PROJECT LIFE12 ENV/IT/00036 “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC.
Advertisements

PIC INTERREG IIIC Sud “Robinwood” Mr. Paolo Forno Financial Manager Subprojects Administrative procedures.
Project FP7-PEOPLE-IRSES: ASK no
1 Emerging communities for collective innovation: ICT Operational tool and supporting methodologies for SME Associations 2010 January,
Work meeting Interreg SYSIASS project 21 st April 2011 University of Essex 1 Part-financed by the European Regional Development Fund.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
1 PODEBA Use of poultry dejection for the bating phase in the tanning cycle Alice Dall’Ara– ENEA Sergio Sangiorgi - ENEA 12/06/ month meeting Elda.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
ESPON 2013 Programme 3 rd Financial Managers Seminar Brussels 19 May 2010.
PROJECT LIFE12 ENV/IT/ “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.
LIFE13 ENV/IT/461 EVERGREEN Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control Start:
Westminster City Council and Westminster Primary Care Trust Voluntary Sector Funding 2009/10 Voluntary Sector Funding Eligibility, Application Form Funding,
LIFE12 ENV/IT/356 «RESAFE» « Innovative fertilizer from urban waste, bio-char and farm residues as substitute of chemical fertilizers» 6 MONTH MEETING.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
Elda – Alicante (Spain)
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Presentation European Social Fund September 19 th 2006.
VITA- Virtual Learning for the Management of successful SMEs LEONARDO DA VINCI PROJECT – TRANSFER OF INNOVATION January 2009 – December PTI-LEO
EU project LIFE13 ENV IT / “EVERGREEN” “Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases.
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
INTERIM MEETING/ VIENNA PART 1 THE STATUS of the PROJECT IMPLEMENTATION.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 29 th of April, st Steering Committee.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
RESISTVIR Work Package 1 (Project Management & Further Development) Mid-Term Meeting 7 th July 2006 Damian Cooper-Smith Chalex Research.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
Progetto: LIFE11 ENV/IT/113 «BIOREM» «Innovative System for the Biochemical Restoration and Monitoring of Degraded Soils» Start: 01/01/2013 End: 31/03/2015.
Progetto: LIFE11 ENV/IT/109 «SOREME» «Low cost sorbent for reducing mercury emissions» Start: 01/01/2013 End: 31/12/ /01/ month progress meeting.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
ACP S&T Programme - Stakeholder conference October Implemented by the ACP Secretariat Funded by the European Union EDULINK - ACP Science and.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
LIFE13 ENV/IT/461 EVERGREEN Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control Start:
LIFE13 ENV/IT/ ECODEFATTING Environmentally friendly natural products instead of chemical products in the degreasing phase of the tanning cycle Start:
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
LIFE12 ENV/IT/356 «RESAFE» « Innovative fertilizer from urban waste, bio-char and farm residues as substitute of chemical fertilizers» FINAL MEETING December,
Project Board meeting 15 th July 2011, Vilnius Kate Fernie MDR Partner This project has been funded with support from the European Commission'
WP1- Management EuroVO-DCA 1 st PCT Meeting – 3&4 May 2007 Mathias DEPRETZ – EuroVO-DCA Project Manager 1 st PCT meeting 3&4 May 2007 Strasbourg EuroVO.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 30 th of October, rd Steering Committee.
Project management and communication structure Nataša Urbančíková Faculty of Economics Technical University of Košice.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
Reporting requirements - contractual and financial issues NGO Kick-off meeting Lorenzina Bruno, Senior Financial Officer Manuel Montero Ramírez, Project.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
Project LIFE13 ENV/IT/ “Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control” “EVERGREEN”
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
LIFE13 ENV/IT/461 EVERGREEN Environmentally friendly biomolecules from agricultural wastes as substitutes of pesticides for plant diseases control Start:
Practical work (simulation) Financial forms Peter Jany.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
LIFE14 ENV/IT/113 HORTISED "Demonstration of the suitability of dredged remediated sediments for safe and sustainable horticulture production" Progress.
LIFE14 CCM/IT/ FoResMit Recovery of degraded coniferous forests for environmental sustainability restoration and climate change mitigation Monitoring.
PROJECT LIFE12 ENV/IT/ “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014.
Co-Financed by European Regional Development Fund and made possible by the INTERREG IVC MITKE Overall progress 5th Steering Group Meeting Rzeszów, 30th.
The LIFE Programme: the EU funding tool for the Environment and Climate Action Lorenzina Bruno, Senior Financial Officer EASME – C.1.6 LIFE NGO Kick-off.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 9 th of February, th Steering Committee.
LIFE12 ENV/IT/356 «BIONAD» «Naturalised dyes replacing commercial colorants for environmentally friendly leather dyeing and water recycle» Start: 01/01/2014.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Monitoring Visit to NatRisk Project
MONITORING, EVALUATION AND REPORTING
First Partners’ Meeting
Administrative / Financial guidelines
Prof. dr. Giedrius Vanagas
Legal and financial aspects of
Erasmus+ KA2 project: Enhancement of study programs in Public Health Law, Health Management, Health Economics and Health Informatics in Montenegro Administration,
EU project LIFE13 ENV IT / “EVERGREEN”
WP 1 Management and Coordination
Presentation transcript:

