Airborne Instruments: Preparation for Flight and Certification Al Cooper and Al Rodi NSF Facilities Users’ Workshop Sept 2007.

Slides:



Advertisements
Similar presentations
TYPE CERTIFICATES FOR IMPORTED AIRCRAFT Cooperative Development of Operational Safety & Continuing Airworthiness COSCAP.
Advertisements

COMPANY MAINTENANCE MANUAL
RECORD KEEPING Cooperative Development of Operational
Managing the Health and Safety of Contractors
Installation Requirements Paperwork Trail Difficulties
MAJOR REPAIRS AND ALTERATIONS
Wisconsin Knowledge & Concepts Examination (WKCE) Test Security Training for Proctors Wisconsin Department of Public Instruction Office of Educational.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
1 “APPROVED PARTS” PRESENTED BY DON E. GARDNER AVIATION SAFETY INSPECTOR CHARLOTTE FSDO #33 (704)
Wheelchair and Passenger Restraints Your Logo Here A straightforward presentation to be viewed at your leisure, but not to be ignored. Working with equipment.
Certificates of Airworthiness
General Authority of Civil Aviation 1 Air Carriers & Operators In Saudi Arabia Saudi Arabia has made a decision to liberalize the Civil Aviation Market.
Ron DeJuliis, Commissioner of Labor and Industry Rob McGeeney, Program Manager Larry Kreseski, Chief inspector Department of Labor, Licensing, and Regulation.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
AMR Proprietary and Confidential FAA Compliance Training.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Federal Aviation Administration Oversight of Contract Maintenance Presented to: U.S./ Europe International Aviation Safety Conference By: Dan Bachelder,
Downloaded from Maintaining Aging General Aviation Airplanes Presented by: Alabama Northwest Florida Flight Standards District Office.
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Radiopharmaceutical Production
TCCA Aircraft Certification
European Aviation Safety Agency
141 SEMINAR Review of Part 91 and Part 43
Experimental Maintenance
World Health Organization
AVS Repair, Alteration and Fabrication Team (RAFT) Results
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
PRESENTS.
Federal Aviation Administration Southern Region FAASTeam CFI Special Emphasis Program Pilots Airworthiness Responsibilities Presented by: Mark L. Laughridge.
Al Cooper Jeff Stith Earth Observing Laboratory (EOL) HIAPER Debrief 9 November 2005 Ongoing Development and Support: EOL Plans for Deployment of HIAPER.
1 Defense Health Agency Privacy and Civil Liberties Office HIPAA Privacy Board Overview August 6, 2015.
Regulatory Reform Program Proposed Design Approval Rules CASR Parts 21 and 146 Ian Kearsley Manager Engineering Support Section This presentation is.
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
Aircraft Systems And Components
Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, Airports Division Great Lakes.
5/26/20161 AUDIT SERVICES PRIVATE/CORPORATE Captain Iain Tulloch tel /
Federal Aviation Administration Maintenance "Personal Minimums" Federal Aviation Administration DOT/FAA.
Maintenance "Personal Minimums"
Techair – we take care On the other side of the 337 what your client does when he gets a mod and how we can produce better mods to help him John Aplin.
System Wiring Policy Greg Dunn FAA, Transport Airplane Directorate, Airplane & Flight Crew Interface Seattle, Washington November 6, 2001.
Owner/Operator Responsibilities in Aircraft Maintenance & TSO’s and PMA’s Aircraft Owners and Operators Jim Niehoff – FAA Safety Team.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Federal Aviation Administration Plane Sense R1 11/05/2012.
Aviation Maintenance Management
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
System Wiring Policy Greg Dunn FAA, Transport Airplane Directorate, Airplane & Flight Crew Interface Seattle Washington.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Enhanced Airworthiness Program for Airplane Systems (EAPAS) Presented by: Massoud Sadeghi FAA - Aging Systems Program Manager EAPAS Workshop November 2002.
Night Vision Imaging System (NVIS) Maintenance
Federal Aviation Administration Downloaded from Plane Sense R1 11/05/2012.
What aircraft and instruments might I use for my research and do I find out about it/them? Jeff Stith Photo by Grant Gray, EOL.
Linda Bagby - SBN Program Electrical Coordinator ICARUS Electronics Meeting 27 January 2016 SBN Program Operational Readiness Clearance.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
Table 1. The Five Medical Laboratory Case Studies Jan Martin et al. Transnational Evaluation of a New Continuing Professional Development Activity for.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
AIRCRAFT INSPECTION INSPECTION PROCESS. The Art of Inspection What inspection What inspection Who can inspect Who can inspect Phases of inspection Phases.
Changes to Grandfathered Equipment Recent Developments from discussions with EASA and the FAA Mark Barker 2 nd March 2016.
Performance Based Communication and Surveillance (PBCS)
Wisconsin Department of Public Instruction
Federal Aviation Regulations (FAR)
Types of Inspections.
AIRWORTHINESS OF AIRCRAFT
Installation of Non-Required Equipment
Standards and Certification Training
Fiber Reinforced Polymer Systems
Presentation transcript:

Airborne Instruments: Preparation for Flight and Certification Al Cooper and Al Rodi NSF Facilities Users’ Workshop Sept 2007

Preparing Instruments for Flight on Research Aircraft Procedures vary by aircraft, but all require attention to factors affecting safety, esp. in regard to:  Structural properties: Ability to withstand loads arising in flight or in emergencies  Resistance to combustion: use of appropriate wire insulation and other components to avoid flames or hazardous fumes in the cockpit.

