Legal and Related Challenges of Funding Infrastructure Projects in Emerging Economies Challenges in Meeting Public Sector Financing Needs: Financing Key.

Slides:



Advertisements
Similar presentations
Organised by Civil Service College, Dhaka Md. Abu Rashed Senior Consultant (PPP) Infrastructure Investment Facilitation Center 18 February 2012 PPP Frameworks.
Advertisements

Instruments and development needs
Financing Essentials for Public-Private Partnerships United Nations SU/SSC Training Course September 19, 2006.
PUBLIC PRIVATE PARTNERSHIP (PPP) CONTRACT MANAGEMENT
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
Introduction to Public Private Partnerships
Public Debt Management with emphasis on PPP 1 Ministry of Finance 08 th Dec 2014.
Overview and Principles for Implementing State PPP (P3) Legislation Presented at the NCPPP P3 Connect Denver, Colorado Conference By Jim Reed, Group Director.
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
Simon Par Keeling, Société Générale Paris
SUSTAINABLE FUNDING OPPORTUNITIES FOR START-UPS
What is the ADF Partial Risk Guarantee? Partial Risk Guarantees (PRGs), also known as political risk guarantees, cover private lenders and investors against.
PPP’s IN NIGERIA: Prospects in the Water Sector
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU The Private Sector Perspective on PPP Projects/Concessions.
Organised by Civil Service College, Dhaka Nazrul Islam Executive Director and CEO Infrastructure Investment Facilitation Center 11 February 2012 Basics.
Phases of A BOT Project Prepared By :Afaf Bu-khawa Course title: Technology Implementation,MGT 620.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
PPP FINANCING ARRANGMENTS – STRUCTURING FINANCE SUCCESSFULLY IMTIAZ HIZKIL ISLAMIC DEVELOPMENT BANK.
Financing Urban Public Infrastructure
IFC Power March 2009 Sarajevo, Bosnia and Herzegovina.
INVESTMENT AND FINANCING OF RENEWABLE ENERGY PROJECTS
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
Africa Rail 2009 Workshop 23 June 2009 Different Types of Financing for Mobile Equipment Greg McKenzie Head of Asset Finance, Investment Banking Division,
Lecture 12 Lease Financing. It has emerged as a supplementary source of financing. Increase in off-balance sheet methods of financing. Increase in scope.
ProFina - Project and Private Finance Feb 2002 Whither Private Sector Participation? Private Investment in the Utility Industries – Energy, Transport,
Policies in promoting private finance For Local Government Infrastructure Washington, 01 October 2004 Policies in promoting private finance For Local Government.
Post-Crisis Growth and Poverty Reduction in Low-Income Asia Experiences with Public-Private Partnerships Mark Johnson Hanoi, 22 March 2010.
The main Legal and Business Aspects of: Public Private Partnerships (PPPs) by Alexander Lykourezos Lykourezos Law Offices Belgrade, May 11 th, 2006.
Financing of Infrastructure Projects:
Privatizing for the Public Good “Role of Professional Advisors to State DOTs” April 27, 2007 Thomas W. Bradshaw, Jr. Managing Director Co-Head of Transportation.
An Introduction to Public Private Partnerships: Why Government needs to work with the private sector Vilnius 22 nd November 2006 Stephen Harris - Head,
Fifth Astana Economic Forum Dr. Anand Chiplunkar Director, CWUW Central and West Asia Department 22 May 2012.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
PPP International Best Practice and Regional Application Overview of Public Private Partnerships (PPPs) April, 2008 Tegucigalpa, Honduras Filip Drapak.
Building Blocks for a Successful Public- Private Partnerships Presented by Igor Abramov Counsel & Co-chair, Eurasia and Russia Practice Group, Heenan Blaikie.
Challenges in Meeting Public Sector Financing Needs – Financing Key PPP Projects. A Paper Delivered at the 2008 Perchstone & Graeys Annual Lecture by Jide.
Financing for Development United Nations Risk Mitigation for Mobilizing Private Sector Investments in Infrastructure in Developing Countries Pradeep Singh.
Doing Business With OPIC. OPIC’s Mission Statement “To mobilize and facilitate the participation of the United States capital and skills in the economic.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Selecting and Designing Concession / PPP Projects Martin Darcy.
:: February 2005 :: :: presentation to :: Global Water PPPs : Meeting the Challenge Richard M. Temple Hogan & Hartson One Angel Court London EC2R 7HJ Tel:
Public Private Partnerships (PPPs) and The World Bank
Service delivery in the energy sector: Increasing private sector investment in generation & access PPPs in energy sector in Africa: Best practices and.
By PATRICK MABUZA SOUTH AFRICAN ECONOMIC REGULATORS CONFERENCE Institutional Arrangements Necessary for Private Sector Investment in Infrastructure 21.
Inter-American Development Bank Private Sector Financing and the IDB Presentation by the IDB Private Sector Department February 2004.
1 APPLICATION ON THE SPANISH CONCESSIONAL MODEL TO CENTRAL AND ESTERN EUROPE WORLD BANK WORKSHOP ON PPP IN HIGHWAYS: INSTITUTIONAL, LEGAL, FINANCIAL AND.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
European Investment Bank Jaime Barragan EIB – European Investment Bank IADB, 8-9 December 2005 Basic concepts Jaime Barragan EIB – European Investment.
Track 4 Building Sustainability: Partnerships and Finance Global Environment Facility – International Waters Second Biennial Conference September 25-29,
European Bank for Reconstruction and Development Financing Renewable Energy Projects in Bulgaria Anton Kobakov Senior Banker RO Sofia, Bulgaria.
Principles of Risk Allocation, Part 1 Brian Chase CLC 1030.
Definitions and objectives of public private partnerships (PPPs) Annemarie Mille.
Dr. Steven Van Garsse PPP Unit Flemish Department for the General Government Policy.
Jacobs Aston Conference 2009 The vital role of local government and PPP capital programmes Chris Wilson Executive Director 4ps 30 th April 2009.
Budget Workshop Capital Improvement Plan Presentation on Public Private Partnership and Strategy for Municipal Complex, HWY 50, and Coast to Coast Trail.
The future of the capital markets in Guyana
PPPs and Public Procurement
Finding the Revenue Stream to Make P3s Work
Presentation to the Public-Private Partnerships in Highways Workshop
The public – private continuum
UNCITRALThird International Colloquium on Public-Private Partnerships (PPPs) October 2017, Vienna Experts for Chapter IV October 2017.
A bank’s perspective on PPP projects
ASEAN PPP Summit The Public-Private Partnership Model and
Toolkit for Public-Private Partnership in Highways
PUBLIC PRIVATE PARTNERSHIPS KERJASAMA PEMERINTAH SWASTA
Build operate and transfer project delivery System in Saudi Arabia
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
The Government Role in BOT
a. Financing b. Designing c. Construction d. Operating
The Role of Private Sector in Capital Budgeting
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
Presentation transcript:

Legal and Related Challenges of Funding Infrastructure Projects in Emerging Economies Challenges in Meeting Public Sector Financing Needs: Financing Key PPP Projects Perchstone & Graeys Annual Law Seminar Lagos, 25th April 2008 Opuiyo Oforiokuma CEO/Managing Director

About Lekki Concession Company LCC’s mission is to provide high quality road infrastructure and related services along the Lekki Peninsular of Lagos, Nigeria, and to be recognized as the pioneer for change in the way road infrastructure is delivered throughout Nigeria Lagos Infrastructure Project (LIP), the first PPP Toll Road Concession in Nigeria, is already in the process of execution LCC is an initiative of the ARM Group, which has a broad-based ambition to develop major infrastructure projects throughout Nigeria and West Africa ARM Group is a leading player in the Nigerian asset management sector, with approximately NGN147 Billion under management

About Our Project Scope Funding Toll Concession Period Public-Private Partnership with Lagos State, to design, build, finance and operate: Phase I - Lekki Epe Expressway (49.4 km) Phase II - Coastal Road (20km) plus option to do the Southern Bypass Funding Financed by the Concessionaire, LCC, on a limited-recourse basis. Estimated project cost during construction is $300 Million Toll Concessionaire will collect tolls and charges on the Concession Roads to recoup cost of investments Concession Period 30 years

Typical Emerging Market Financing Challenges Viewed as high risk; hence, difficult to attract capital to them at all, or at reasonable cost – there is global competition for investment funds General lack of local understanding of the various infrastructure models and what they entail – affects both public and private sectors, and civil society at large Lack of skills and experience in key areas, eg, deal development/packaging, project structuring/financing, and major project management/execution Under-developed financial/banking sector, lacking experience in project financing of major infrastructure transactions Lack of enabling legislation and/or non-existent/weak regulatory institutions Political instability and/or lack of continuity Economic instability and/or poor track record of management Corruption, lack of transparent procurement processes, and lack of adherence to the rule of Law

Typical Stages in Infrastructure Development & Delivery The process to financial close has been known to take years, especially in emerging economies where little or no track record exists DEVELOPMENT PPP PROCUREMENT NEGOTIATION & AWARD DEAL STRUCTURING & FINANCING PROJECT EXECUTION Opportunity identification Opportunity evaluation (feasibility studies, EIA/Social Impact studies, due diligence, etc) Review/establish regulatory framework Determine PPP Model to use Procurement process (can be open tender or negotiated) Bidding and selection of PPP Partner Agree and negotiate final PPP contractual terms Develop capital structure Arrange financing (equity, debt, etc) Financial close Construction programme Operation & Maintenance Service Delivery Asset transfer at end LEGISLATIVE / REGULATORY FRAMEWORK The 1st two stages are sometimes combined or reversed, especially in negotiated deals

