Status of the Software and MC production Antoine Cazes Laboratoire de L’accélérateur Linéaire.

Slides:



Advertisements
Similar presentations
May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of.
Advertisements

Oscillation Project with Emulsion tRacking Apparatus F. Juget Institut de Physique Université de Neuchâtel Neutrino-CH meeting, Neuchâtel June
Muon Identification Antoine Cazes Laboratoire de l’ Accelerateur Lineaire OPERA Collaboration Meeting in Frascatti Physics coordination meeting. October.
Emulsion scanning: present status and plans for the coming run Giovanni De Lellis.
CHORUS Collaboration Meeting, Ishigaki, Japan/ April 2003 MC productions and data/MC JETTA and specific generators Eficass and CHANT Data/MC comparison.
1 Event selection / characterization software package (OpCarac) Alessandro Bertolin (INFN - Padova) Ngoc-Tiem Tran (IN2P3 - Lyon) Special thanks section:
Brick Finding Ankara CM 2/4/2009 Dario Autiero. A large effort was put in the last months by a team of people in order to recover the events pending due.
IMPACT OF WATER OPTICAL PROPERTIES ON RECONSTRUCTION: HINTS FROM THE OB DATA. A PRELIMINARY STUDY ANTARES Collaboration Meeting CERN, February 07 th -10.
Status of MC software S.Dusini – INFN Padova 2/4/2009Stefano Dusini1.
Sci Fi Simulation Status Malcolm Ellis MICE Meeting Osaka, 2 nd August 2004.
OPERA 2008 run: a report from the Swiss scanning lab Ciro Pistillo LHEP Bern university for the Swiss scanning team OPERA Collaboration meeting Ankara,
October 20th, 2006 A. Mazzacane 1 4 th Concept Software First Results.
Physics coordination 21/1/09 D.Autiero, S.Dusini Introduction.
1 Status of Located Event Analysis On behalf of Nagoya Scanning Group Umut KOSE OPERA Emulsion Workshop, January 2008, Nagoya, JAPAN.
MonteCarlo simulation of neutrino interactions in PEANUT Giovanni De Lellis on behalf of Alberto Marotta and Andrea Russo Naples University.
Simulation of a Magnetised Scintillating Detector for the Neutrino Factory Malcolm Ellis & Alan Bross Fermilab International Scoping Study Meeting KEK,
Tracker Reconstruction SoftwarePerformance Review, Oct 16, 2002 Summary of Core “Performance Review” for TkrRecon How do we know the Tracking is working?
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
I have made the second half of the poster, first half which is made by tarak will have neutrino information. A patch between the two, telling why we do.
A. Zylberstejn1Workshop D0 Praha D 0 Saclay activities 99  People  Computers  Activities  hardware  software.
9/26/11HFT soft meeting, BNL1 Chain analysis fz file MuDst.root minimc.root geant.root event.root McEvent.root StMiniMcMaker StAssociationMaker : STAR.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
GlueX Software Status April 28, 2006 David Lawrence, JLab.
OPERA Experiment, Brick Finding Program A. Chukanov Joint Institute for Nuclear Research ISU, 12 th February, 2007.
Javier CastilloLHC Alignment Workshop - CERN - 05/09/ Alignment of the ALICE MUON Spectrometer Javier Castillo CEA/Saclay.
TWIST A Precision Measurement of Muon Decay at TRIUMF Peter Kitching TRIUMF/University of Alberta TWIST Collaboration Physics of TWIST Introduction to.
CHEP06, Mumbai-India, Feb 2006V. Daniel Elvira 1 The CMS Simulation Validation Suite V. Daniel Elvira (Fermilab) for the CMS Collaboration.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
JLab hypernuclear collaboration meeting / JSPS Core to Core Seminar TOSCA models for ENGE and other spectrometers 9May2012 – 11May2012 Department of Physics,
Status report on the Asian Solid State Tracking R&D March 31, 2003 M. Iwasaki University of Tokyo.