PROJECT LIFE12 ENV/IT/00036 “Anti-infective environmental friendly molecules against plant pathogenic bacteria for reducing Cu” “AFTER Cu” Start: 01/01/2014 End: 31/12/ /06/ Month and monitoring meeting Firenze - Italy DISPAA premises

PROJECT LIFE12 ENV/IT/00036 AGENDA 18 MONTH AND MONITORING MEETING 9:30 [DISPAA] Welcome and opening of the meeting TECHNICAL MEETING 09:40 [All] Actions carried out by each partner and scheduled activities from January 2015 until the end of May :15 [All] Coffee break 11:30 [All] After-Cu Technical future issues:  [DISPAA] Technical activities scheduled in the next six months of the project  [All] Open discussion on actions to be carried out in the next six months of the project

PROJECT LIFE12 ENV/IT/00036 AGENDA 12 MONTH MEETING 12:00 [DISPAA] Management and dissemination issues, in particular: o [DISPAA] Dissemination activities o [DISPAA] Preparation of Final Report 13:00 Lunch ADMINISTRATIVE MEETING 14:30 [EC Monitor team] After-Cu administrative documents monitor 16:30 Tour of DISPAA laboratories 17:00 End of monitoring meeting

PROJECT LIFE12 ENV/IT/00036 After-Cu PROJECT GENERAL SUMMARY

PROJECT LIFE12 ENV/IT/00036

Technical Actions carried out by each partner in the last six months  B.2 (April 2014-March 2015): Demonstration of the qualitative and quantitative yields of conventional chemical synthesis and biotechnological synthesis of the anti-virulence peptides at laboratory scale  B.3 (April 2014-March 2015): Demonstration of the chemical and biological stability of anti-virulence peptides produced by conventional chemical and biotechnological synthesis  B.4 (July 2014-June 2015): Demonstration of Kilo-scale biotechnological synthesis of the anti-virulence peptides by recombinant technology  B.5 (July 2014-June 2015): Demonstration of the null toxicity profile of the anti-virulence peptides on model organisms and microorganisms  B.6 (October 2014-December 2015): Demonstration of the anti-virulence peptides in vivo performances at pilot scale level in field screenings  B.7 (October 2014-December 2015): Demonstration of the effectiveness of the anti-virulence peptides in the presence of contamination by copper compounds at pilot scale level in field screenings.

PROJECT LIFE12 ENV/IT/00036 Technical Actions carried out by each partner in the last six months  C.2 (April 2014-March 2015): Monitoring of the in vitro anti-virulence performances of peptides at laboratory level  C.3 (April 2014-March 2015): Monitoring of the absence of side effects for the anti-virulence peptides on common targets of any living organism at laboratory level  C.4 (July 2014-June 2015): Monitoring of the absence of a direct selection operated by the anti-virulence peptides towards the emergence of bacteria resistant to the anti-virulence peptides themselves at laboratory level  C.5 (October 2014-December 2015): Monitoring of the short term environmental benefits from the use of the anti-virulence peptides in plant disease control at pilot scale level in field screenings  C.6 (October 2014-December 2015): Monitoring of the absence of an indirect selection operated by the anti-virulence peptides on copper compound and antibiotic resistant bacteria at pilot scale level in field screenings  C.7 (July 2015-December 2015): Monitoring of technical-socio-economic assessment of the After-Cu project.

