Training. Why Train? skills and knowledge needed by new staff update skills of old staff assure conformity to standards teach the proper use of SQA procedures.

Slides:



Advertisements
Similar presentations
Accident and Incident Investigation
Advertisements

1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
More CMM Part Two : Details.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Overview Lesson 10,11 - Software Quality Assurance
Project Quality Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
School of Computing, Dublin Institute of Technology.
Positive Behavioral Intervention and Support (PBIS) A New Way to Manage By: Annie Schave and Emily Smith.
Goal Sharing Team Training Statistical Resource Leaders (1)
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
1 Chapter 6 Risk Management. 2 Project Risks What can go wrong? What is the likelihood? What will the damage be? What can we do about it?
Course Technology Chapter 3: Project Integration Management.
Chapter 8 Assuring the quality of external participants’ contributions
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
1 Continuous Improvement. 2 1.Overview of the PDCA Problem Solving Cycle. 2.Foundations of the PDCA Cycle 3.Plan Step 4.Do Step 5.Check Step 6.Act Step.
Methods and Philosophy of Statistical Process Control
MONITORING PROJECTS: QUALITY AND RESULTS. DAY ONE ASSESSMENT DAY TWO DESIGN DAY THREE MONITORING MORNING Intro. Training Intro. Assessment Intro. DesignIntro.
Root Cause Analysis: Why? Why? Why?
OHT 17.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Corrective and preventive actions — definitions The corrective and preventive.
ISO 9000 Certification ISO 9001 and ISO
Overview of DMAIC A Systematic Framework for Problem Solving
OHT 4.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
SQA Work Procedures.
Even More SQA: Work Procedures
Fundamentals of ISO.
OHT 19.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Controlled documents and quality records Definitions and objectives.
Even More SQA: CAPA Corrective and Preventive Actions.
Software Project Management
Software Quality Assurance (SQA) Monitor the methods and standards used during the software development and verify their correct usage. What is Quality?
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
OHT 16.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The objectives of training and certification The training and certification.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
N By: Md Rezaul Huda Reza n
Software Quality Assurance Activities
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
Verification: Quality Assurance in Assessment Verification is the main quality assurance process associated with assessment systems and practice - whether.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Fundamentals of Evaluation for Public Health Programs ROBERT FOLEY, M.ED. NIHB TRIBAL PUBLIC HEALTH SUMMIT MARCH 31,
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
S Q A.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
Georgia Institute of Technology CS 4320 Fall 2003.
D1.HRD.CL9.06 D1.HHR.CL8.07 D2.TRD.CL8.09 Slide 1.
CSCI 521 Final Exam Review. Why Establish a Standard Process? It is nearly impossible to have a high quality product without a high quality process. Standard.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
A QUALITY IMPROVEMENT TOOL
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Advanced Project Management Project Quality Management Ghazala Amin.
Capability Maturity Model. CS460 - Senior Design Project I (AY2004)2 Immature Organisations Software processes are often rigorously followed. Organisation.
Presentation on Quality management systems Presented by: Razeena Ameen Roll no BS(IT) 7 th.
Unit-3 Control chart Presented by N.vigneshwari. Today’s topic  Control chart.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
8.1 Plan Quality Management
Software Configuration Management
Software Project Configuration Management
Software Quality Control and Quality Assurance: Introduction
CIS 375 Bruce R. Maxim UM-Dearborn
Causal Analysis & Resolution (CAR) Support Category
Software Verification and Validation
Corrective and Preventive Actions
Environmental Management Systems The ISO Approach Initial Environmental Review & Gap Analysis Presented by: NC Division of Pollution Prevention.
Process Capability.
Root Cause Analysis: Why? Why? Why?
Project Quality Management
Chapter 6 Risk Management
The Quality Improvement Model
Presentation transcript:

Training

Why Train? skills and knowledge needed by new staff update skills of old staff assure conformity to standards teach the proper use of SQA procedures and their purpose because ISO and CMM say so blatant steal from Galin

What topics need training? Software Engineering (Development) – e.g. CASE tools, estimating tools, procedures for coding, … – when: when new staff are hired – big companies? – small companies? SQA – e.g. testing tools and methods, peer-review procedures and checklists, … – when does SQA training occur? – probably reviewed annually – who gets SQA training?

Who does the training? in-house training unit vocational schools commercial technical trainers When are these appropriate?

And most important… Follow-up the training!!! Why follow-up? How do we follow-up?

CAPA Corrective and Preventive Actions

What is CAPA? activities not intended to correct defects, but to eliminate the cause of those defects.

Reality Check... How can we see into the future and fix problems that have not yet occurred? corrective - fix past problems preventive - predict potential problems

How to conduct CAPA 1.information collection 2.analysis of information 3.development of improved methods 4.implementation of improved methods 5.follow-up

What info gets analyzed? Roundup the usual suspects… design review reports code walkthrough reports test reports project progress reports customer complaint records software change requests and maintenance reports training follow-up reports But don't forget… special reports on quality / quality audits suggestions / observations by staff

Ways to sift through that huge pile of records asks the reporter to indicate a priority for their report random sampling combination of the two techniques above

When do you analyze that huge pile of records? Answer 1 : After a plane crash. Answer 2 : Every time a plane lands.

CAPA Outcomes updating relevant procedures updating relevant work procedures changing tools improvement of reporting methods report contents report frequency changes in training probably, several of the above

Side Topic: Control Charts Common Cause and Special Cause Lines: – Center Line = mean – Upper and Lower Control Limits (UCL and LCL) – Warning Limits If the process is "in control", all points will plot within the control limits. The control limits have no relationship to quality limits. adapted from:

Common Cause and Special Cause Warning: Don't Overreact " 'A riot occurs in a certain prison. Officials and sociologists turn out a detailed report about the prison, with a full explanation of why and how it happened here, ignoring the fact that the causes were common to a majority of prisons, and that the riot could have happened anywhere.' The quote recognizes that there is a temptation to react to an extreme outcome and to see it as significant, even where its causes are common to many situations and the distinctive circumstances surrounding its occurrence, the results of mere chance. Such behavior has many implications within management, often leading to interventions in processes that merely increase the level of variation and frequency of undesirable outcomes."

Side Topic similar to Control Charts: Scatter Charts

Side Topic Related to CAPA: PDCA PLAN – Establish the objectives and processes necessary to deliver results in accordance with the specifications. DO – Implement the processes. CHECK – Monitor and evaluate the processes and results against objectives and specifications and report the outcome. ACT – Apply actions to the outcome for necessary improvement. This means reviewing all steps (Plan, Do, Check, Act) and modifying the process to improve it before its next implementation.

And, of course, the obvious question Why bother with CAPA?