POTENTIAL OF THE WIDEBAND TRANSVERSE DAMPER G. Kotzian on behalf of HBTFB team G. Kotzian, LIU-2013, April 12, 2013.

Slides:



Advertisements
Similar presentations
IPAC10, Kyoto, Japan, May 23-28, 2010 E-cloud feedback simulations - Vay et al. 1 Simulation of E-Cloud driven instability and its attenuation using a.
Advertisements

BEAM STABILITY IN SYNCHROTRONS WITH DIGITAL TRANSVERSE FEEDBACK SYSTEMS IN DEPENDENCE ON BEAM TUNES V.M. Zhabitsky Joint Institute for Nuclear Research.
1 Warp-POSINST is used to investigate e-cloud effects in the SPS Beam ions Electrons Spurious image charges from irregular meshing controlled via guard.
Managed by UT-Battelle for the Department of Energy Status and Implementation of Wideband Feedback System for e-p Instabilities in SNS Craig Deibele, Z.
E-Cloud Effects in the Proposed CERN PS2 Synchrotron M. Venturini, M. Furman, and J-L Vay (LBNL) ECLOUD10 Workshshop, Oct Cornell University Work.
Performance of upgraded SPS damper in view of crab cavity tests Complementarity to High Bandwidth Transverse Feedback W. Hofle CERN BE-RF-FB Acknowledgement:
Introduction to the High Bandwidth Transverse Feedback W. Hofle on behalf of HBTFB Team Proposed New System vs. Existing Feedback System Brief History.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
OPTIONS FOR THE DESIGN OF A NEW PICK-UP AND SCHEDULE G. Kotzian, LIU-SPS High Bandwidth Damper Review, July 30, 2013.
Introduction Status of SC simulations at CERN
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
Summary of visit to BNL and LARP workshop High Bandwidth Feedback perspective Preliminary Report by W. Hofle
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni, Hannes Bartosik, Sandra Aumon 27/06/2012 ICE.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
N. Biancacci MSWG CERN PS impedance localization update Transverse impedance localization method Application to the PS Conclusion and Outlook.
Beam observation and Introduction to Collective Beam Instabilities Observation of collective beam instability Collective modes Wake fields and coupling.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
Status of the SPS impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, G. Iadarola, E. Métral, N. Mounet, V.G. Vaccaro,
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20091/23 reported by Wolfgang Hofle CERN BE/RF/FB Transverse feedback to cure electron-cloud induced.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Interplay of transverse damper and crab cavities W. Hofle BE/RF/FB W. Hofle, 4th Crab Cavity Workshop16-Dec-10 Acknowledgements: RF group, G. Arduini,
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
Improved electron cloud build-up simulations with PyECLOUD G. Iadarola (1),(2), G. Rumolo (1) (1) CERN, Geneva, Switzerland, (2) Università di Napoli “Federico.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
SPS Transverse Damper with Crab Cavities G. Kotzian, W. Hofle BE-RF-FB, 11. January 2016 Crab Cavity SPS Tests Day I
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Three examples of application of Sussix 1)Data from simulations  sensitivity 2)Data from measurements  frequency resolution.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
TITLE OF YOUR POSTER GOES HERE J. E. Dusatko #, J. D. Fox, C. H. Rivetta, O. Turgut (SLAC National Accelerator Laboratory, Menlo Park CA USA) W. Hofle,
Feedback Simulations with Amplifier Saturation, Transient and Realistic Filtering Mauro Pivi, Claudio Rivetta, Kevin Li Webex CERN/SLAC/LBNL 13 September.
Transverse Feedbacks against ECE at SPS and LHC W.Hofle CERN BE-RF-FB on behalf of a multi-lab team CERN – SLAC – LBNL – LNF-INFN W. -
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Status of the single-bunch feedback system for the SPS/LHC M. Pivi C. Rivetta, J. Cesaratto, J. Fox, O. Turgut, S. Uemuda, W. Hofle, U. Wehrle, K. Li,
Progress with High Bandwidth Transverse Feedback CERN - May 2015 Reported by W. Hofle.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
Multi-bunch Feedback System Review and Challenges for 1-2GHz Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Follow up on SPS transverse impedance
Feedbacks for low emittance accelerators
Proposals for 2015 impedance-related MD requests for PSB and SPS
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Digitizers in CCR for transverse wide-band pick-ups
Benchmarking the SPS transverse impedance model: headtail growth rates
News on the TMCI and SPS transverse impedance
Intrabunch feedback system development at DAFNE
G. Arduini, R. Calaga, E. Metral, G. Papotti, G. Rumolo, B. Salvant, R
Limits on damping times
ICFA Mini-Workshop, IHEP, 2017
CERN-SPS horizontal instability
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