PROJECT LIFE12 ENV/IT/00036 Presentations of:  DISPAA  CEBAS  ICCOMCNR  ASTRA  SOLDANO.

PROJECT LIFE12 ENV/IT/00036 [All] Open discussion on actions carried out.

PROJECT LIFE12 ENV/IT/00036 Dissemination actions D1 (July 2015-December 2015): Demonstration workshop in Italy D2 (July 2015-December 2015): Demonstration workshop in Spain D3 (January 2014-March 2014): Project website D4 (January 2014-March 2014): Notice boards D5 (September 2015-December 2015): Layman's report D6 (January 2014-December 2015): Diffusion material preparation D7 (January 2014-December 2015): Articles and press releases D8 (January 2014-December 2015): Networking D9 (April 2015-December 2015): After-Cu technology manual D10 (January 2014-December 2015): Demonstration workshop, seminars, conferences and other events D11 (January 2014-December 2015): Dissemination to Institutions and policy makers D12 (September 2015-December 2015): After-LIFE Communication Plan D13 (January 2014-December 2015): International fairs and other events D14 (January 2014-December 2015): Digital supports for international diffusion

PROJECT LIFE12 ENV/IT/00036

Dissemination actions carried out by each partner in the last six months D1 Demonstration workshop in Italy (November 2015) ASTRA will organise a demonstration workshop in November 2015

PROJECT LIFE12 ENV/IT/00036 Dissemination actions carried out by each partner in the last six months D2 Demonstration workshop in Spain (November 2015) CEBASCSIC will organise a demonstration workshop in November 2015

PROJECT LIFE12 ENV/IT/00036 Dissemination actions carried out by each partner in the last six months D3 Project website 01/02/2014 and continuous update until 31/12/2015 After-Cu website in English, Spanish and Italian: In the website:  Visit counter  Link to LIFE+  Link to each beneficiary website  Results update  News update  Coming up  Reserved area  Link with the Facebook page for event booking/registration Facebook page

PROJECT LIFE12 ENV/IT/00036 Dissemination actions carried out by each partner in the last six months D6 Diffusion material preparation 01/02/2014 and continuous update until 31/12/2015 6,000 After-Cu brochures 3,000 After-Cu plastic leaflets 7 After-Cu tissue posters in Italian and English 3 Malaga event posters 1 After-Cu roll-up 3 project presentations (English, Italian and Spanish) 500 After-Cu copybooks 800 After-Cu pens 200 After-Cu cups 500 After-Cu pendrives

PROJECT LIFE12 ENV/IT/00036 Dissemination actions carried out by each partner in the last six months D7 Articles and press releases 10/01/2014 and continuous update until 31/12/ articles directly related to After-Cu:  AGI  UNIFI website  TUTTOGREEN (insert of “La Stampa” newspaper)  Fresh Plaza  CHIMET  Ambiente BIO 4 indirect articles related to the participation of After-Cu to the CNR event (in local and web newspaper) 12 indirect articles related to the participation of After-Cu to the ASTRA and ENEA event on 22 January 2015 in local and web newspaper 3 articles (Italian, Chinese and English) in Platinum journal

PROJECT LIFE12 ENV/IT/00036 Dissemination actions carried out by each partner in the last six months D8 Networking 25/03/2014 and continuous update until 31/12/2015 Cluster with PODEBA, BIOREM, SOREME, BIONAD, GREEN SITE, SOILPRO, RESAFE, SEKRET, CLEANSED, AIS LIFE, EVERGREEN, HORTISED (LIFE projects) Specific meetings with photos with BIOREM and CLEANSED Networking contacts at the CNR LIFE event at Pisa on 25 th March 2014 Networking contacts at the UNIFI LIFE event at Firenze on 24 th October 2014 Networking contacts at the ASTRA LIFE event at Faenza on 22 th January 2015