1 Calorimeter in G4MICE Berkeley 10 Feb 2005 Rikard Sandström Geneva University.
Software tools and Computing Akiya Miyamoto KEK 29-September-2006 At FJPPL meeting.
Detector Monte-Carlo ● Goal: Develop software tools to: – Model detector performance – Study background issues – Calculate event rates – Determine feasibility.
The CMS Simulation Software Julia Yarba, Fermilab on behalf of CMS Collaboration 22 m long, 15 m in diameter Over a million geometrical volumes Many complex.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting Rutherford Appleton Lab Tuesday 25 th April 2006 M. Ellis.
May 31th, 2007 LCWS C. Gatto 1 Tracking Studies in the 4 th Concept On behalf of 4th Concept Software Group D. Barbareschi V. Di Benedetto E. Cavallo.
Brick Finding Package – Status Report A. Chukanov, S. Dmitrievsky, Yu. Gornushkin Joint Institute for Nuclear Research, Dubna LNGS 11 th October, 2006.
05/04/06Predrag Krstonosic - Cambridge True particle flow and performance of recent particle flow algorithms.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
04/04/2008LNGS, OPERA Collaboration Meeting1 Simulation/Reconstruction Software activity of JINR group /Dmitry V.Naumov A.Chukanov, S.Dmitrievsky, Yu.
The DONuT Experiment Observations of the Tau Neutrino Presentation by Suzanne Nichols.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
OPERA Experiment, Brick Finding Program A. Chukanov Joint Institute for Nuclear Research Dubna, 25 th January, 2007.
Progress Report on GEANT Study of Containerized Detectors R. Ray 7/11/03 What’s New Since Last Time?  More detailed container description in GEANT o Slightly.
Software and Computing Status of Software development and MC production OpRoot-Fedra MC interface New CVS server Computing resources at CERN: present and.
Status of OpRec Antoine Cazes Laboratoire de l’ Accelerateur Lineaire OPERA Collaboration Meeting in Frascatti Physics coordination meeting. October 28.
Software Week - 8/12/98G. Poulard - CERN EP/ATC1 Status of Software for Physics TDR Atlas Software Week 8 December 1998 G. Poulard.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
STAR Simulation. Status and plans V. Perevoztchikov Brookhaven National Laboratory,USA.
A. SarratILC TPC meeting, DESY, 15/02/06 Simulation Of a TPC For T2K Near Detector Using Geant 4 Antony Sarrat CEA Saclay, Dapnia.
From the simulation to the reconstruction: The FEDRA-MC interface Alberto Marotta University FEDERICO II & INFN - Napoli OPERA CERN, April 2004.
A New Upper Limit for the Tau-Neutrino Magnetic Moment Reinhard Schwienhorst      ee ee
2008 European School of High-Energy Physics - Trest, Czech Republic - 19 August - 1st September Target Tracker Data Analysis In OPERA Experiment S. Dmitrievsky,
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
BESIII offline software group Status of BESIII Event Reconstruction System.
BES III Software: Beta Release Plan Weidong Li 19 th October 2005.
21/5/03J.E Campagne Opera Framework: Status Report.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
Electromagnetic shower reconstruction with emulsion films in the OPERA experiment F. Juget IPH Université de Neuchâtel On behalf of the OPERA collaboration.
Experience from Antoine Cazes, nuFact’08 Valencia
Huagen Xu IKP: T. Randriamalala, J. Ritman and T. Stockmanns
Status of the OPERA experiment
OPERA Stato dell’esperimento Run 2007
Results from OPERA Pablo del Amo Sánchez for the OPERA collaboration
E. Barbuto, C. Bozza, A. Cioffi, M. Giorgini
OPERETTE TEST BEAM EXPERIMENT :
Linear Collider Simulation Tools
Detector Optimization using Particle Flow Algorithm
Presentation transcript:

Status of the Software and MC production Antoine Cazes Laboratoire de L’accélérateur Linéaire

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Analysis The Software chain Beam Files OpRoot OpRec OpTreeConvert Simulation Files Reconstructed Files OpDigit OpSym: OpGeom, OpVMC Available for the summer Used for the present MC production OpNtuple MyAna

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Software Status OpROOT(D.Duchesneau) Test have been performed Problem for neutral charmed particle fixed Few improvements OpDigit No Changes OpRec(AC, JEC) Pattern : No Changes Tracking: Tentative of including the tracking in the spectrometer. But it is not working Old version is used : use MC information for initialization of the track ending in a Spectrometer

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Tracking in the spectrometer: Tracking in the Spectrometer: Kalman filtering parabolic include matter effect. include magnetic field It has been coded. X-Y reconstruction Slope reconstruction Momentum reconstruction OK Diverge!!!

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Temporary Solution Use of the old Kalman filtering Tracking in the Target Tracker. Kalman filtering including matter effect initialization with fit on the first points Track going through the spectrometer initialization using MC information Tracking done only in the first hit TT Already more realistic, since pattern do not use any MC information.

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Result : X-Y resolution (  CC event) Previous Tracking * New Tracking RMS =  12mm 8mm RMS =  16mm 9mm Xtrue - Xfit Ytrue - Yfit * OPERA-NOTE 36 Xtrue - Xfit Ytrue - Yfit

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Results : Slope resolution (  CC event) Previous Tracking * New Tracking RMS =  37mrad 14mrad RMS =  47mrad 17mrad * OPERA-NOTE 36 Atrue - Afit Btrue - Bfit Atrue - Afit Btrue - Bfit

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes OpNtuple (A.Marotta) OpNtuple is a converter from the official output of the software chain to Hbook files It is available on cvs (v2) Derived from MyAna For compatibility reason, the information stored are (almost) the same as in the previous Ntuple production (may 2001)

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes The Hbook file containt * /MCINFO/ * NUMEVT event id number * /MCINFO/ * ENEUTRI neutrino energy [0,3] * /MCINFO/ * VERT number of vertexes * /MCINFO/ * InPart(VERT) incoming particle * /MCINFO/ * XVTX(VERT) x,y,z of the interaction vertexes * /MCINFO/ * YVTX(VERT) * /MCINFO/ * ZVTX(VERT) [1,132] * /MCINFO/ * IPLBEST 1-62 wall number if vertex in brick 1-31 sm=1; sm=2) 64 interaction before the first sm 66 interaction in the 1st spec zone 68 interaction in the 2nd spec zone wall number if vertex in TT sm=1; sm=2  Monte Carlo information

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Muon information [0,3] * /MCMUON/ * NMUONSnumber of (anti)muons generator level * /MCMUON/ * GeantCode(NMUONS)geant code of the (anti)muon * /MCMUON/ * energy(NMUONS) * /MCMUON/ * PXMUON(NMUONS) * /MCMUON/ * PYMUON(NMUONS) * /MCMUON/ * PZMUON(NMUONS) * /MCMUON/ * MUONVTX(NMUONS) link with vtx (1,2,3) * /MCMUON/ * XMUT(NMUONS) last hit coordinate in the TT * /MCMUON/ * YMUT(NMUONS) * /MCMUON/ * ZMUT(NMUONS) * /MCMUON/ * PXMUT(NMUONS) * /MCMUON/ * PYMUT(NMUONS) * /MCMUON/ * PZMUT(NMUONS) * /MCMUON/ * XMUS(NMUONS) last hit coordinate in the spect * /MCMUON/ * YMUS(NMUONS) * /MCMUON/ * ZMUS(NMUONS) * /MCMUON/ * PXMUS(NMUONS) * /MCMUON/ * PYMUS(NMUONS) * /MCMUON/ * PZMUS(NMUONS) [0,1000] * /MCOTH/ * NOTH number of particle generator level (no mu) * /MCOTH/ * CODOTH(NOTH) Geant Code of the particle * /MCOTH/ * PXOTH(NOTH) * /MCOTH/ * PYOTH(NOTH) * /MCOTH/ * PZOTH(NOTH) * /MCOTH/ * OTHVTX(NOTH) link with vtx (1,2,3) * /MCOTH/ * ENOTH(NOTH)

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Last emulsion sheet information [0,150] * / LASTES/ * NLASTESnumber of hits in the last sheet of the interaction brick * /LASTES/ * IndexLastes(NLASTES)index * /LASTES/ * IDLASTES(NLASTES)Geant Code of the particle * /LASTES/ * IDNUMBLASTES(NLASTES) Brick Id 10000*WALL+100*COLUMN+RPW (WALL:1-62) * /LASTES/ * XLASTES(NLASTES) * /LASTES/ * YLASTES(NLASTES) * /LASTES/ * ZLASTES(NLASTES) * /LASTES/ * PalphaXLASTES(NLASTES) alphaX * /LASTES/ * PalphaYLASTES(NLASTES) alphaY * /LASTES/ * MODPLASTES(NLASTES)momentum [0,1000] * /STRIPS/ * NSTRIPSnumber of strips * /STRIPS/ * IndexTT(NSTRIPS)index * /STRIPS/ * XSTR(NSTRIPS) * /STRIPS/ * YSTR(NSTRIPS) * /STRIPS/ * ZSTR(NSTRIPS) * /STRIPS/ * NUPLSTR(NSTRIPS) Id SM* WALL*1000+BOX*100+BAR * /STRIPS/ * ESTRL(NSTRIPS) number of photons left side * /STRIPS/ * ESTRR(NSTRIPS) number of photons right side [0,1000] * /STRIPS/ * LKMUSTR(NSTRIPS)link with primary muons 0 if no muon linked +1 if a hit in the dgt by muon from vtx if a hit in the dgt by muon from vtx if a hit in the dgt by muon from vtx 3

