CEM 520: Construction Contracting and Administration 03 June 2007

Slides:



Advertisements
Similar presentations
Guidance Note on Joint Programming
Advertisements

Construction Contracting
FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
ABC Change Orders College of Environmental Design
STRATEGIC PLANNING FOR Post-Clearance Audit (PCA)
Environmental Management System (EMS)
ACCOUNTING INFORMATION SYSTEMS
King Fahd University Of Petroleum and Minerals Construction Engineering and Management CEM520 Construction Contracting and Administration Term Paper Contract.
Joint Ventures in Construction Firms in Saudi Arabia By Kamal Khalil Khairaddin Abbasi A thesis paper summary Summarized by Mahdi Fida Al-Adel.
EVALUATION OF CONSULTANT PERFORMANCE CEM 520 Ahmed S. Agha Abdulrahman A. Al-Hussain Professor Saadi Assaf January 2007.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA Construction Engineering & Management CEM-520 CHANGE ORDERS IN CONSTRUCTION PROJECTS.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Business Statistics for Managerial Decision
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Cost Implications of Architectural Design Variables Ahmed S. Al Zahrani December 2005 King Fahd University of Petroleum & Minerals Department of Construction.
Abdallah M. Al-Mahasheer
Purpose of the Standards
Page 1 Vienna, 03. June 2014 Mario Gavrić Croatian Bureau of Statistics Senior Adviser in Classification, Sampling, Statistical Methods and Analyses Department.
Creating Research proposal. What is a Marketing or Business Research Proposal? “A plan that offers ideas for conducting research”. “A marketing research.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
TC176/IAF ISO 9001:2000 Auditing Practices Group.
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
Internal Auditing and Outsourcing
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Audit of Public Procurement
INTERNAL AUDIT IN UKRAINE State Financial Inspection of Ukraine
4/21/2017 Evaluation Of Performance Measures For Materials Management Process In Industrial Construction Projects Term Project for CEM 520 Instructor:
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
ISO 14001:2004, Environmental Management System
1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University.
Joint Venture in construction company in West Bank.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
European Conference on Quality in Official Statistics Session 26: Quality Issues in Census « Rome, 10 July 2008 « Quality Assurance and Control Programme.
Audit Sampling: An Overview and Application to Tests of Controls
McGraw-Hill/Irwin © The McGraw-Hill Companies 2010 Audit Planning and Types of Audit Tests Chapter Five.
By Cao Hao Thi - Fredric W. Swierczek
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Geographical Enlargement of CERN Associate membership Principles and criteria S. Intoudi / 8 July
College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
United Nations Oslo City Group on Energy Statistics OG7, Helsinki, Finland October 2012 ESCM Chapter 8: Data Quality and Meta Data 1.
Kathy Corbiere Service Delivery and Performance Commission
CEM CEM – 520 Measuring the Effectiveness of Materials Management for Industrial Construction Projects in Saudi Arabia Thesis By Ali Al-Darweesh.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
Continual Service Improvement Methods & Techniques.
QUALIY MANAGEMENT PRACTICES AMONG A/E ORGANIZATIONS BY Gulam Farooq DEC 1997 Presented by: Hezam Al-Qahtani QUALIY MANAGEMENT PRACTICES AMONG A/E ORGANIZATIONS.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
TC176/IAF ISO 9001:2000 Auditing Practices Group.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
 Planning an audit of cost statements, records and other related documents is considered necessary to ensure achievement of audit objectives with available.
An exposure to COMPLIANCE AUDIT By- Vishal Chawre DAG(A/c & VLC) O/o AG(A&E), Nagpur.
Work shop on Procurement Key-performance indicators with selected implementing entities Public procurement and property administration agency August 2016.
Software Quality Control and Quality Assurance: Introduction
Audit Planning, Types of Audit Tests and Materiality
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Causes Of Contractors’ Failure In West Bank
the Public Procurement Audit Practical Guide
Introduction DEFINATION :-
United Nations Voluntary Fund on Disability (UNVFD)
How to conduct Effective Stage-1 Audit
Factors Affecting Bid/No Bid Decision Making IN The West Bank
Presentation transcript:

CEM 520: Construction Contracting and Administration 03 June 2007 Factors Affecting Design and Documentation Quality in Construction Industry BY: MOSTAFA ISMAIL DARWISH CEM 520: Construction Contracting and Administration 03 June 2007 Presented BY: Osama Mohsen Ibrahim AlRamadan Muidh AlGahtani

Presentation Outline Introduction Objectives and Scope Literature Review Research Methodology Data Analysis Approach Finding and Results Conclusion and Recommendations

Introduction To allow construction contractors to transform the design concepts and ideas into physical product, the designers provide drawings the specifications. The quality of these design documents greatly affects the efficiency of the construction phase. To determine the level of documentation quality, a number of attributes should be considered such as time, accuracy, completeness, coordination and conformance. Any improvement in design and documentation quality will lead to improvements in the construction process. The awareness of the value of quality design and documentation would ensure that sufficient time and fees are available to allow designers to provide the needed level of services. In addition, more projects will be completed on time, within budget, and with less rework and disputes.

Objectives and Scope Objectives of the Study Scope and Limitations To identify main factors affecting design and documentation quality in the Saudi Arabia construction industry To investigate the nature and extent of the impacts of design and documentation deficiencies on project cost and time To calculate the percentage agreement between different project participants on the ranking of the factors Scope and Limitations Experts with more than 10 years experience in projects greater than SR 10 million All building projects built in the Eastern Province of Saudi Arabia The focus is on traditional procurement projects in the Public sector

Literature Review Terminology “Quality” is defined as meeting the requirements of the owner, design professional, and constructor as specified by contract, while complying with laws, codes, standards, regulatory rules, and other matters of public policy “Quality Design” is the design that is effective and compatible with the best possible economy and safety A related term to design quality is “Deviation”. which is defined as a departure from established requirements and may be classified as an imperfection, nonconformance, or defect based on its severity

Literature Review Design and Documentation Attributes On a previous study, conducted by Tilley and McFallan in 2000, a list of attributes has been identified as having a direct impact on the quality of design and documentation Design Quality Attributes (out of 22) Functionality Relevancy Competence and Experience Documentation Quality Attributes (out of 12) Accuracy Clarity Final checking

Literature Review Design Deficiencies Most design deficiencies can be categorized as one of the following three types: Contract document conflicts Interdisciplinary coordination errors Technical compliance discrepancies The three major causes of contract modifications are: Design deficiencies User requested changes Unknown site conditions According to previous studies, about 56% of all contract modifications are needed to correct design deficiencies

Literature Review Improving Design and Documentation Quality In order to improve the overall quality of design and documentation, the following issues need to be considered: The procedure for selecting a consultant or designer, and the basis for payment of fees The method of selection of a contractor has shortcomings There need to be communication with the contractor at an early stage of the design The lack of formal techniques and procedures for managing the design process

Literature Review Factors from Previous Studies One study, performed by Tilley and McFallan (2000) in Australia, lists 23 factors. Most important factors are: unrealistic expectations by clients in terms of fees, service and timing low fee structures insufficient profits to enable the training of staff Another study, conducted by Andy and Minato (2003) in Japan, lists 26 factors. Most important factors are insufficient design time client’s tendency to shop around for design fee low design fee

Research Methodology Research Process The research methodology can be summarized in 5 steps: Step1: Literature review in order to identify the important factors Step2: Questionnaire development information on the respondents and Importance of the factors Step3: Field Survey Step4: Statistical Analysis of the data Step5: Major finding and results

Research Methodology Questionnaire Design After reviewing the literature, the most influential factors were determined An initial questionnaire with (43) factors was developed A pilot study, then, with (6) construction experts was done ( analysis the factors) Finally, a new version of the questionnaire with (39) factors was developed and surveyed

Research Methodology Respondents Restrictions Four (4) restrictions were imposed on the selection process of the respondents as follows: Contractor with Grade-2 or better (Chamber of Commerce) Building Projects Large projects (10 millions SR or more) Eastern Province of KSA According to the Chamber of Commerce: 72 Consultants 131 Contractors 88 Owner will satisfy the four (4) restrictions mentioned above

