Directorate-General for Regional Policy EUROPEAN COMMISSION Cohesion Policy and the water sector Eddy Hartog Head of Unit, DG REGIO EU Sanitation Policies.
Advertisements

High-Level Policy Dialogue on EU Sanitation Policies and Practices in the 2008 International Year of Sanitation Brussels, 29th January 2008 Rural Development.
AMERICAN EXPERTISE AND TECHNOLOGY IN WASTEWATER AND WATER SECTOR WASTEWATER AND WATER INVESTMENTS IN TULCEA COUNTY, ROMANIA.
THE PRIORITY PROGRAM POS ENVIRONMENT, FINANCED FROM THE COHESION FUND THE PRIORITY PROGRAM POS ENVIRONMENT, FINANCED FROM THE COHESION FUND EXTENSION AND.
I Situation of water supply and sewerage in Beijing 1. General situation of water supply business Beijing, the driest city in the world: Lack of water.
Donegal County Council – Presentation to Oireachtas Joint Committee on Environment Transport Culture and Gaeltacht County Donegal - Overview Population.
Area -10,1km2, Inhabitants – (2013) –  Shareholder – Saldus municipality  Operation area – Saldus town  Activities of Saldus Komunalserviss.
UWWT directive in Croatia – implementation and data availability
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Challenges of Urbanisation for Sanitation Infrastructure in Lesotho By : Palesa Monongoaha Project Manager - WASCO.
Danijela Banko, prof..  The amount of water per inhabitant places the Republic of Croatia among the best endowed countries in Europe  The average volume.
Improvement of the Capacity of Drinking Water Treatment Plant in East Quantara (Case Study) Dr. Eng. Ibrahim Khaled El-Sayed Chairman 1North & South Sinai.
Waste water treatment - conforming to EU Waste Water Directive study case of Tg. Mures Otto DARABAN General Director SC Compania Aquaserv SA.
European Commission, DG Environment Brussels, 05 April 2006 Screening of chapter 27 - Environment Dr. Violeta Vinceviciene European Commission DG Environment.
Titlul proiectului subtitlu EU Financing in Environmental Sector during Raluca FRATILA Ministry of Environment and Forests, Managing Authority.
„Extension and modernization of water and wastewater infrastructure in Arad County”
1 Stormwater and Wastewater in Halifax Regional Municipality Presentation to Halifax Watershed Advisory Board John Sheppard, P.Eng. Manager of Environmental.
CE HYDRAULICS ENGINEERING
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
WATER ISSUES IN THE EASTERN EUROPE:
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Lecture 1 Water Distribution Systems
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen September.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Urban Water Department of Hydro Sciences, Institute for Urban Water Management Peter Krebs Dresden, Global water aspects 1 Introduction to urban.
Romania – National Regulatory Authority for Municipal Services.
1 II. Sewer Networks and Facilities Topic. II. 12. Detention (Retention) Basins: Kinds and Structures. Sewerage Pumping Stations Detention Basins: Kinds.
DAMBOVITA COUNTY COUNCIL MODERNIZATION OF S.C. MORENI INDUSTRIAL PARK S.A. Local initiative. Regional development.
MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1.
14/10/2015European Agency for Reconstruction1 Water & environment.
Institute of Urban Water Management. Technical & Chemical Laboratory.
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen May 2008.
1 II. Sewer Networks and Facilities Topic II.1. Kinds of Wastewater. General Scheme of Sewerage. Kinds of Sewerage Schemes (Patterns) Sewerage Definition:
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Final Conference of the INTERREG III C project MunServNet October 2007, Berlin NEGOTIATION OF Z. KARACSONYI AND I. CIURSAŞ ON THE PARTICIPATION OF.
Importance Of Water Water is life. Living on the earth may be impossible without adequate water quality and quantity. Water makes up more than half of.
 Sanitation situation reflects the development of communities.  Health of people is also related to the sanitation situation.  Existing of sewerage.
Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Presentation of IBW - Estonian Delegation - 29th October 2015 Baudouin le HARDY de BEAULIEU, General Manager.
1 Public Hearing User Rate Adjustments April 8, 2008.
The Reforms In The WSS Sector In Bulgaria Eng. Ivan Ivanov President Bulgarian Water Association.
11-14 April 2011 A P A V I T A L (Iai – Romania) general overview U.S. Civil Water and Wastewater Industry Program in Romania & Moldova - BUCHAREST.
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
Ministry of Environment and Spatial Planning, Slovenia KAMNIŠKA BISTRICA river basin management plan Lille, March 2002.
DÂMBOVIŢA COUNTY COUNCIL DÂMBOVIŢA COUNTY COUNCIL Regional Development and Municipal Financing The Hilton Hotel, Bucharest, 26 th June 2008.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
24 – Wastewater Conveyance Demand Analysis April, 18, 2013 Professor Doran CEE 410.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
1 Financing in water sector - times of change Antti Tooming Ministry of the Environment / Water department, Head of Project bureau 19/05/2016.
Asset Degradation Modelling at Townsville Water
The Assessment of Water Utility's Efficiency in Libya ) Case Study (
EXERCISES Two water reservoirs are connected by a pipe 610m of 0.3m diameter, f’=0.038 and the flow produced by the difference in water surface elevations.
Water Authority of Fiji
National Administration “Romanian Waters” NARW Bucharest - Romania
WATER SUPPLY & SEWERAGE AUTHORITY Bethlehem-Biet Jala-Biet Sahour
Potable Water and Waste Water
18/11/07 Danube Water Conference 2018, Vienna, Austria
Graduation project report II Supervisor: Dr. Anan Jayousi
River Basin Management Flood protection
City of Rehoboth Beach Water and Wastewater Financial and Rates Review
Nabta Town As Smart and Sustainabile City in MENA Region
Sewerage systems: Types and comparison. Pipes
Sandro Zeničanin Ivana Torbica KP ’’Vodovod’’ a.d Gradiška
FIU Cuban Research Institute
Presentation transcript:

CONSILIUL JUDETEAN CALARASI SC COMPANIA DE APA TARGOVISTE-DAMBOVITA SA Extension and Rehabilitation of The Water and Waste Water Infrastructure in Dambovita County

Damboviţa County: County surface : 4 054 km² County population: 535.000 inhabitants out of which - urban area : 31 % - rural area : 69% Relief: plain 33%, hill 33%, mountain 34% Localities: 2 municipalities, 5 towns, 72 communes Population density: 132 loc/km2

Priority Agglomerations Identified Agglomerations Size of agglomeration (p.e.) Number of agglomerations Over 10.000 6 Between 2.000 – 10.000 56 Under 2.000 138 Priority Agglomerations Name Inhabitants (2008) P.E. estimated (2013) Targoviste 109.282 117.697 Moreni 21.020 31.000 Pucioasa 27.542 30.573 Gaesti 15.306 18.352 Titu 14.438 17.368 Fieni 9.282 11.970 Total 196.870 226.960

Regional Operating Company – SC Compania de Apa Targoviste-Dambovita SA Has been established since 31 of July 2007, through RAGC’s Targoviste transformation into a commercial company with integral public capital ; Has a number of 16 shareholders: Local Council of Targoviste (94,30546%), Local Council of Aninoasa ; Dambovita County Council (5,579776%), Local Council of Dragomiresti ; Local Council of Moreni; Local Council of Sotanga ; Local Council of Fieni; Local Council of Razvad ; Local Council of Gaesti; Local Council of Ulmi ; Local Council of Pucioasa; Local Council of Voinesti ; Local Council of Titu; Local Council of Branesti ; Local Council of Racari; Local Council of Gura Ocnitei ; By means of IDA decision nr. 1/23.01.2008, SC Compania de Apa Targoviste-Dambovita SA has been nominated as a regional operating company in Dambovita county. Since 16.06.2008, SC Compania de Apa Targoviste-Dambovita SA is operating in 2 municipalities, 5 towns and 34 communes from Dambovita County .

Existing situation in Dambovita County in terms of water supply and wastewater The situation in the water supply sector can be summarized as follows: Number of water supply systems in the urban areas – 6; The average connection rate to piped water supply in the urban area – 87%; Number of water supply systems in the rural areas – 39; The average connection rate to piped water supply in the rural area – 12%; There are only 5 Water Treatment Plants: Targoviste (not working), Pucioasa, Gaesti and 2 in rural areas. For the remaining localities the water treatment consists of chlorination only; Main deficits: Water losses caused by damages in the network; old pipes; worn-out or non-functional equipment; old or damaged structures such as reservoirs and pumping stations; chlorination facilities not in accordance with proper safety regulations