Special Requirements for the NSF/NCAR Gulfstream-V We maintain standard transport-category certification as a civil aircraft As delivered from Gulfstream, the aircraft had a type certificate certifying compliance with the Federal Aviation Regulations. We (NSF), as owner, then obtained an airworthiness certificate – the required evidence that this particular aircraft is certified for flight. Modifications invalidate that airworthiness certificate, and we must obtain further approval to resume operations.

Some Apertures Certified on Delivery

Wing-Stores Certification:

1.First, equipment must comply with requirements for structural strength and for use of appropriate components including wiring. Cf. web sites, incl. 2.Help us meet needs for documentation, with drawings, parts lists, and analyses (by a DER). 3.Allow time for the required process, including inspections and FAA approval. What This Means for Investigators Bringing Equipment for Installation

What This Means for Investigators Bringing Equipment for Installation [2] Second, you must help us meet the requirements for whichever type of certification is required (usually, a field approval). For this, we need:  Drawings documenting the mechanical and electrical configuration of the instrument.  Accompanying parts lists including wiring, with components either selected from the list already approved or else tested as necessary. Approved parts are documented on Forms  An engineering analysis by an FAA-certified DER who approves the design. (We can often provide the DER.)‏

What This Means for Investigators Bringing Equipment for Installation [3] Third, we will perform these steps leading to certification for the G-V:  An inspection by an appropriate inspector to ensure that the equipment conforms to the drawings.  Submission of the entire package (drawings, DER analyses, Forms 8110, etc) to the FAA via Form 337. An additional conformity inspection ensures that the installation conforms to the material submitted.

The Investigator’s Handbooks Handbooks are available for both the G-V and the C-130. They include sections that describe the procedures in detail. For the G-V, see Information on mounting points, racks, load requirements, safety margins, and other design criteria are included there. The handbook also includes advice on acceptable materials for construction, acceptable fasteners, welding, weight limits for racks, overturning moments, floor loading limits, etc. There is additional information (e.g., on approved wire) at

1.Develop Design Data 2.Submit Data to DER (RAF or outside) 3.DER checks for compliance with FARs 4.Purchase Components 5.Test as Necessary 6.Build Instrument 7.Check Conformity to Data 8.Install on G-V 9.Check Conformity of Installation 10.Ready for Flight – after FAA approval CONSTRUCTING A CERTIFIED INSTRUMENT

The Data Package The G-V handbook also describes the data package needed from each investigators who brings equipment for installation. This package is typically needed about 8 wks prior to the start of flights.  Descriptive data: drawings, with dimensions, weights, materials, etc.  Substantiating data, including: Structural loads analysis Electrical loads analysis There are some sample data packages on the RAF web site ( There are also many special cases, including lasers, cryogens, toxic gases, batteries, pressure vessels, etc. The Data Package

Some Important Consequences: (a) We need drawings ahead of time so that we can do the required analyses and submit the information in time to allow approval by the FAA. (b) We are very limited in regard to what can be changed during a project. We can't change instrument configurations or make significant changes to an instrument. (c) Large complements of new instruments can be difficult to handle in the short time prior to a project, so it is desirable to install and test instruments ahead of time. Consequences for Investigators

New Recommended Policy re Testing Required instruments for a field program will need to be tested (and, for the G-V, certified) 3 mo prior to installation. Others may test first in pre-deployment testing, but failure will result in removal from the payload. Instruments previously flown are exempt if they have not been modified significantly. The status of the instrumentation will be considered appropriately in assessing the feasibility of the experiment. To assist users in testing and certifying instruments, EOL will provide periodic opportunities for installation, certification, and flight testing. New Recommended Policy Re Testing

How Does the C-130 Differ? We are moving to the same procedures, except that FAA approval is not required. We assume responsibility (but therefore must enforce similar safety requirements). As a result:  The process does not require the same lead time or formality in documentation  There is a little more flexibility in regard to what components are acceptable and what in-field procedures are possible. How Does the C-130 Differ?

Important Conclusion: Contact us early and often!  We can help guide developers through this process, often saving us all time;  Knowing about developments helps us prepare for their arrival and avoid last-minute surprises.  Important Summary:

How does the UWKA differ? Certification: FAR Part 91 restricted: A few operational restrictions that usually can be waived All modifications require FAA approval Submission of package of drawings, DER analyses, Forms 8110, etc., to the FAA via Form 337. We have our own staff of aircraft maintenance technicians, one with Inspection Authorization (IA) who can approve mods via the 337 or STC process.

UWKA certification issues Nadir port installation Radar wing Contacting us early and often - even at the 'just thinking about it' stage – is the key. UW has done some major modifications in-house. In most instances, this has involved purchasing engineering with FAA Supplemental Type Certificates (STC)  20” nadir port (AVCON)  Radar ‘wing’ (NOAA) For “minor” alterations: UW contracts with DER to do engineering. This is becoming increasingly time consuming and expensive. We cannot easily accommodate 19” rack mountable gear (especially the “standard” long racks) due to aisle (egress) requirements.  Often, special racks have to be constructed and/or equipment repackaged.

NB: Previous approval on other aircraft does not insure approval on the King Air. Our standards are not necessarily higher, but the restrictions are different. UWKA certification issues

Legacy issues: Aircraft is 30 years old, and contains much material that does not conform to current standards. However, in new installations, we will conform to use of only certified materials (i.e. appropriate wire insulation and other components to avoid flames or hazardous fumes in the cockpit). Contact us for details