PROJECT LIFE12 ENV/IT/00036 Dissemination actions carried out by each partner in the last six months D10 Demonstration workshop, seminars, conferences and other events 25/03/2014 and continuous update until 31/12/2015 LIFE CNR event in CNR premises on 25 March 2014 University of Siena event about life, Siena 29 May 2014 Seminar in Facultad de Ciencias - Área de Genética of Universidad de Málaga, Malaga 14 July 2014 Scuola Nazionale Metodologie Analitiche e Bioanalitiche in Spettrometria di Massa, Parma, Campus Universitario, Parma- Italy, May 2014 Corso avanzato sull'accoppiamento della spettrometria di massa con tecniche di separazione in fase liquida, Lucca, June 2014 Erice course on Biophysics of channels and transporters, Erice May 2014 Event in EEZ of CSIC in Granada (Spain) on 10 July 2014 BRIGTH 2014 AREA CNR September 26th 2014 UNIFI LIFE event at Firenze on 24 th October 2014 Italy-Kazakhstan collaboration project event in Kazakhstan on 14/11/2014 ASTRA LIFE event at Faenza on 22 th January 2015 Italy-Kazakhstan day event in Florence on 12/05/2015 Reggio Calabria LIFE workshop (10 July 2015)

PROJECT LIFE12 ENV/IT/00036 Dissemination actions carried out by each partner in the last six months D11 Dissemination to Institutions and policy makers 25/03/2014 and continuous update until 31/12/2015 All the After-Cu beneficiaries are responsible for the organisation of specific communication activities in order to disseminate the project actions and results to Institutions and policy makers. The following preliminary contacts with institutions have been taken: o Councillor for the Environment of Pisa City - Italy o Environmental Department of Pisa Area - Italy o Environmental Department of Murcia Area - Spain o Senator of the Italian Government - Italy o Assessorato Agricoltura Regione Emilia-Romagna – Italy o ENEA Manager Italy workshop (November 2015) Spain workshop (November 2015) Reggio Calabria LIFE workshop (10 July 2015)

PROJECT LIFE12 ENV/IT/00036 Dissemination actions carried out by each partner in the last six months D13 International fairs and other events 28/07/2014 and continuous update until 31/12/2015 International Congress on Phytoremediation of Polluted Soils. Vigo, July 28 – 29, th International Conference, Na,K-ATPase and related transport ATPases: Structure, mechanism, cell biology, health and disease. 30 August - 5 September 2014, The Netherlands XX National Congress Italian Society for Plant Pathology (SIPaV) Pisa, Settembre 2014 "Environmentally loyal plant protection: from nano- to field-scale“ Conference Psyringae 2015, Málaga, 2-5 June 2015

PROJECT LIFE12 ENV/IT/00036 Dissemination actions carried out by each partner in the last six months D14 Digital supports for international diffusion 01/09/2015 and continuous update until 31/12/2015 Each beneficiary started to define the specific video of each beneficiary activity DISPAA is starting to have some contacts with some expert video companies in order to organise the general structure of the video DISPAA is starting to work on the video text

PROJECT LIFE12 ENV/IT/00036  ACTION E.1: Project management  ACTION E.2: Monitoring  DISPAA has continuous contact with all project partners for monitoring project activities  Before the month end DISPAA receives from each beneficiary technical inputs for the monitor month summary  At the end of each month DISPAA prepares and sends a summary of the project activities carried out to monitoring team at the end of each month  Definition of management structures  Definition of payment procedures of each beneficiary  DISPAA organised the kick-off and progress meetings in scheduled time

PROJECT LIFE12 ENV/IT/00036  ACTION E.1: Project management  ACTION E.2: Monitoring  DISPAA defined and sent the Partnership Agreement (following the EC scheme) and collected all the beneficiaries signatures  DISPAA uses project progress indicators for monitoring project activities  DISPAA has revised the project progress indicators in each of the projects coordination meeting in order to check any irregularities  DISPAA is checking the number and type of people reached by each dissemination activity in order to check if the diffusion actions have met their goals

