DET and Project Arrow Key Performance Indicators KPI1.

Slides:



Advertisements
Similar presentations
Lauren Bonilla Entech Rental Management Software Navigate 08: Charting Your Course for the Future Bank Reconciliation.
Advertisements

Using the Self Service BMC Helpdesk
MAIL NETWORK OPTIMISATION PROJECT
New initiatives in India Post An overview.2.1. The way ahead IT modernization project – India Post 2012 which is aimed at providing robust IT solution.
Using New Technologies and Approaches Pamela Bigart World Bank.
MAIL NETWORK OPTIMISATION PROJECT
Module 2 Routine operations in Speednet Module objective At the end of the module, you will be able to – Manage routine operations in Speednet.
ACCOUNTING PROCEDURE IN BRANCH OFFICES
Quality Means degree of excellence of a thing Distinctive feature of product / service Absence of any defect in the product / service Conformance to specifications.
Implementation of Management Information System (MIS) including Financial Management System (FMS) in ICAR User Acceptance Testing – Financials.
SNS SYSTEM Cooperative Society Software
Internal Controls Becoming Compliant. Design & Implementation of Internal Controls. Design: Need to show that a framework is in place to establish internal.
Short-Term Financial Management
International Financial System (IFS) Money Order [Electronic International Money Order- eIMO]
DET and Project Arrow Key Performance Indicators KPI1.
An overview e-enabled services in India Post
Operational network and history At the Directorate
Question -1  What is the norm fixed for the mail, to reach the addressee, from the last Mail office?
Core Banking Project. What is Core Banking Solution? Core Banking Solution (CBS) is networking of branches, which enables Customers to operate their accounts,
15/08/2014PTC, Mys Recurring Deposit. SB-3 and pay in slip to be filled in. The following documents are compulsory – One copy of recent photograph.
Core banking solution Introduction.
Item No. Data fieldsDefinition Application which provides the information 1Mail in Deposit (Speed Post) Opening balance of all Speed Post Articles including.
Role of manager SPC. Role of manager Understand the demography – Study the profile of walk in customers and their share of turnover over a few months.
Group Performance Management System Faculty, RTTC TVM (A Govt. of India Enterprise )
Monitoring of Mails through Performance Tool (Speed Post, Regd
Mail Network Optimization Project
ECR and Operating ratio. What is ECR? It shows how much expenditure is covered by the revenue earned by that unit Value can be less than 100 or more than.
Introduction   Business Scenario Finacle Process Overview Key Terminologies Functionalities Available Demonstration Summary.
By Saurabh Sardesai October 2014.
Financial performance of India Post: understanding annual report.
MIS and interpreting data. What is MIS?- A management information system (MIS) provides information that is needed to manage an organization efficiently.
PROJECT ARROW Project Arrow Office PERFORMANCE MONITORING 3.
Presentation on Review of the MIS for various Services and effective use of the Tools 14/02/2014.
An overview of different Departments in PO
CITIZEN CHARTER An Introduction. What is Citizen Charter? A document representing a systematic effort to focus on the commitment of the Organisation towards.
Role of MTS in Administrative Offices 1. Role of MTS at Administrative offices Tell me what are all branches in CO/RO/DO/PTC Who are the Incharge of these.
Project Arrow An introduction CONCEPTUALIZATION OF PROJECT ARROW Present Scenario 70% of India’s 1.1 billion people live in rural areas Most villages.