Data Analysis Approach Sample Size Sample size were determined using statistical principles of exploratory research as follows: n0 = (p*q) / V² n = n0 / [ 1+ (n0/N)] where: n0: First estimate of sample size. p : The proportion of the characteristics being measured in the target population. q : Complement pf 'p' or 1-p. V : The maximum standard error allowed. N : The population size. n : the sample size

Data Analysis Approach Sample Size To maximize n: p is set to 0.5 To account for error in qualitative answers: V is set to 10% or 0.1 Using these values, the sample size is found to be: Contractors ( N= 131) , n= 21 Consultants (N= 72) , n=19 Owner (N= 88) , n= 13

Data Analysis Approach Important Index ( II ) The questionnaire is designed to have (39) factors and each has five options with the following scale (interval): “Always”= 100% “Often”= 75% “Occasionally”= 50% “Rarely”= 25% “Not at all” = 0% The Important Index (II) is calculated as follows: II = 100X1 + 75X2 + 50X3 + 25X4 + 0X5 (X1+X2+X3+X4+X5) where : X1 : number of respondents answering “ Always” X2, X3, X4, X5 is the same for the rest

Finding and Results General Information of the Respondents The respondents participated in the questionnaire have the following characteristics: Almost 80% are over 15 years of experience 57% of the Contractors are Grade-1 and the rest are Grade-2 94% of the Consultants are medium size (between 100 and 400 employees) 48% of the Contractors are large size (more than 400 employees)

Finding and Results Ranking by the Important Index By applying the important index formula, the most important factors that affecting design and documentation quality was determined. The most five important are the following: Last minute changes by client Insufficient overall design time Unstable client's requirements Waiting for client decision Consultants tends to copy & modify from their previous work to minimize time and cost

Conclusion Based on the responses of the survey, it is concluded that the reduction in the level of design fees together with limited time available to develop the design work and in addition to, instability of the owner requirements and decisions throughout the design process have caused problems in the design and documentation quality. The responses from almost all contractors (94%) indicated that the standard of design and documentation has an influence on the price submitted. (88%) of respondents stated that the quality of design and documentation influenced the time required to complete the project.

Conclusion The responses indicated that poor quality design documentation was costing owners and developers an average of 9% on the estimated project cost and a similar amount in time for the project duration. They indicated that other issues were due to design and documentation deficiency, just fewer than 40% of the time. Percentage agreement of 44.3% was observed between consultants and contractors groups on the ranking factors. Percentage agreement of 41.9% was noted between owners and contractors groups on the ranking of factors. Percentage agreement of 3.5% was found between owners and consultants groups on the ranking of factors.

Conclusion The Kendall’s rank correlation, T=0.53, which indicates moderate agreement in the ranking of the factors by overall construction groups. The rank agreement calculations show that there is a moderate agreement correlation among designers in Saudi Arabia, Australia, and Japan on the ranking of the main factors affecting design and documentation quality.

Recommendations The results of the survey show a need of developers to allocate funds and time to the planning and design phases of a project , in order to maximize construction process efficiency and minimizes overall project costs and duration. Improvements in construction process efficiency will result from creating an awareness of the value of quality design and documentation and implementation of selection criteria that includes consideration of the designer’s skills experience. Consultants (designers) need to consider properly the role and proper contribution of the owners and contractor when preparing project documentation , to ensure that it meets their requirements and objectives in relation to their contract obligations.

Recommendations Owner and contractor proper involvement in the early stage of the design process will be effective in improving overall design documentation quality. The need for owners and developers to allocate adequate funds and time to the planning and design phases of a project in addition to stable decision and specific requirements, in order to maximize construction process efficiency and minimize overall project costs and time (duration).

Critique Very useful study since it address real problems encountered in construction industry. The number of factors is large, 39. Some factors can be combined together. What is the source of these factors? It is not mentioned whether or not the author create some of the factors use them from previous studies. Repeated information in literature review with no coherent between some sections. The study does not suggest procedural solutions that can be followed by the concerned parties.

Thank You Questions!