General Overview of The PPP Model PPPs involve collaboration between the Public Sector and the Private Sector Usually for the construction and/or management of a specific asset or a group of assets Helps to assign risk to the partner best equipped to deal with it Helps to secure specialist skills and experience not readily available in the Public Sector, for public interest projects Enables Public Sector funds to be used for other programs, where private sector financing is part of the PPP package Various Models of PPP exist Service contracts, Operations & Maintenance Contracts, etc Concessions – transfers the rights to develop and operate defined assets, within a defined area, over a defined term Other PPP models include PFI, BOT, BOOT, DBFO, DBF, etc They should not be confused with “privatization”, which involves a transfer of ownership of the assets (eg, through the sale of shares) PPPs are common in asset intensive and/or Utility type industries, eg, Roads, Water, Power, Airports

Balancing Project Risks & Returns is Key Project returns must be commensurate with the risks involved otherwise knowledgeable investors will be unwilling to participate in the project Economic Risks eg, unstable FX rates, high inflation Political Risks eg, political instability, lack of continuity Legal Risks eg, lack of respect for contract, ineffective judiciary, absence of key legislation, litigation culture Financial Risks eg, loan tenors too short, loan rates too high, onerous loan conditions, lack of insurance cover Revenue Risks eg, rigid price controls, uncertainty over volumes Technical & Operating Risks eg, unfamiliar environment, lack of experience & skills, technology failure Regulatory Risks eg, lack of transparency, weak institutions, rigidity/overzealousness, highly politicized Note: Risks shown are not an exhaustive list

Effective Regulation Requires Balance Regulation typically covers economic (eg, price-setting, ROI), and technical/operational matters (eg, performance standards, investment programmes) The drivers, however, do not always pull in the same direction, at the same time, in the same way, and with the same amount of force Regulation should be transparent, fair, balanced and apolitical Interests of the key stakeholders should be balanced over the long- term CONCESSIONAIRE POLITICAL/REGULATORY DRIVERS eg, provision of essential infrastructure, standards, government policy CUSTOMER DRIVERS eg, affordability, value for money, quality and consistency of service COMMERCIAL / INVESTMENT DRIVERS eg, return on investment, risk management

Understanding Project Risk is Critical Risk is an indication/measure of uncertainty and unpredictability Identifying, managing and/or eliminating risk is critical in any project – this is a skilled exercise, supported by thorough due diligence A fundamental element of structuring and executing infrastructure projects is the allocation of risk to the parties best able to deal with them – normally done through contract Various instruments, eg, insurance, interest rate/currency hedges, etc, can be purchased to help lay-off risk to 3rd parties willing to underwrite them TYPICAL BOT PROJECT

Conceptual Project Financing Structure Concessionaire Equity Investors Lenders Insurance Revenues from Operations Investors & other Providers of Capital Risk Management & Protection Project support, eg, Bonds & Guarantees Key consideration is how risk is distributed across the financing structure (“recourse”) Financing agreements will document the roles and relationships across the structure

Contractual Framework: Lekki Toll Road Concession Sponsors

Project Credibility & Bankability In developed economy environments, well researched and structured projects, backed by credible, experienced players, are usually easier to finance Experienced Concession & Project Manager Turnkey D&C Contractor + Maintenance Financial Structure Technical and Engineering Govt. Support & Commitment + Enabling Legislation (2004 Lagos Roads Law) Legal & Regulatory Expertise Committed Sponsors Financial Advisors & Arrangers (robust financial model) * Debt/Equity Mix * Tenor * Currency * Feasibility * EIA/SIA Studies * Tolling Strategy * Surveys * Design

Key Project Financing Considerations Efficient project financing utilizes a mix of financing sources to achieve the optimum balance between equity investors, lenders and other providers of capital – Share Capital, Loans, Mezzanine Finance, Grants, etc Long loan tenors (15 years or more ideally) are key to the financing of major infrastructure The cost of long term financing must be reasonable and commensurate with the risk of the relevant project – providers of finance need to understand how to properly price risk so as not to overburden the project Concessionary financing from governments, multi-lateral agencies, and other similar institutions can help to significantly bring down the cost of financing and improve project economics and bankability There should be adequate security for both lenders and investors, however, this does not mean “asking for everything plus the kitchen sink” Where the market exists, and it is cost effective to do so, it is advisable to hedge against some risks, eg, currency fluctuation (where foreign currency financing is used) and interest rates (where they are floating) Flexibility to repay loans early at zero or minimal exit cost, will facilitate refinancing later on (eg, through a bond issue) when the project risk profile has diminished and returns are stable Take out appropriate insurance cover if you can get it – “a stitch in time saves nine”

THANK YOU