Investments justification C. Proposed investments for Dambovita County WSZ / WA Description of works Investments justification Targoviste Water sources Reabilitation and extension of Targoviste wellfields (Manesti – Gheboieni: 22 rehab. and 3 new wells; Dragomiresti Nord - Zavoi: 11 rehab. And 3 new wells) Worn out pumps, metal column corroded, valves, fittings and pipes worn and corroded, concrete wellhead in a poor state, without flow meters Trunk lines – rehabilitation Manesti - Dragomiresti Nord (L = 4,8 km, De 450mm); Dragomiresti Nord - Priseaca (L = 5,9 km, Dn 600mm) ; Priseaca – Targoviste (L = 4,08 km, Dn = 600mm) More than 30 yers old , poor condition, losses between 16% - 21% of input volume, breaks, water saved per Km between - 338 cum/day and 433 cum/day Water tanks , chlorinations plant - rehabilitation Dragomiresti North reservoir: 1 x 1200cum Priseaca reservoirs, 1 x 5000 cum and chlorination plant (Q=345 l/s) 300cum reservoir and pumping station Plastering, paints works. Inadequate chlorination plant. Priseaca reservoir presents water intrusions. Water tanks , chlorinations plant - new Priseaca rezervoir: 1 x 5000cum Existing rezervoir is broken in the middle of the building. Distribution network - rehabilitation low pressure distribution network L = 17.10 km; high pressure distribution network L = 5.40 km Old pipes, 1 - 2 breaks/month, routes trough blocks basements (High pressure net) Wastewater network – rehabilitation 8 Km rehabilitation Rehabilitation of the existing WWPS (Casa Alba) Clogged and damaged. Infiltration rate 150% In very bad conditions – frequently flooded Wastewater network – extension 5.5 Km extension 2 new WWPS Some neighborhoods or streets with WS network are not served by sewerage. Wastewater treatment Rehabilitation and extension of the existing WWTP Existing capacity is not sufficient for future requirements. No tertiary treatment. Most equipment s is worn-out and corroded

Investments justification C. Proposed investments for Dambovita County WSZ / WA Description of works Investments justification Moreni Water tanks , chlorinations plant – rehabilitation Bana reservoirs, V = 2 x 2500 cum and chlorination plant. Refurbisment to prevent water intrusion. Distribution network - extension Extention in Schela quarter, L = 7,3 km Allow the access to good drinking water . Increase the connection rate. Wastewater network – rehabilitation 3.4 km of main collector 3.2 km of secondary network The existing main collector is clogged and damaged – direct discharges in the River – 160% of infiltration. The sewerage network in the block area is clogged and damaged. Wastewater network – extension 20 km of sewerage extension 5 new WWPS Increasing connection rate from 55% to 90%. Wastewater treatment Rehabilitation and extension of the existing WWTP Existing capacity is not sufficient for future requirements. No tertiary treatment. Most equipment is worn-out and corroded Gaesti Water sources Extension of the existing Parc front of wells with 5 new wells and the trunk line to the WTP, with a total length of 2500m To cover the water demand of the town. Water tanks – new New reservoirs, V = 2 x 1000 cum The old reservoirs are very damaged 5.7 Km of main collector 1.5 Km of sewerage net. rehabilitation of the existing WWPS The existing main collector is clogged and damaged. Equipment of WWPT (pumps, pipes) are worn-out. 12.8 Km extension Increasing connection rate from 60% to 90%. Existing capacity is not sufficient for future requirements. No tertiary treatment. Most equipment s is worn-out and corroded

Investments justification C. Proposed investments for Dambovita County WSZ / WA Description of works Investments justification Pucioasa Water tanks , chlorinations plant – rehabilitation Musa reservoirs, V = 1 x 2500 + 1 x 4000 cum, and a new Cl2 chlorination plant; New reservoir in Bela quarter, V = 500 cum, and a new NaOCl chlorination plant To prevent water intrusions, rusty, unsealing. Necessary terrain consolidation works. Safety water supply. The north part of Pucioasa town will be supplied with drinking water. Assuring the water quality Water tanks , chlorinations plant - new New Cl2 chlorination plant at Branesti reservoires Assuring the water supply quality Trunk lines – rehabilitation Galma-Rateiu trunkline between Berevoiesti and Musa reservoirs, L = 4,27 km, De 280 - 315mm 40 years old pipe, hidraulic degraded pipe, water doesn't arrive to Musa reservoirs. Trunk lines – new New racord fron Galma-Rateiu trunkline to Bela reservoir, L= 0,9 km, De 125mm Extention of Galma-Rateiu raw water trunkline between Musa reservoirs and Pucioasa Sat, L = 3,83 km, De 180 - 200mm Assuring the water supply from Galma-Rateiu source To allow the acces of a part of Pucioasa to a good water quality Wastewater network – extension 26 km of sewerage extension 15 new WWPS Increasing connection rate from 26% to 93%. Wastewater treatment Rehabilitation and extension of the existing WWTP Existing capacity is not sufficient for future requirements. No tertiary treatment. Most equipment is worn-out and corroded