PROJECT LIFE12 ENV/IT/00036  ACTION E.1: Project management  Definition of management structures  Management and technical committe DISPAA: Stefania Tegli ASTRA: Vanni Tisselli SOLDANO: Maurizio Soldano CEBASCSIC: Carlos Izquierdo ICCOMCNR: Emilia Bramanti  Administrative committe DISPAA: Silvia Borselli ASTRA: Elisabetta Baldassarri SOLDANO: Domenica Timpano CEBASCSIC: Maria Teresa Hernandez ICCOMCNR: Manuela Cempini

PROJECT LIFE12 ENV/IT/00036  ACTION E.1: Project management  Definition of payment procedures of each beneficiary  Each beneficiary has a specific payment responsible DISPAA: Stefania Tegli selects the project cost formally approved by department director or DISPAA council ASTRA: Vanni Tisselli as director selects and decides till an amount of € If the cost are bigger than € the decisions are assumed in accordance with Legal Representative. SOLDANO: Maurizio Soldano as manager selects and decides CEBASCSIC: Carlos Izquierdo selects the project cost formally approved by department director ICCOMCNR: Emilia Bramanti selects the project cost formally approved by department director

PROJECT LIFE12 ENV/IT/00036  ACTION E.1: Project management  Definition of project accounting system and cost center All beneficiaries have defined the following internal specific code (codice commessa) which identify the project and all costs and income related to the project: DISPAA: B18C ASTRA: X02R14 AFTER-CU LIFE12 CEBAS: ICCOMCNR: B18C SOLDANO: After-CU For DISPAA, CEBAS and ICCOMCNR VAT is a cost.

PROJECT LIFE12 ENV/IT/00036  ACTION E.1: Project management  Definition of project accounting system and cost center All beneficiaries respects the procedure of the best value for money for selecting all the project external and consumable costs:  DISPAA, CEBAS and ICCOMCNR: public tender through MEPA  ASTRA and SOLDANO: historical supplier or market analysis All the beneficiaries approved only the costs:  directly linked to, and necessary for, carrying out the After-Cu project;  reasonable, justified and comply with the principles of sound financial management, in particular in terms of economy and efficiency;  compliant with applicable tax and social legislation; and  actually incurred during the lifetime of the project, as defined in the grant agreement, and which could be identifiable and verifiable

PROJECT LIFE12 ENV/IT/00036 After-Cu Technical future issues for the next six months  B.4 (July 2014-June 2015): Demonstration of Kilo-scale biotechnological synthesis of the anti-virulence peptides by recombinant technology  B.5 (July 2014-June 2015): Demonstration of the null toxicity profile of the anti-virulence peptides on model organisms and microorganisms  B.6 (October 2014-December 2015): Demonstration of the anti- virulence peptides in vivo performances at pilot scale level in field screenings  B.7 (October 2014-December 2015): Demonstration of the effectiveness of the anti-virulence peptides in the presence of contamination by copper compounds at pilot scale level in field screenings

PROJECT LIFE12 ENV/IT/00036 After-Cu Technical future issues for the next six months  C.4 (July 2014-June 2015): Monitoring of the absence of a direct selection operated by the anti-virulence peptides towards the emergence of bacteria resistant to the anti-virulence peptides themselves at laboratory level  C.5 (October 2014-December 2015): Monitoring of the short term environmental benefits from the use of the anti-virulence peptides in plant disease control at pilot scale level in field screenings  C.6 (October 2014-December 2015): Monitoring of the absence of an indirect selection operated by the anti-virulence peptides on copper compound and antibiotic resistant bacteria at pilot scale level in field screenings  C.7 (July 2015-December 2015): Monitoring of technical-socio- economic assessment of the After-Cu project

PROJECT LIFE12 ENV/IT/00036 After-Cu Technical future issues for the next six months [All] Open discussion on actions to be carried out in the next six months of the project

