UCLA IEEE NATCAR 2004 SUMMER CLASS Magnetic Sensors & Power Regulation.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Investigation of crosstalk in the readout structure of the Beamcal K.Afanaciev.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
Front-End electronics for Future Linear Collider calorimeters C. de La Taille IN2P3/LAL Orsay On behalf of the CALICE collaboration
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
EUROTeV Diagnostics WP5
Calorimeter Mu2e Development electronics Front-end Review
Present Read Out Chain for the PANDA Barrel DIRC
CALICE meeting 2007 – Prague
HCAL task status report
CALICE COLLABORATION LPC Clermont LAL Orsay Samuel MANEN Julien FLEURY
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
BESIII EMC electronics
CALICE meeting 2007 – Prague
Beam Current Monitoring with ICT and BPM Electronics
Status of the EUDET Prototype
Presentation transcript:

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 1 Peter Göttlicher, DESY For CALICE collaboration Chicago, June 11 th, 2011 A concept for power cycling the electronics of CALICE-AHCAL with the train structure of ILC

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 2 Outline  Introduction: ILC, ILD, AHCAL for CALICE  Motivation for power cycling  Building blocks for power cycling  Summary

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 3 Accelerator and Detector for e + e - Technology: -Superdonducting cavitities 1.3 GHz -Bunch structure within trains 1ms long trains, 199ms break, …. bunch to bunch 337ns ILC: International Linear Collider e + e - collider with TeV e+e+ e-e- Collision point with detectors Technology: -High granularity calorimeters -e.g. CALICE-AHCAL-barrel 4 million readout channels 60 thousand channels per m 3 Need Option: For factor 100 by switching off the fast analogue electronics for 99.5% of the time Low power per channel: 40µW/channel can be reached by power cycling Introduction

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 4 Interconnects with flex foils for signals, GND and power AHCAL: Analog-Hadron- CALorimeter for ILD Scintillator tiles with SiPM readout Plugged to the back of a Readout board 12 x 12 tiles 36x36 cm 2 Cassette: 2.2m long structures: 864 channels Control electronics and power connections ASIC’s for - analogue signals, - local storage while train - ADC’s - data transfer Layer: composed out of 3 cassettes: 2600 channels Sampling sandwich with 48 layers each 3 mm scintillator mm electronics, infrastructure +12 mm stainless steel 3cm Introduction

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 5 Motivation: Power Cycling to avoid active Cooling With - Stainless steel - Long structure Heat Electronics with 1% power cycle 25µW/channel SiPM I dark +15µW/channel  Need Power cycling To keep heat up below C Simplified model: -No heat transfer radial “bad due to sandwich” -Cylindrical symmetry -Symmetry at IP-plane Mechanical design constraint: - No cooling within calorimeter to keep homogeneity and simplicity - Cooling only at service end Solution: Parabel + Fourier terms z = Position along beam axis [m] Temperature increase [K] Z=0m Z=2.2m Motivation

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 6 Building Blocks for the Power System 1. Planes with scintillators and SiPM’s, ASIC’s and PCB’s 4. Power supply 2. End of layer electronics DAQ is Optical: No issue for EMI 3. cable Building blocks

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 7 ASIC for fast SiPM Signals consuming Low Power Bunches from collider (ILC/CLIC): A train every 200ms Algorithm for power cycling: The ASIC switches the current of the functional blocks OFF. ASIC gets supplied all the time with voltage. PCB electronics and instruments stabilize the voltage L. Raux et al., SPIROC Measurement: Silicon Photomultiplier Integrated Readout Chips for ILC, Proc IEEE Nuclear Science Symposium (NSS08) Functional tasks of the ASIC: -Amplify the SiPM signal and generate self trigger -Store an identified signal: 16 per train: capacitor pipeline -Digitize -Multiplexed data transfer even with more ASIC’s 0.5% needed ADC Digital data transfer RAM ASIC: SPIROC-2b SiPM Amp. Fast amplifiers: 1ms ADC’s 3.2ms Common analogue parts, e.g. DAC’s, C-pipeline Digital control: 150ms >20µs ON before train 1µs Building blocks Power ON for:

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 8 ASIC as current switch Measurements: - Inductive current probes Slow: 0.25 – 50MHz Fast: 30MHz-3GHz - Setup: ASIC+ capacitors on a PCB - Expectation is ~ 1mA/channel ~40mA/ASIC, summed over all pins GND pin (1 of 2) of ASIC Expected waveform, Amplitude is arb. units. High pass of probe Measured currents at the GND-supply of ASIC Slow probe Fast probe GND pin (1 of 2) of ASIC Voltage pin (1 of 3) for preamplifier Tantal capacitor [ns] time [ns] time System has to deal with: EMI: electromagnetic interference -5Hz from train repetition to few 100MHz -2.2A for a layer, 3.4kA for AHCAL-barrel Building blocks

