Hillsborough County Walk/Bike Action Safety Plan Hillsborough County MPO Prepared for: Prepared by: Hillsborough County Bicycle/Pedestrian Advisory Committee.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 15 Publication No. FHWA-HRT Bicycle Lanes.
Titusville to Edgewater Bike Loop PD&E Study
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
By: Vanessa Victor Scott Yoshida Travis Hills Lucas Sprague.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Before : Inadequate gateway point along Highway 100 No Sense.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
FDOT Bicycle/Pedestrian Focused Initiative & Complete Streets Florida Department of TRANSPORTATION Billy L. Hattaway, PE District One Secretary.
Harrisburg Area Transportation Study Cross-river Connections Study Capital Area Cross-River Connections Study prepared for Harrisburg Area Transportation.
Pedestrian and Bicycle Concerns About Highway Design and Operation Barb Mee, AICP City of Asheville Transportation Department
Florida Department of Transportation, November 2009
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
How Walkable and Bike-able Is UCLA ? Multi-Modal Level Of Service Analysis in the UCLA Campus HYERAN LEE CLASS OF 2014 MASTER OF URBAN AND REGIONAL PLANNING.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Learning Outcomes Identify safety issues unique to local and rural areas. Identify common challenges to improving road safety. Explain why road agencies.
Oregon Pedestrian and Bicycle Safety Implementation Plan.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
Miccosukee Road Resurfacing and Re-striping Public Input Requested On-Street Parking vs Bike Lanes.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Understanding the Virginia Driver’s Manual
FDOT Bicycle/Pedestrian Focused Initiative & Complete Streets Florida Department of TRANSPORTATION Billy L. Hattaway, PE District One Secretary.
Safety Audit Components Safety assessment for risk Management.
Ch. 7 – Parallel Parking NY State DMV.
Transportation Tuesday TRANSPORTATION TUESDAY Stopping & Parking You should never park or stop your vehicle on busy traffic lanes or in no waiting and.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
Highways and Airports Engineering Project Lecture 2 Highway Signs and Markings Cairo University Faculty of Engineering Public Works Department Dr. Dalia.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Presentation title | Date. Who We Are Building a Healthier Heartland (BHH)  Super-coalition of local and national partners that promotes policy, systems.
PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015.
Unit 2: Signs, Signals, and Roadway Markings
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Chapter 5 Sharing the Road.  When following a large vehicle, stay out of its "blind spots". Position your vehicle so the driver can see it in the side.
Lompoc Walkability Assessment September 24, 2009.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Complete Streets Training Module 4b – Designing for All Users.
Bicycle and Pedestrian Safety Action Plan
Saving the King Street Bicycle Boulevard
US 92 Pedestrian Connectivity & Safety Assessment Study
APTA Sustainability Conference July 2016
Signalized Intersection Lighting
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
River to Sea TPO Meeting US 92/International Speedway Boulevard
US 92 Pedestrian Connectivity & Safety Assessment Study
Association of Metropolitan Planning Organizations
City of Wilmington Bike Plan Update
Alex Henry FDOT District Seven Safety Office
Presentation transcript:

Hillsborough County Walk/Bike Action Safety Plan Hillsborough County MPO Prepared for: Prepared by: Hillsborough County Bicycle/Pedestrian Advisory Committee (BPAC) January 11, 2012 URS Corporation

Hillsborough County Walk/Bike Action Safety Plan Agenda Purpose Purpose Study Areas and Corridors Study Areas and Corridors General Observations General Observations Priority Ranking Priority Ranking Next Steps Next Steps

Hillsborough County Walk/Bike Action Safety Plan Purpose The need for a balanced, multi-modal transportation with strategic “enhancements” to provide safer, more convenient and comfortable travel for all users including bicyclists, pedestrians, transit patrons, children, seniors and persons with disabilities.

Hillsborough County Walk/Bike Action Safety Plan Study Areas and Corridors USF Area USF Area 56 th Street - Fowler Avenue to Fletcher Avenue 56 th Street - Fowler Avenue to Fletcher Avenue 42 nd Street - Fletcher Avenue to Bruce. B. Downs Boulevard 42 nd Street - Fletcher Avenue to Bruce. B. Downs Boulevard 46 th Street/Skipper Road – Fletcher Avenue to Bruce B. Downs Boulevard 46 th Street/Skipper Road – Fletcher Avenue to Bruce B. Downs Boulevard Bruce B. Downs Boulevard – Fletcher Avenue to City Limits Bruce B. Downs Boulevard – Fletcher Avenue to City Limits Carrollwood Area Carrollwood Area Fletcher Avenue – North Boulevard to Nebraska Avenue Fletcher Avenue – North Boulevard to Nebraska Avenue Northdale Boulevard – Dale Mabry Highway to Lakeshore Road Northdale Boulevard – Dale Mabry Highway to Lakeshore Road Bearss Avenue – Dale Mabry Highway to 22 nd Street Bearss Avenue – Dale Mabry Highway to 22 nd Street Town N’ Country / Egypt Lake Area Town N’ Country / Egypt Lake Area Waters Avenue – Sheldon Road to Florida Avenue Waters Avenue – Sheldon Road to Florida Avenue Sligh Avenue / Pinecrest Manor – Benjamin Road to Dale Mabry Highway Sligh Avenue / Pinecrest Manor – Benjamin Road to Dale Mabry Highway Lambright Road / Sligh Avenue – Dale Mabry Highway to Armenia Avenue Lambright Road / Sligh Avenue – Dale Mabry Highway to Armenia Avenue Hanley Road – Hillsborough Avenue to Waters Avenue Hanley Road – Hillsborough Avenue to Waters Avenue Sheldon Road – Hillsborough Avenue to Linebaugh Avenue Sheldon Road – Hillsborough Avenue to Linebaugh Avenue