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Detector information [0,800] * /TUBES/ * NTUBES * /TUBES/ * IndexDT(NTUBES)index * /TUBES/ * IDTUBE(NTUBES) 100*SM+PLANE * /TUBES/ * XTUBE(NTUBES) * /TUBES/ * ZTUBE(NTUBES) [0,1000] * /TUBES/ * LKMUTUBE(NTUBES)link with primary muons [0,1000] * /SRPC/ * NHSRPC number of hit * /SRPC/ * IDHSRPC(NHSRPC)geant code of particle-hit * /SRPC/ * EHSRPC(NHSRPC) * /SRPC/ * PLHSRPC(NHSRPC)1000*SM+100*halfSRPC+plane * /SRPC/ * XHSRPC(NHSRPC) * /SRPC/ * YHSRPC(NHSRPC) * /SRPC/ * ZHSRPC(NHSRPC) [0,1000] * /SRPC/ * NRSRPCnumber of reconstructed hit * /SRPC/ * IndexSRPC_H(NRSRPC)index of H dgt of the rec hit * /SRPC/ * IndexSRPC_V(NRSRPC)index of V dgt of the rec hit * /SRPC/ * XSRPC(NRSRPC) * /SRPC/ * YSRPC(NRSRPC) * /SRPC/ * ZSRPC(NRSRPC) * /SRPC/ * IDPLSRPC(NRSRPC)1000*SM+100*halfSRPC+plane [0,800] * /XPC/ * NHXPC number of hit * /XPC/ * IDHXPC(NHXPC) geant code of particle-hit * /XPC/ * EHXPC(NHXPC) * /XPC/ * PLHXPC(NHXPC) 100*SM+plane * /XPC/ * XHXPC(NHXPC) * /XPC/ * YHXPC(NHXPC) * /XPC/ * ZHXPC(NHXPC)

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Detector information and tracking [0,800] * /XPC/ * NRXPC number of reconstructed hit * /XPC/ * IndexXPC_U(NRXPC) index of U dgt of the rec hit * /XPC/ * IndexXPC_V(NRXPC) index of V dgt of the rec hit * /XPC/ * XXPC(NRXPC) * /XPC/ * YXPC(NRXPC) * /XPC/ * ZXPC(NRXPC) * /XPC/ * IDPLXPC(NRXPC) 100*SM+plane * /TRACK/ * NTRACK Number of Track * /TRACK/ * NDIM(10) Dimention of the fit of track i (2 or 5) * /TRACK/ * NTT(10) Number of TT hit in the track * /TRACK/ * IDTT(150,10) IDTT(i,j) Index of the TT hit i of track j * /TRACK/ * NSRPC(10) idem for SRPC * /TRACK/ * IDSRPC(150,10) * /TRACK/ * NSDT(10) idem for DT * /TRACK/ * IDSDT(150,10) * /TRACK/ * PARA(5,10) PARA(i,j) result of the fit of track j * /TRACK/ * VARI(15,10) Variance Matrix of the fit of track j VARI(.,it): element of the Variance Matrix. In case of 5 Parameter fit the storing in the following Vxx Vxy Vxa Vxb Vxd Vyy Vya Vyb Vyd Vaa Vab Vad = Vbb Vbd Vdd 15 PARA(k,i): kth parameter fit at First TT Point of Track i 5Dim Model: (x,y,a=px/pz,b=py/pz,d=q/p) 2Dim Model: (x,a) or (y,b)

Monte Carlo Production

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Production Status December 2003 production was not perfect We started a new production (may 2004) Input Beam Files from may2001 Vertices only in lead. Tracking is included. Already 10,000 or 5,000 events of type:  CC  NC Tests are under going to check the quality.  ntuple is investigated Full production as soon as checks are OK  e  e QE   QE

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes File location: Files are stored on the CASTOR area: /castor/cern.ch/opera/mc/prodmay2004/ simul/ : ouput of the simulation digit/ : output of the digitization reco/ : output of the Reconstruction: ntuple/ : output of the Hbook converter  File name structure : numucc1_reco_1.root Type of event Beam file number (1-3) Level in the chain (simul, digit, reco) Simulation file number (1-6 for one Beam File)

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Crash problem OpRec and OpNtuple experience crashes for big files when running in batch. Apparently, there is a memory problem, in the OpIO package, maybe memory leak Test using dedicated debuging software are foreseen. Purify Insure Does not stop the production (just slow down ) Temporary solution: number of event/file limited to less than 3000.

OPERA collaboration meeting - 5th of june 2004 Antoine Cazes Documentation An html documentation is being written. For each package, it will contain information about: Installation Contents Action Input and Output Documentation about FEDRA already available.