12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider1 UAVs in ATM a cooperative approach By Göran Lindqvist LFV Group.

Slides:



Advertisements
Similar presentations
Insertion of UAS into the Spanish Airspace: Lessons learned Pablo González Brussels, 14 September 2011.
Advertisements

Unmanned Aircraft Systems EUROCONTROL ATM Integration
SIP/2012/ASBU/Nairobi-WP/19
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Air Traffic Management
Mission Trajectory Step 1 From planning to deployment.
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
ASAS TN 6-8 October 2003 GS applications in Kiruna A Swedish ADS-B validation site Göran Hasslar CNS/ATM Applications Systems Engineer.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Airpower: the Industry Vision
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
SESAR and ASAS Opportunity
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
Sense & Avoid for UAV Systems
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Time-Based Sequencing OHA CARE-ASAS Activity 3: ASM Time-Based Sequencing OHA.
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
Project Partners AUVSI North America 10 th - 14 th August 2009 Mr Reece Clothier Prof. Rodney Walker The Smart Skies Project.
SESAR Single European Sky Air traffic management Research
ATM Conference, Oslo May 19 th, 2015 ATM Master Plan 2015 Consequences for cost, safety, performance and environment.
Massachusetts Institute of Technology 4 April 2003
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
The MIDCAS Program is to be considered as one of the strategic components of the UAV Roadmap 2012 Health Monitoring ATOL Sense & Avoid Frequency Spectrum.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
ASAS TN 2.5 workshop Roma, November November NUP II+ Arlanda Surface Trials Arlanda Airport 29 SEP 2007 JAN BENGTSSON.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 NUP II+…results from different areas… …not only CPDLC and S&M Presented by Fredrik Lindblom, LFV
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Airbus Status on ADS-B In / Out Update
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Flygteknik 2010 Oct 19 MIDCAS – Sense and Avoid for UAS Bengt-Göran Sundqvist, Saab AB.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
DeSIRE Workshop, Pisa, 25-26/11/2002 1/7 A Case Study in Air Traffic Control Alberto Pasquini Deep Blue Srl.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 ASAS-SEP Applications Airborne Implementation Overall Architectural Considerations.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
High Fidelity Simulation as a Route to Certification Autonomous Systems: Legal / Regulatory Aspects and V&V Workshop 22 nd February 2016 Dr. M. Jump.
Impact of the IT Revolution on the Airspace System Dr. Philip Carrigan Strategic Programs Air Traffic Management Systems.
Second ATM R&D projects Co-ordination and networking meeting 14 Nov 2007 Advanced Remote Tower - ART A concept study of Enhanced functionalities during.
Workshop on preparations for ANConf/12 − ASBU methodology
Friends and Partners of Aviation Weather
Welcome to the SESAR SWIM Master Class 2013
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
ICAO AMCP WG-M/1 meeting, December 2000
FAA and JPDO ASAS Activities
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider1 UAVs in ATM a cooperative approach By Göran Lindqvist LFV Group

An ATS' providers and an ATCO' view and involvement in future UAV operations UAV integration with other traffic into non segregated airspace

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider3 LFV and SAAB joint Simulation studies & Workshops performed 2006/07

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider4 Cooperation Several actors jointly contributing in development of UAVs in non-segregated airspace focusing on newest ATM technology

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider5

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider6 UAV och ATM UAV development ATM system development Optimal operational usage/ business case CASTOR UAV DEMO

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider7 UAV business opportunities Cost effective Easy to operate Long endurance Certified for all types of airspace New civil markets

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider8 Missions

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider9 Civil UAV (no pic onboard!!) Well developed Autonomy Limited a/c performances Customer is on-line to receive its “products” Like to operate anywhere Asks for ATM flexibility

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider10 Single European Sky Towards a larger UAV Vision UAV Certification Rules 1.0 Euro UAV Demo Euro UAV Demo 08 Gripen Updates UAV Certification Rules 2.0 UAV Certification Rules 0.3 First Product TUMAV NEURON Castor UAV Demo UCAV Sturup Demo

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider11 The real challenge is not to make UAV’s fly, but to qualify them for operating in controlled airspace.