POTENTIAL OF THE WIDEBAND TRANSVERSE DAMPER G. Kotzian on behalf of HBTFB team G. Kotzian, LIU-2013, April 12, 2013

HBTFB - High Bandwidth Transverse Feedback Wideband feedback system (GHz bandwidth) Intra-bunch GHz transverse feedback system Help stabilize beam against Ecloud and TMCI effects Under development with LARP supported by: US-LARP CERN SPS LIU Project Analog Front End Analog Back End Signal Processing BPM Kicker Power Amp ADC DAC Beam transverse position pre-processed sampled position “slices” calculated correction data correction signal pre-distortiondrive signal

Achievements in 2012 (H. Bartosik et.al.) (J. Cesaratto et.al.) Image: McGinnis, D. Proc. PAC Simulations Beam-feedback interaction (K. Li et.al.) Study fundamental behaviour of beam in the presence of feedback Macro-particle simulation, based on realistic components and actual SPS prototype hardware Aperture studies (H. Bartosik et.al.) For pick-up/kickers to be installed in LSS3 Kicker studies (LNF-INFN, LBL, and SLAC collaboration) Kicker design and structures Impedance estimates Slotted kicker/cavities/stripline R&D and Hardware development efforts for “demonstrator” Timing and synchronisation master oscillator Beam Excitation System (open loop) 3.2 GS/sec. arbitrary waveform generation, 15k-turns. Feedback Demonstrator (1 bunch, closed loop) 3.2 GS/sec Feedback Demo processor (FPGA based) General purpose test bed, based on expandable platform 16 independent control filters (16 tap FIR) for each of 16 bunch “slices” Allow machine measurements and experiments using the SPS Real-time (hardware) equalizers, for BPM front-end and kicker (K. Pollock et.al.) Proof-of-principle orbit suppression with attenuators (U. Wehrle, G. Kotzian) MDs and measurements with beam at constant energy GeV) (K. Li et.al.) (LARP and CERN)

Highlights – Feedback Demonstrator Hardware MDs and measurements with beam (26 GeV) 1.Driven motion studies  Excite the beam through tailored excitation  Control on selected modes by sweeping frequency (chirps)  Characterization of the response of the combined beam-feedback system 2.Feedback studies of naturally unstable or marginally stable beams  Make the beam unstable with negative chromaticity (mode zero excited)  Find feedback settings to suppress the instability and show that beam becomes unstable with FB off

Preliminary Results (1) Tune shift due to Beam loss Instability Feedback off Feedback active Instability single bunch, 26 GeV, charge ~1E11 These studies use a 200 MHz stripline pickup as kicker. Fractional Tune Turns (x1000) File: _ File: _ Feedback stabilizes the bunch up to 18k turns! Data analysis ongoing … Feedback switched OFF Chromaticity ramped down (close to zero) Chromaticity ramped down (close to zero)