Introduction Practice the concept of the Management Attributes of a successful Manager Postmaster as a operational Manager Plan and anticipate challenges.
Introduction Vision & Mission of India Post Implementation of flagship Projects Ways to generate more revenue & reduce expenditure by innovative use of.
EPayment ePayment Introduction It is the process of electronic transfer of bill data between booking and payment office Department of Post collects.
1. 2 Data Extraction – Project Arrow Office Daily data of various fields of Project Arrow office is monitored at various level with the help of “Data.
Accounting and Financial Reporting Back to Table of Contents.
HUMAN RESOURSE MANAGEMENT What is HRM?. Human Resource Management in general It is managing the process of getting things done by the staff. Motivating.
1 SOFTWARE TROUBLESHOOTING. 2 SOFTWARE TROUBLE SHOOTING. POINT OF SALE S. no. PROBLEMSREMEDY 1When the Point of sale is started, it shows error “ERROR.
MIS reports An introduction 1.1. Introduction Department of Post provides access to transaction MIS on various products This helps operations to track.
Facilitator Notes: Explanation: NA More Information: NA Facilitation Tips: Discuss the general rules to be followed during the classroom session and explain.
INDIA POST INLAND PRODUCTS & SERVICES 1. Mail services 2. Financial services 3. Premium services 4. Tie ups with others 5. Philately.
Preservation of records /02/2014PTC-MYS-10, PA-ADP.
Elitser IT Solutions India Pvt. Ltd. Developed by Elitser IT Solutions India Pvt. Ltd. #301, Aditya Trade Center.
DE&T (QuickVic) Reporting Software Overview Term
 Speed bags should be sent to NSH.  89 National Sorting hubs are functioning.  Intra circle hubs are formed to cater the needs.  Sorting Hubs.
ECR and Operating ratio 1. What is ECR? It shows how much expenditure is covered by the revenue earned by that unit Value can be less than 100 or more.
RECURRING DEPOSIT ACCOUNT
An overview of different Departments in PO
India Post India Post's products and services will be the customer's first choice.
Postal Revenue Audit Slide 7.2. Postal Revenue Slide 7.2 Sale of postal articles Commission on M.Os Postage realized in cash & franking machine resetting.
T r a n s p a r e n t f a s t r e l i a b l e
National Scholarships Portal
Workshop on Speed Post – Cash on Delivery Scheme 29/08/20121CEPT Mysore.
ACCOUNT OFFICER’S BASIC TRAINING
Common Deficiencies in Voucher Level Computerisation.
Section Objectives Explain the important role accounting plays in business. Explain the accounting system for a small business. Describe the importance.
TAXCO BUSINESS SERVICES INC. Division of Des-Dawn Corporation BOOKKEEPING | PAYROLL | TAX FILING | TAX PLANNING | CONSULTING INTRODUCING TAXCO BILL PAY.
Developed by 360 Technologies Pvt Ltd. EMTTS(Express Mail Track and Trace System) is an application of Pakistan Post aimed to -Assist bookings. -Delivery.
1 Development of Cash Benefits Management Information System-CBMIS Sanja Andovska, Conditional Cash Transfers Project.
Postage Statement Wizard Mail.dat Web Services Presented by: (insert name here) The 1, 2, 3 of Electronic Postage Documentation.
Managing Office 365 Identities and Requirements.
The Budgeting Process 7. OBJECTIVE 1: Define budgeting, and explain budget basics.
User Manual Financial Accounting
MEANINGS SAP – Sales Application & Products. ECP – Enterprise Content Production. ECT – Enterprise Content Training. OEP – Object Repository Server PTM.
Presentation transcript:

DET and Project Arrow Key Performance Indicators KPI1

Explain the monitoring system built in to Project arrow Explain how the data is made available for analysis List the key performance indicators and explain their significance Explain the monitoring process List the tools available KPI2

To start with, Let us recall the Project arrow concept KPI3

Present Scenario 70% of India’s 1.1 billion people live in rural areas Most villages & small towns do not have enough connectivity /outlets to the mainstream economy Potential of India Post India Post has over 1.55 lakh post offices across India, with more than 1.25 lakh in rural areas This vast network provides a huge opportunity to connect remote areas with the mainstream Make post office the “window to the world” for ‘aam aadmi’. Project Arrow conceived in April 2008 Focus on improving the core operations of post offices & Enhancement of “look and feel” to create a unique identity KPI4

"Get the core right" "Modernize the look and feel" ScopeObjectives Make a visible, tangible, and noteworthy difference in post offices that matters to the common man Verify and certify progress on ongoing basis using clearly defined Key Performance Indicators (KPIs) for each improvement area Set the foundation for a comprehensive transformation of India post Focused efforts to significantly improve four core areas of the postal service –Mail delivery –Savings Bank –Remittances –Office service levels Broad approach to upgrade, enhance capacity and quality in –Branding –Technology –Human resource –Infrastructure KPI5

“Get the core right” Mail deliverySavings bankOffice service levelRemittances Ensure same day delivery of mail received and same day dispatch of mail collected Reduce transaction time at counters and for account transfer/closure and settlement of deceased claim cases Improve customer satisfaction along all parameters from appearance to operations Delivery of money orders on the day of receipt and providing web-enabled remittance services “Modernize the look and feel” HRInfrastructureTechnologyBranding Identify roles and job descriptions for all & design suitable training packages to enhance opera-tional and soft skills of staff Develop standardised and consistent interior and exterior blueprint and ensure uniform implementation Decide on required hardware, software and connectivity to enable post offices to provide all IT enabled services even in rural areas Ensure uniform brand hierarchy as well as consistency for all products and services KPI6

KPI7 Before And After Project Arrow

KPI8

Introduction to Project arrow Monitoring system KPI9

KPI10

Data extraction for KPI calculation KPI11

KPI12

Process is fully automated Fetches data from transactions at Post Offices A data extraction application installed in all Post Offices is run at the end of the day to upload KPI related data to central server KPIs are based on transparent data collection and logical analysis which is verifiable Tracks mail and savings bank related transactions – More emphasis on mail Data collected is also used to calculate revenue of Project Arrow offices KPI13

‘Accounts MIS client’ designed by CEPT Mysore installed in each project arrow office – both HPO and SPO is run – at the end of the day – after the close of office transaction and – generation of day’s reports The application fetches project arrow related data, creates message file and uploads to CEPT Mysore through WAN In Head Post office, a message file containing accounting information (financial transactions) is also created which also passes on to CEPT At the CEPT, accounts data is stored for MIS generation and project arrow files are forwarded to NIC server for generating dashboard reports As on date a total of Post Offices identified as project arrow offices are using the reporting mechanism everyday Proper functioning of all the PO applications is a prerequisite for successful data generation The Account MIS client application need not be physically run to exchange data - can be scheduled to perform these tasks KPI14

eMO Commi ssion Revenu e in Cash Cash Receive d from Bank/H O Bills Paid UCP Loan Receipt s Cash to HO/Ban k Loan Paymen t Renewa l Premiu m PLI/RPLI First Year Premiu m MO Paid RD Withdr awals SB deposit s SCSS Deposi ts Stamps Sales MO Issue Pensio n Payme nt UCR eMO Issue KVP/NS C Dischar ge SCSS Withdr awals SB Withdr awals KVP/N SC Issue KPI15

General ReceiptGeneral Revenue SB Receipt PLI Receipt General PaymentGeneral Expenditure SB Payment PLI Payment Reven ue in Cash Stamp s Sales FM Reven ue eMO Comm ission Cash Receive d from Bank/H O MO Issue eMO Issue Bills Paid UCP Pensio n Payme nt Cash to HO/Ba nk MO Paid SB deposit s KVP/N SC Issue SCSS Deposi ts RD Withdr awals KVP/N SC Dischar ge SCSS Withdr awals SB Withdr awals Loan Receipt s Renewa l Premiu m PLI/RPLI First Year Premiu m Death Claim Paymen t Loan Paymen t PLI/RPLI Maturit y Paymen t KPI16