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider12 ATM - View Castor UAV Demo in Ostgota TMA

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider13 OSED for the Castor UAV Demo Operational Service and Environmental Description (A joint LFV and SAAB doc.) Simulations, Workshops and validation studies: Sturup UAV Demos

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider14 A Parallel process Rail #1: UAV Certification process Stimulate and Motivate close contact with the Swedish Civil Regulator Authority and the Military Flight Safety Inspectorate Rail #2: Platform and Infrastructure development Rapid prototyping, definition of onboard and ground software architecture and functional breakdown, simulations and demo´s

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider15 Simulation/Workshop executions At Malmö-Sturup by ANS Development unit In the former SATSA, now The Nordic ATS Academy building (“Entry Point North”)

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider16 Objectives Validate operational concept enabling routine flight with UAVs in all types of air-classes Gap analysis of impact on the ATM Community and on the UAV Airworthiness process, and suggest potential solutions that should be considered. Identify how further developments of the ATM infrastructure and UAV technology can improve UAV operability. Demonstrate in a simulated environment all phases that will demonstrated in flight within the 2007/2008 Castor UAV Demo:s.

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider17 Sturup UAV Demos organized into: WS1 – “Normal/Abnormal Operations” Jan-06 WS2 – “Sense & Avoid functionalities” Mar-06 WS3 – “UAV 4D-Vision” Nov-06

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider18 UCS UAV Operator UAV Simul. Control Scenario driver Saab TACSI Simulation Engine Control Link Telem. Link UAV Simulator ATC Air Traffic Controller LFV TOR/A ATS Simulation Engine Pseudo-pilots Other A/C Radar / Tower TOR/A ATS Simulator ATM & Flight Simulator connections Voice Asterix ATC Scenario driver

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider19 UCS Screens ÖKC Radar 3D View from Tower Narrator Validation Team

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider20 Observations from first Workshop On ground: Taxiing difficulties, PIC visual ”separations”, phone connection ATC-UCS? In the air: Visual holdings? Re-clearances? Approach- procedures and minima? ILS or GPS? Visual contact with RWY? Failures: data-link, comms, engine, etc; which procedure to follow!? Signal lamp?

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider21 Validation issues Simulation/WS2 + 3 * ”Sence & Avoid” functionality * Collision Avoidance – conflict management in C- resp G-airspace * TCAS/ACAS for detection of other traffic * ADS-B functionalities incl 4D trajectories * CPDLC is the service enabling ATC to directly access the UAV

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider22 Visby Sturup Landvetter Karlstad Östersund Arlanda Norrköping Bromma Umeå Sundsvall KirunaLuleå LFV ADS-B Network

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider23 CONOPS environment ADS-B –4D traj SSR/ Mode S ASAS/ 4D Safety nets Command Control(C3) System Wide information ATC/ AirportOperator Improved ”party line”, voice echo(digi) Autonomy ATC UAV controller Redundant control

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider24

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider25 Unfamiliar situations to ATM UAV forces new solutions to so far unknown behaviours of civil traffic The grade of automation in UAVs makes it necessary for ATM to treat UAV differently Large numbers of simultaneous UAV operating in same area; Long endurance… Requests changed clearances to other areas and routes then was flight-planned Data link failures; Engine and avionic failures

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider26 UAVs -like flying ”Virgins” Innocent Curious Very well equipped High precision Will bridge us into a new era of civil and military ATM

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider27 UAV – enablers for new ATM concept

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider28 Increased automation and ASAS functions Including elements ADS-B incl. 4D trajectories C DLC commands Graphic exchange of route requests and changes UAV - enablers for new ATM concept P U

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider29 Vital injection UAV can be catalyser for a fast move into ASAS vision A vision: can ATM providers down streams take an active role in also operating UAVs…?

12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider30 Be sure, UAV will share the Sky. Make it an opportunity for ASAS functionalities ! Thank you for your attention !