Preliminary Results (2) Closed loop grow/damp tests: Negative  positive  negative feedback applied for several 1’000 turns Turns Feedback “gain” Note the different response of the beam for different positive feedback gains. Many modes got excited with higher gain in positive feedback. gain = gain = FrequencySweep 0.19 – 0.17 FrequencySweep O. Turgut, “SPS FB MD results overview” Joint LARP CM20/HiLumi Meeting, April 8-10,

Work planned during LS1 Learn from data taken with “quick prototype” demonstrator Complete the analysis of MD data Continue simulation studies for feedback system characterisation Specification of wideband feedback Required performance (power, bandwidth, technical components) Kicker design report (spring 2013) Expand 1 bunch prototype Multi-bunch operation  48 bunches seems feasible on this platform Technology R&D Design and build wideband strip-line pickup (CERN RF group) Wideband kicker prototype for SPS installation (decision to be taken on slot line) New wideband 10 (?) MHz RF power amplifiers, with acceptable phase response  contact to industry Module for orbit offset rejection with programmable attenuators Installation Cabling being done for new pickup and kicker during LS1 Reshuffling of equipment in LSS3 to prepare for new kickers+pickup (E. Montesinos et al.) Kickers  dispersion suppressor Pickup  close to QD.31910

Roadmap new pick-up design and construction Year 4Year 3Year 2Year 1Year 5 Phase 1: Year 6Year 7 demonstrator power amplifiers for phase 2 tendering (s) phase 2 beam tests Phase 2: kickers design and construction Phase 3: implementation go / no-go phase 3: from May 2012 W. Hofle Today

Recent Publications (2012) C. Rivetta, J. Cesaratto, J. Fox, M. Pivi, K. Pollak, O. Turgut, S. Uemura, W. Hofle, K. Li., BROAD-BAND TRANSVERSE FEEDBACK AGAINST E-CLOUD OR TMCI: PLAN AND STATUS, 52nd ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams, HB2012 K. Li, J. Cesaratto, J. D. Fox, M. Pivi, C. Rivetta, G. Romulo, Instabilities Simulations with Wideband Feedback Systems: CMAD, HeadTail, Warp, Proceedings of ECLOUD 2012: 5 th International Workshop on Electron-Cloud Effects, La Biodola, Elba, Italy J. Cesaratto, et al., Excitation of Intra-bunch Vertical Motion in the SPS - Implications for Feedback Control of Ecloud and TMCI Instabilities, Proceedings IPAC12 S. De Santis, et al., Study of a Wideband Feedback Kicker for the SPS, Proceedings IPAC12 M. Venturini, et al., Analysis of Numerical Noise in Particle-In-Cell Simulations of Single-Bunch Transverse Instabilities and Feedback in the CERN SPS, Proceedings IPAC12 C. Rivetta, et al., Feedback System Design Techniques for Control of Intra-bunch Instabilities at the SPS, Proceedings IPAC12 C. Rivetta, et al., Reduced Mathematical Model of Transverse Intra-bunch Dynamics, Proceedings IPAC12 J. Fox et al., A 4 GS/s Synchronized Vertical Excitation System for SPS Studies – Steps Toward Wideband Feedback, Proceedings IPAC12 M. Pivi, et al., Simulation Code Implementation to Include Models of a Novel Single-bunch Instability Feedback System and Intra-beam Scattering, Proceedings IPAC12

THANK YOU FOR YOUR ATTENTION! HBTFB Team CERN – G. Arduini, H. Bartosik, W. Höfle, G. Iadarola, G. Kotzian, K. Li, G. Rumolo, B. Salvant, U. Wehrle, C. Zannini SLAC – J. Cesaratto, J. Dusatko, J. D. Fox, S. Johnston, J. Olsen, M. Pivi, K. Pollock, C. Rivetta, O. Turgut LNF-INFN – A. Drago, S. Gallo, F. Marcellini, M. Zobov LBNL – M. Furman, S. De Santis, Z. Paret, J.-L. Vay, M. Venturini KEK – M. Tobiyama