Receipts of all nature like eMO Issue, MO Issue, Cash received from Bank or HO General Receipt All Revenue items like eMO Commission, Stamp Sale, FM Revenue, Revenue in Cash General Revenue Savings Bank Receipts KVP / NSC Issue, SCSS Deposits SB Deposits SB Receipts PLI /RPLI Renewal Premium,Loan Receipts, PLI / RPLI First year Premium PLI Receipts All Payments like MO Paid,Cash to HO / Bank, IPO Payment General Payments Expenditure to DoP like different Bills Paid items, Pension Payment General Expenditure RD, SB Withdrawal,SCSS Withdrawals KVP / NSC Discharge SB Payment PLI / RPLI Maturity Payments, Death Claim Payments Loan Payment PLI Payments KPI17

Project Arrow Data file is created after fetching the daily transaction data in r/o 96 fields spread across Point of Sale, Postman, Despatch, Speednet, Treasury modules (functioning applications) Once File is received at CEPT Server, list of Files received/not received is displayed in Accounts MIS Website at url : Then the Project Arrow Data file will be transmitted to NIC Server and the reports can be viewed at KPI18

Number of articles Booked in r/o different products, Amount realized Point of Sale No of articles in Deposit, Received, Issued to Postman, Undelivered, Missent in r/o different categories of articles Postman No of articles despatched Despatch Various Revenue Items like ePayment Commission, Stamps Sale, Publication Sale Treasury No of transactions of different types, Avg time for transactions, Signature Scanning Sanchay Post KPI19

Key performance indicators - Logic KPI20

Performance is measured over 19 KPIs Measurement of each Post office/circle is on a scale of 0 to 100 Each item of the KPI is assigned a weightage based on the importance of the related activity Tolerance value is prescribed for a percentage of non achievement due to known constraints Weightage is reduced for each KPI by the prescribed percentage, if the performance falls below the target value Shortfall will be subject to the maximum assigned for KPI; Tolerance is not considered in calculation KPI21

This KPI assesses the performance of the office on the following two objectives All mail received on the day should be sent out on the same day for delivery Mails issued for delivery should be delivered on the same day KPI22

The objective for these KPIs are All money orders should be eMOs All mail collected should be despatched the same day KPI23

The components for assessment of this KPI are Specimen signature must exist in electronic format for all types of accounts Number of account transfer requests not finalized should be below tolerance level and must not remain unattended for a long time Cases of claims for balances from deceased customer’s accounts should not be beyond the tolerable limits KPI24

Circle scores are affected for the following reasons In the reporting week, office is reported for less than 3 days Postman module is not operational in the reporting week Speednet module is not operational in the reporting week KPI25

Project arrow monitoring through KPI analysis KPI26

Program office at the central head quarters follows up the overall performance Program office at each circle headquarters follows up circle performance to reduce delinquencies Login available for each Postal Division and PO to monitor status The web address is: KPI27

KPI28

Reports availableDaily PO KPI sheet Circle KPI sheet PO extracted data Circle extracted data Periodical (weekly, fortnightly, date to date) Summary reports KPI reports-Mail delivery, mail dispatched and SB Delinquency Reports KPI29

KPI30

KPI31

KPI32

KPI33

KPI34

KPI35

 Project arrow performance review is through video conference  Chaired by Secretary DOP and participated by all Circle Heads  Performance review takes place based on the data collected by the program office KPI36

KPI37

1,699 (99%) Post offices reported on all working days in the week ending 3 rd Feb, as compared to 1,703 (99%) in the last review Data extracted on 7 th Feb, After hrs. Data extracted on 7 th Feb, After hrs. Delinquent Offices in the week - 3 rd Feb KPI38

KPI39

KPI40

KPI41

Post offices with less % of Signature scanned KPI42

Phase I to VI - Circle wise position of Savings Bank Accounts and Status of Signature Scanning Project Arrow VC

KPI44

Percentage of accountable mail in Deposit in the week ending 18 th July, 2014 Project Arrow VC

Questions? KPI46

Thanks KPI47