Hillsborough County Walk/Bike Action Safety Plan Study Areas and Corridors (Continued) Palm River Area Palm River Area 78 th Street – Madison Avenue to Lee Roy Selmon Expressway 78 th Street – Madison Avenue to Lee Roy Selmon Expressway Maydell Drive – Causeway Boulevard to Adamo Drive Maydell Drive – Causeway Boulevard to Adamo Drive Citrus Park Area Citrus Park Area Gunn Highway – Ehrilich Road to Citrus Park Drive Gunn Highway – Ehrilich Road to Citrus Park Drive Gunn Highway – Citrus Park Drive to Henderson Road Gunn Highway – Citrus Park Drive to Henderson Road Gunn Highway – Tarpon Springs Road to Van Dyke Road Gunn Highway – Tarpon Springs Road to Van Dyke Road Brandon Area Brandon Area Parsons Avenue – SR 60 to Martin Luther King Jr. Boulevard Parsons Avenue – SR 60 to Martin Luther King Jr. Boulevard Mango Road (CR 579) - Martin Luther King Jr. Boulevard to N. of I-4 Mango Road (CR 579) - Martin Luther King Jr. Boulevard to N. of I-4 Providence Road – Bloomingdale Avenue to SR 60 Providence Road – Bloomingdale Avenue to SR 60 Bloomingdale Avenue – US 301 to Lithia Pinecrest Road Bloomingdale Avenue – US 301 to Lithia Pinecrest Road

Hillsborough County Walk/Bike Action Safety Plan USF Citrus Carrollwood NTS Northwest Hillsborough County Study Corridor

Hillsborough County Walk/Bike Action Safety Plan Town N’ Country NTS West Central Hillsborough County Study Corridor

Hillsborough County Walk/Bike Action Safety Plan Palm River Palm River Brandon NTS Southeast Hillsborough County Study Corridor

Hillsborough County Walk/Bike Action Safety Plan General Observations Intersection Approach Crosswalks Intersection Approach Crosswalks Unless proven otherwise, include crosswalks at all intersection approaches Unless proven otherwise, include crosswalks at all intersection approaches Place crosswalks as close to the intersection as possible Place crosswalks as close to the intersection as possible Parallel to adjacent street Parallel to adjacent street Ladder crosswalks Ladder crosswalks

Hillsborough County Walk/Bike Action Safety Plan General Observations (continued) Pedestrian Lighting Pedestrian Lighting Important to maximize pedestrian visibility Important to maximize pedestrian visibility Bike Lane Markings Bike Lane Markings Inconsistent bike lane markings are confusing for both motorists and pedestrians; should be consistent with MUTCD Inconsistent bike lane markings are confusing for both motorists and pedestrians; should be consistent with MUTCD Bike Parking at Bus Stops Bike Parking at Bus Stops Observed bikes locked to signs, etc. Observed bikes locked to signs, etc. Debris and Vegetation Debris and Vegetation Bike lanes and roadways should be kept clear of debris Bike lanes and roadways should be kept clear of debris

Hillsborough County Walk/Bike Action Safety Plan Lighting Generally insufficient Generally insufficient Roadway lighting does not necessarily equate to a well lit roadway for pedestrians Roadway lighting does not necessarily equate to a well lit roadway for pedestrians Vehicle lighting versus Pedestrian lighting Vehicle lighting versus Pedestrian lighting Areas of dark and light Areas of dark and light FDOT Painted Pavement Markings (PPM) and Lighting Standards FDOT Painted Pavement Markings (PPM) and Lighting Standards

Hillsborough County Walk/Bike Action Safety Plan Substandard Lighting

Hillsborough County Walk/Bike Action Safety Plan Standard Lighting

Hillsborough County Walk/Bike Action Safety Plan Lane Striping As related to Night Time Visibility As related to Night Time Visibility Research supports improving roadway striping to reduce all crashes Research supports improving roadway striping to reduce all crashes Hypothesis: enhanced striping allows motorists to devote more attention to what is happening in the environment and less to maintaining lane position Hypothesis: enhanced striping allows motorists to devote more attention to what is happening in the environment and less to maintaining lane position