Investments justification C. Proposed investments for Dambovita County WSZ / WA Description of works Investments justification Fieni Water source Galma source extention: 3 new wells and extension of the existing water catchment chamber; To cover the water demand of Fieni and Pucioasa water system Trunk lines – rehabilitation Trunkline between Rateiu–Galma, L = 4,4 km, Dn 300mm Trunkline to Fieni reservoirs, L = 1,08 km, De 225mm 99 years old pipe, not buried into the ground, without thermal insulation, water saved per km - 305 cum/day. Pipe in a bad state, about 15 breaks / year Water tanks , chlorinations plant – rehabilitation Galma reservoirs, V = 2 x 1000 cum; Rehabilitation of Fieni reservoir, V = 2500 cum, and a new chlorination plant To prevent water intrusions, rusty, unsealing. To provide good quality of drinking water Wastewater network – rehabilitation 2 km of main collector; 1.6 km of secondary network The existing main collector is clogged and damaged – 175% of infiltration Wastewater network – extension 9.8 km of new sewerage network; 3 new WWPS Increasing connection rate from 57% to 97%. Wastewater treatment Rehabilitation and extension of the existing WWTP Existing capacity is not sufficient for future requirements. No tertiary treatment. Titu Distribution network – rehabilitation L = 1 km, De 140mm pipe 35 years old pipe, 11 breaks/ 2008 Distribution network – extension L = 23,75 km, (110mm to 250mm pipes) Allow the acces to good drinking water - increasing connection rate:37% to 95% 9.9 km of new sewerage network; 23 Km of vacuum sewer; 2 new WWPS and 2 new vacuum stations Increasing connection rate from 35% to 95%. Existing capacity is not sufficient for future requirements. No tertiary treatment.

Procurement Strategy Code Description Value (EUR) Tender procedure Tender period Contract start Contract end DB-TA-P&DB-01 Works at water sources of Targoviste City 6.288.796 Intl. Q3-2011 Q4-2011 Q4-2013 DB-TA-P&DB-02 Rehabilitation and Extention of WWTP Targoviste Sud 19.959.484 Q4-2010 DB-TA-RB-01 Rehabilitation and Extention of water supply and sewerage networks of Targoviste 7.814.294 DB-MO-P&DB-03 Rehabilitation and Extention of Bana rezervoirs and WWTP Moreni 9.948.711 DB-MO-RB-02 Rehabilitation and Extention of water supply and sewerage networks of Moreni 7.250.633 DB-PU-P&DB-04 Works at water sources and WWTP of Pucioasa and Fieni 16.739.753 DB-PU-RB-03 Rehabilitation and Extention of water supply and sewerage networks of Pucioasa and Fieni 8.746.180 DB-GA-P&DB-05 Works at water sources and WWTP of Gaesti and Titu 10.501.856 DB-GA-RB-04 Rehabilitation and Extention of water supply and sewerage networks Gaesti 8.500.882 DB-TI-RB-05 Rehabilitation and Extention of water supply and sewerage networks Titu 9.394.685 Q2-2011   TOTAL Yellow book 63.438.600 TOTAL R book 41.706.674 TOTAL Works Contracts 105.145.274

TA for Project Management &Works Supervision Code Description Value (EUR) Tender procedure Tender period Contract start Contract end DB-Ser-01 TA for Project Management &Works Supervision 8.858.885 Intl. Q3-2010 Q1-2011 Q4-2013 DB-Ser-03 Designer TA acc. to Law 10 808.162 Q4-2010 DB-Ser-02 Project Audit 404.081 Q2-2011 O3-2011 DB-Pro-01 Bulkmeters, leak detection 341.800 Q3-2011 Q4-2011 DB-Pro-02 Flushing truck and operational vehicles 640.000 DB-Pro-03 Procurement and Installation of SCADA equipment 1.425.500 O4-2011 Q3-2012 DB-Pro-04 Operational Endowments (ineligible costs) 1.050.000 Q1-2012 Q2-2012 Q1-2013   TOTAL Service Contracts 11.709.543

CONTACT DATA GENERAL MANAGER - ENG. RADU VASILESCU MAIL : radu CONTACT DATA GENERAL MANAGER - ENG. RADU VASILESCU MAIL : radu.vasilescu2002@gmail.com PHONE : 0040723645081 P.I.U MANAGER - ENG. CRISTIAN SGARBURA MAIL: cristian.sgarbura@catd.ro , csgarbura@yahoo.com PHONE : 0040722141374