PROJECT LIFE12 ENV/IT/00036 After-Cu Dissemination future issues for the next six months  D1 Workshop in Italy: OK November 2015  D2 Workshop in Spain: OK November 2015  D3 Project website: update  D6 Diffusion material preparation: OK (foreseen 25 Posters, 10,000 leaflets/brochures/factsheets, 2,500 various branded items, now 9,000 brochures/leaflets, 10 posters, 1 roll-up, 3 presentations, 2,000 gadgets)  D7 Press and media releases: OK (foreseen 30 articles, now 25)  D8 Networking: OK OK (foreseen 10 projects, now 12)  D9 After-Cu technology manual: to be started (foreseen 1 manual)  D10 Demonstration workshop, seminars, conferences and other events: OK OK (foreseen 4 events, now 13 events)  D11 Dissemination to Institutions and policy makers: OK OK (foreseen successful communication, now 10 policy makers meetings)  D12 After-LIFE Communication Plan: to be started (foreseen 1 report)  D13 International fairs and other events: OK OK (foreseen 4 fairs, now 4 events)  D14 Digital supports for international diffusion: start (foreseen project video)

PROJECT LIFE12 ENV/IT/00036 ADMINISTRATIVE ISSUES  Final Report 31/03/2016  Next Deliverables  Partner costs May 2015  Daily rate analysis  Next meeting

PROJECT LIFE12 ENV/IT/00036 FINAL REPORT DISPAA will be responsible of the production of the Final report which will be made up by:  Progress report with the summary of technical, administrative and dissemination project issues  Dissemination Annex  Deliverables  Output indicators  Financial forms with all the originals signatures from each partner  Audit document The EC ok of the Final report will produce the project final payment from the EC

PROJECT LIFE12 ENV/IT/00036 FINAL REPORT  Documents needed from each beneficiary  DISPAA will check all the partner financial documents for final original versions with signatures from each partner DISPAA will be responsible for the production of an audit document signed by an external authorised auditor (already selected) which will certify all the project financial data. The selected auditor will check all the partner financial data and will be free to request to each partner more detailed documents.

PROJECT LIFE12 ENV/IT/00036 NEXT DELIVERABLES All the following Deliverables will be annexes of the Final Report :  Demonstration of the kilo-scale biotechnological synthesis of the anti- virulence peptides by recombinant technology: Action B.4  Demonstration of the anti-virulence peptides in vivo performances at pilot scale level in field screenings: Action B.6  Demonstration of the effectiveness of the anti-virulence peptides in the presence of contamination by copper compounds at pilot scale level in field screenings: Action B.7  Monitoring of the absence of a direct selection operated by the anti- virulence peptides towards the emergence of bacteria resistant to the anti- virulence peptides themselves at laboratory level: Action C.4  Monitoring of the short term environmental benefits from the use of the anti-virulence peptides in plant disease control at pilot scale level in field screenings: Action C.5

PROJECT LIFE12 ENV/IT/00036 NEXT DELIVERABLES All the following Deliverables will be annexes of the Final Report :  Monitoring of the absence of an indirect selection operated by the anti- virulence peptides on copper compound and antibiotic resistant bacteria at pilot scale level in field screenings: Action C.6  Monitoring of technical-economic viability of the After-Cu project: Action C.7  After-Cu technology manual: Action D.9  After-LIFE Communication Plan: Action D.12  Layman’s Report: Action D.5

PROJECT LIFE12 ENV/IT/00036 Partner costs May 2015 PARTNERCLAIM Personnel Personnel May 2015Travel Travel May 2015 External assistanc e External assistance May 2015 Consuma bles Consumabl es May 2015 Other costs Other costs May 2015 Overhea ds Overhead s May 2015TOTAL TOTAL May 2015 DISPAA , , , , , ,05 ASTRA , , , , , , ,92 Soldano , , , , ,83 ICCOMCN R , , , , , ,63 CEBAS , , , , , ,38 TOTAL , , , , , , ,81

PROJECT LIFE12 ENV/IT/00036  ACTION E.1: Project management  Beneficiary daily rate analysis

PROJECT LIFE12 ENV/IT/00036  ACTION E.1: Project management  Beneficiary daily rate analysis

PROJECT LIFE12 ENV/IT/00036 Project meetings  1st Kick off meeting in DISPAA in Italy in January 2014  Monitoring meeting in DISPAA in Italy in June 2014  2nd Coordination meeting in CEBASCSIC in Murcia (Spain) on July 7th 2014  3rd Coordination meeting in ASTRA in Italy on January 2015  4th Coordination meeting in DISPAA in Italy on June 2015 Next Project meeting  5th Final Coordination meeting in Soldano in Italy on December 2015