Hillsborough County Walk/Bike Action Safety Plan Corridor Priority Ranking

Hillsborough County Walk/Bike Action Safety Plan Corridor Priority Ranking

Hillsborough County Walk/Bike Action Safety Plan Corridor Preliminary Recommendations

Hillsborough County Walk/Bike Action Safety Plan Corridor Preliminary Recommendations

Hillsborough County Walk/Bike Action Safety Plan USF Area 56 th Street, 42 nd Street and Bruce B. Downs Boulevard ranked in the top 10 study corridors for high bike/ped crashes 56 th Street, 42 nd Street and Bruce B. Downs Boulevard ranked in the top 10 study corridors for high bike/ped crashes Lack of sidewalks and poor pedestrian visibility along 42 nd Street and 46 th Street/Skipper Road due to tree canopies Lack of sidewalks and poor pedestrian visibility along 42 nd Street and 46 th Street/Skipper Road due to tree canopies Need for midblock crossing and sidewalks along 46 th Street / Skipper Road at transit stops or student pickup/drop-off locations Need for midblock crossing and sidewalks along 46 th Street / Skipper Road at transit stops or student pickup/drop-off locations

Hillsborough County Walk/Bike Action Safety Plan Carrollwood Area Fletcher Avenue ranked overall the No. 1 study corridor needing improvements (31/crashes per mile) Fletcher Avenue ranked overall the No. 1 study corridor needing improvements (31/crashes per mile) There are no bike lanes along this corridor and very limited room for them There are no bike lanes along this corridor and very limited room for them Midblock crossing(s) along Fletcher Avenue should be considered Midblock crossing(s) along Fletcher Avenue should be considered I-275 interchanges at Fletcher and Bearss Avenues need additional pedestrian crossing, signage and pavement markings I-275 interchanges at Fletcher and Bearss Avenues need additional pedestrian crossing, signage and pavement markings

Hillsborough County Walk/Bike Action Safety Plan Town N’ Country/Egypt Lake Area Veteran’s Expressway crosswalks provide no indicators to vehicles that pedestrians have the right-of-way and should be further evaluated Veteran’s Expressway crosswalks provide no indicators to vehicles that pedestrians have the right-of-way and should be further evaluated High mid-block pedestrian activity at Waters, Hanley and Armenia Avenues High mid-block pedestrian activity at Waters, Hanley and Armenia Avenues Need for intersection upgrades to curb ramps, push buttons, and eliminate driveway access to corner businesses. Need for intersection upgrades to curb ramps, push buttons, and eliminate driveway access to corner businesses. Sidewalks needed along Sligh Avenue Sidewalks needed along Sligh Avenue between Benjamin Road and the CSX railroad between Benjamin Road and the CSX railroad Dale Mabry and Himes Dale Mabry and Himes

Hillsborough County Walk/Bike Action Safety Plan Citrus Park Area Curb radius redesign to reduce speed from Gunn Hwy to Gunn Hwy Curb radius redesign to reduce speed from Gunn Hwy to Gunn Hwy Need for mid-block crossing Gunn Highway between Erhlich Road and Citrus Park Drive Need for mid-block crossing Gunn Highway between Erhlich Road and Citrus Park Drive Need for pedestrian crosswalk with pavement marking is needed at Van Dyke Road signalized intersection Need for pedestrian crosswalk with pavement marking is needed at Van Dyke Road signalized intersection Potential implementation of rural roadway “sharrows” along Gunn Hwy between Tarpon Road and Van Dyke Road Potential implementation of rural roadway “sharrows” along Gunn Hwy between Tarpon Road and Van Dyke Road Vegetated overgrowth/low lying canopied trees between Erhlich and Henderson Roads Vegetated overgrowth/low lying canopied trees between Erhlich and Henderson Roads

Hillsborough County Walk/Bike Action Safety Plan Palm River and Brandon Areas Low speeds and traffic volumes along 78 th Street and Maydell Drive may provide opportunity for “sharrows” along both corridors Low speeds and traffic volumes along 78 th Street and Maydell Drive may provide opportunity for “sharrows” along both corridors Lighting along roadway should be further evaluated Lighting along roadway should be further evaluated Continuous sidewalks along most Brandon corridors Continuous sidewalks along most Brandon corridors Brandon corridors have the lowest bike/ped crash rates compared to other areas Brandon corridors have the lowest bike/ped crash rates compared to other areas

Hillsborough County Walk/Bike Action Safety Plan Upcoming Steps… Complete Improvement Recommendations Complete Improvement Recommendations Prioritize / Rank Improvements by Corridor Prioritize / Rank Improvements by Corridor Prepare Draft Report Prepare Draft Report