Office of Railroad, Pipeline and Hazardous Materials Safety Performance of the UP Train Crew.

Slides:



Advertisements
Similar presentations
1. A group of sentences 2. one main idea about a topic 3. THREE parts a. topic sentence (indented) b.supporting sentences c.concluding sentence 4. Transition.
Advertisements

SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
June 5, 1995 New York City, New York John B. Hamilton SE 6361 Z01 Advanced Requirements Engineering Fall 2012, Instructor Dr. Lawrence Chung Ph.D.
Exchange England 2011 Autor Piotr Kwiecień. Day 1 I got up very early in the morning and doing my last preparations, I came to school in Kromołów. A bus.
Miller Pipeline Corp. DRIVER SAFETY TRAINING. SECTION 1 Introduction.
EMİNE CEYHAN ERCİYES UNIVERSITY
Property-Carrying Vehicles
Review Perfect Tenses Intro Progressive Tenses April 16.
Top Seven Homework Tips and Strategies 1. Share your homework routine with a partner. Discuss positive and negative habits. 2.
CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”
Office of Railroad, Pipeline and Hazardous Materials Safety Collision of Metrolink Train 111 with Union Pacific Train LOF65-12 Chatsworth, California September.
Terminal Safety. Objectives Identify main causes Outline terminal safety organization State the safe working practices.
Transportation Tuesday TRANSPORTATION TUESDAY DO SOMEONE ELSE A GOOD TURN HOW GOOD DRIVERS DEAL WITH INTERSECTIONS.
NORTHFIELD COMMUNITY SCHOOL Elementary School Entrance Cedarbridge Road Side NORTHFIELD POLICE NJ 1.
JOB FUNCTION EVALUATION Lowering Your Accident Costs.
Clarendon, Texas May 28, 2002 Collision of Two Burlington Northern Santa Fe Freight Trains.
OPERATING SAFELY AND IN COMPLIANCE James Daulerio CDS CDT Senior Risk Consultant.
The risks of shift and extended work hours
Chapter 4 - Future Tense. Chapter 4 - Future Tense.
Hours Of Service: Are you prepared ?. Hours of Service– FMCSR Applicability: 49 CMR Part 395 – Hours of Service of Drivers Hours of Service Compliance.
Federal Aviation Regulations
Office of Railroad, Pipeline & Hazardous Materials Investigations Collision of Norfolk Southern Freight Train 192 With Standing Norfolk Southern Local.
Houston Trainwatch Working together to keep our city safe and moving Jack C. Hanagriff Houston Police Department Federal Railroad Administration Law Enforcement.
MTO Enforcement Program April, 2006 Hours of Service.
Federal Motor Carrier Safety Administration
New Jersey Transit Fatigue Risk Report Assignments for 27 th October December
NORTHFIELD COMMUNITY SCHOOL Middle School Entrance Mill Road Side NORTHFIELD POLICE NJ 1.
Office of Railroad, Pipeline and Hazardous Materials Safety Collision of Metrolink Passenger Train 111 and Union Pacific Freight Train LOF65-12 Signal.
February 2007 Commercial Vehicle Drivers Hours of Service Module 1: Overview.
■ This Training Module is designed to educate Management on FMCSA Compliance Review (CR).
TRAINING FOR MANAGERS Fatigue in Highway Construction.
Not an Official Document Training purposes ONLY 1 FEDERAL RAILROAD ADMINISTRATION Operating Practices Division For Instructional Purposes Only; for further.
Office of Railroad, Pipeline and Hazardous Materials Safety Collision of Metrolink Train 111 with Union Pacific Train LOF Opening Statement Chatsworth,
MAT Paratransit for Persons with Disabilities. Who is Eligible ADA Paratransit Eligible per Americans with Disabilities Act Persons with disabilities.
Past – Present – Future Fatigue Risk Management Symposium May 11 – 13, 2010.
Office of Railroad, Pipeline & Hazardous Materials Investigations Collision Between Two BNSF Railway Company Freight Trains Near Gunter, Texas May 19,
©2011 American Academy of Sleep Medicine. What is Drowsy Driving? Too tired to remain alert Unable to maintain focus Can fall asleep May lose control.
Office of Highway Safety Human Performance Deborah Bruce, PhD.
Situations that require a driver to yield right-of-way.
Office of Railroad, Pipeline & Hazardous Materials Investigations Right-of-Way Procedures & Safety Rules Compliance.
Traffic Engineering Studies (Travel Time & Delay Studies)
Office of Railroad, Pipeline & Hazardous Materials Investigations Macdona, Texas Operations.
GROUP RIDING REFRESHER
Get up He gets up at 6am. Get up He gets up at 6am.
PAST CONTINUOUS TENSE &
A paper presented to the International Railway Safety Conference Tokyo 2002 by Dennis Bevin Rail Accident Investigator A small sleep... a BIG problem.
ENJOYING TENSES (Student Presentation). Simple Tenses Simple Present Tense 1.The doctor is in his office. 2.Here comes the bus. 3.She always forgets her.
Jeopardy Digital 1 Digital 2Word Problems Elapsed Time Word Problems Find End Time Challenge $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 Final Jeopardy.
Office of Highway Safety Linden, New Jersey May 1, 2003.
Office of Railroad, Pipeline & Hazardous Materials Investigations Human Performance.
© 2006 PSEN Unit - #4 Let’s Go Driving Identification Evaluation Control Monitor.
Part 117 Flight and Duty Limitations and Rest Requirements: Flightcrew Members.
Office of Railroad, Pipeline & Hazardous Materials Investigations DCA-08-MR-003 Collision of Amtrak Train 371 and Norfolk Southern Railway Company Freight.
Elapsed Time Using An Open Timeline. What time will it be in 3 hours? 5:158:15.
Office of Railroad, Pipeline & Hazardous Materials Investigations Survival Factors Emergency Response.
Office of Railroad, Pipeline & Hazardous Materials Investigations Collision of a Union Pacific Railroad Freight Train with a BNSF Railway Company Freight.
FATIGUE Safet Shift Workers. Safer Roads WORKPLACE ROAD SAFETY.
National Sleep Foundation THE ROLE OF SLEEP IN THE LIFE OF A TEEN.
Driving Rules & Regulations
Top Seven Homework Tips and Strategies
School Bus and School Zone Safety
School Bus and School Zone Safety
SAFE WORK INSTRUCTIONS
Future Forms Ch. 4.
Summer Math Curse 2018 By Caleb Lease.
GCSE Mathematics Targeting Grade C Unit 3 Algebra 3 Travel Graphs.
Presentation transcript:

Office of Railroad, Pipeline and Hazardous Materials Safety Performance of the UP Train Crew

UP Crew Fatigue Work schedules, rest, and activities prior to the accident trip Performance during the accident trip

UP Conductor’s Work Schedule June 2004

UP Conductor’s Work Schedule June 18-28, 2004

UP Conductor’s Activities June 26-27, :15 PM -- Arrived home 1:00 AM -- Watched movie 4:00 AM -- Retired to bed 1:00 PM -- Got up; went out to dinner

UP Conductor’s Activities June 27-28, :00 PM -- Called CMS; watched TV 6:00 PM -- Went to friend’s home 9:00 PM -- Returned home; called CMS and went to bed 12:40 AM -- Called for the Del Rio trip 2:45 AM -- Reported for duty

Conclusion The Union Pacific Railroad conductor’s lack of sufficient rest before reporting to work, the disruption to his previous work/rest pattern that resulted from his change in work schedule, and his alcohol consumption on the evening before the accident likely combined to reduce his capacity to remain awake and alert during the accident trip.

UP Engineer’s Work Schedule June 2004

UP Engineer’s Work Schedule June 25-28, 2004

UP Engineer’s Activities June 27-28, :30 PM -- Requested 12 hours undisturbed rest 1:00 PM -- Drove to wife’s home to wait for daughter’s arrival at airport 6:00 PM -- Picked up daughter and took her back to wife’s home for dinner 8:30 PM -- Left and went to cousin’s home to play cards

UP Engineer’s Activities June 27-28, :00 PM -- Returned to an engineer’s home and went to bed 12:35 AM -- Accepted call to step-up for a trip to Del Rio 2:30 AM -- Talks with a fellow engineer at Kirby Yard 2:45 AM -- Reported for duty

Conclusion The Union Pacific Railroad engineer’s combination of sleep debt, disrupted circadian processes, limited sleep through the weekend, and long duty tours in the days before the accident likely caused him to start the accident trip with a reduced capacity to resist involuntary sleep.

Conclusion Neither the engineer nor the conductor of the Union Pacific Railroad train made effective use of the time that was available to them, between the time they were released from their previous assignments and the time they were called for the accident trip, to obtain rest.

Freight Crew Work Schedules Violate established scientific principles of scheduling Unpredictability of work schedules has unintended consequences

Conclusion The unpredictability of their work schedules may have encouraged the Union Pacific Railroad engineer and conductor to delay obtaining rest in the hope that they would not be called to work until later on the day of the accident.

UP Crew’s Performance During the Accident Trip Train not operated in compliance with signal indications and operating rules Evidence that neither crewmember was consistently attentive to his work

The Conductor’s Performance Failed to make any entries on the Conductor’s Report Form Should have prompted the engineer after approach signal passed at 45 mph Failed to intervene when stop signal came into view “What happened?”

Conclusion The conductor of the Union Pacific Railroad train was most likely asleep during much of the accident trip.

The Engineer’s Performance Anomalous speed reduction after the clear signal at Alamo Junction Proceeded over grade crossings without sounding the horn Did not slow to 30 mph after passing the approach signal Failed to dim his headlight Did not place the brakes in emergency

Conclusion The engineer of the Union Pacific Railroad train likely experienced one or more periods of microsleep early in the accident trip, and these were probably followed by a deeper descent into sleep as the train traveled past the signal at the east end of the Macdona siding.

Limbo Time Time spent awaiting transportation or in transit Neither on-duty nor off-duty time Rest period does not begin until limbo period ends Investigation examined records

Conclusion Limbo time, which is limited neither by Federal regulation nor railroad operating rules, could be a factor in crewmember fatigue in that required rest periods do not take into account the extended hours of wakefulness before the rest period begins.