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 9 Current loops To do: -Controlling return currents -Keeping loops small -Avoid overlapping with foreign components. Capacitive coupling To do: -Keep common mode voltage stable -Guide induces currents to source -Keep GND-reference closer than foreigns Electro Magnetic Interference in a Power Cycled System Reference ground : -Need good definition -Any induced/applied current produces voltage drops -Separation between reference / power return / safety or controlling currents and keeping currents within “own” volume and instrumentation Guideline: Avoiding emission avoids in most cases picking up of noise reference return Safety. PE Building blocks

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 10 Keeping the high Frequencies local 36 x 36 cm PCB with scintillators, SiPM’s LED 144mA switched current Part of a thin cassette between absorber layer of HCAL GND d PCB = 50-60µm Vsupply GND Layer structure of PCB: By that one get -a thin PCB and also -A good high frequency capacitor 60pF/cm 2 -Layout with short distance to via maintain the performance. Simulation model: “two diomensional delay line” 1cm x 1cm Building blocks

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 11 Tantal Voltage for ASIC stabilized by local discrete Capacitors Total: 12 Tantal/4 ASIC’s + 17 ceramics + PCB PCB, alone Tantal, AVX, 33µF Murata, 100nf Murata, 10nf Murata, 2.2nf Murata, 1nf Ceramics X7R 1kHz 1MHz 1GHz Impedance Z=|U|/|I| Frequency U to I phase shift 0 ASIC is supported over wide frequency range with Z< 0.1  144mA generates <20mV Oscillations are dumped for wide frequency range with phase  ±90 0 Trust in simulation: - <1.5GHz=(1/10) granularity - No resistive behavior of ASIC is included. That over estimates the resonances at high frequencies Result: - Locally good for > 10kHz - Additional effort < 10kHz 0.1  1  10  100  00.1  Capacitors mounted to the 36x36cm 2 PCB Simulation of voltage induced by current ceramic PCB-layer Dominated by: Capacitor like Coil like Building blocks

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 12 Low frequency charge storage for < 10kHz At end of layer, there is a bit of - space - cooling C2C2 C3C3 Building blocks

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 13 Definition of GND-point: - good for keeping sensitive SiPM’s stable - single connection to reduce currents in GND PE system Voltage at ASIC: Measurement Control electronics for layer Reduced test setup: Control board, 1 interconnect, 1 board Tantal taken away Default setup Tantal moved to control boar d Power on Command, step in I ASIC Supply voltage of ASIC (AC-component) [mV] GND electronics 2m 2 /Layer 1.3mm distance C=13nF 4mV Stainless steel absorber = GND PE  OK, even with extrapolation to 1500 layers low? Investigations of reason and improvements possible, to be watched Time [ns] Voltage step: - Measured 4mV, 400ns - Extrapolate to full system < 80mV at far end OK for operation, over-,undervoltage, time, … Induces current into GND PE, if step is on GND electronics < 2 mA per layer Building blocks

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 14 Integrating to Infrastructure 70pF/m from cable to support ASIC as switched current sink 50m cable, 1mm 2, on a cable support [ms] 6 time nA Current per layer Current induced into GND PE Simulation of cable Impact of cable is a combination of choises: -Input filter: R=10 , C=1mF reasonable mechanical size EMI better  =100ms -Power supply behavior here neglected capacitance to PE, might be 2 order of magnitude larger than cable! Here: ideal V-source -Mechanical integration and galvanic isolation per (group or) layer and pair of wires for it With 1500 layers of AHCAL: I PE =120  A Really small, but not including all parasitics! Don’t be too reluctant in EMI-rules Building blocks

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 15 Current in Supply Cable Control electronics for layer Reduced test setup: Control board, 1 interconnect, 1 board, Short cable to laboratory supply Current per 1/18 layer in supply cable [mA] Preamplifiers ON ADC’s ON Work bench settings Without input filter with input filter  =10ms Input filter important to lower amplitude fluctuations and remaining frequencies within cable Inportant: EMI-crosstalk to others Frequencies are low Electronics like to have larger  to smoothen further  Mechanics easier in service-hall Building blocks

Peter Göttlicher | TIPP 2011 | Chicago, June 11 th 2011 | Page 16 Summary  Detectors for Linear Colliders requires many channels with low power  Train structure allows 99% time to be OFF: Factor 100 in critical regions  Coherent fast switching ON/OFF of high current: CALICE-AHCAL: 2.2A*layers : 3.4kA for the barrel 5Hz to few 100MHz  System aspects at local design - Local defined return-pathes for current - Local charge storage for wide frequency range that keeps - the impedance small - the currents leaving a defined volume small with slow rise times  System aspects within the infrastructure Lower frequency part handled by cables and power supply Good integration of power supplies and cables.  Simulation leaves many parasitic effects out Underestimates the high frequency EMI-disturbance …. Experiments, concepts to be better than simulation promises  Experimental setups and integration into ILD to be continued