Lockout Tagout Tryout (LOTO). The purpose of the Lockout Tagout Program is to protect you. Rain for Rent incidents include employees being sprayed with.

Slides:



Advertisements
Similar presentations
BIDMC EH&S Dept1 Lockout/Tagout Training Proper Lockout Procedure BIDMC EC 60 Policy A teaching hospital of Harvard Medical School.
Advertisements

Lock Out/Tag Out Training Lock-Out/Tag-Out OSHA Definition. Lockout/Tagout (LOTO) refers to specific practices and procedures to safeguard employees.
Elements of a Lockout / Tagout Program BWC Division of Safety & Hygiene.
CONTROL OF HAZARDOUS ENERGY “LOCKOUT/TAGOUT” (LOTO)
LOCKOUT / TAGOUT How to Effectively & Efficiently Control Hazardous Energy LOTO Presentation – Worker, 9/2004.
Lockout/Tagout (LOTO):
Presented by Environmental Health and Safety
LOCKOUT/TAGOUT.
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
Lockout/Tagout Authorized Employee. What Is Hazardous Energy? –Often invisible –Can be hydraulic or mechanical –Live or stored –Moving machine or equipment.
Lockout-Tagout (Control of Hazardous Energy) This training program is designed to inform management of the requirements of the Lockout-Tagout Program for.
Lockout/Tagout (The Control of Hazardous Energy)
Controlling Hazardous Energy
Control of Hazardous Energy – Lockout/Tagout 29 CFR
Lockout/Tagout Training for Authorized Employees Murray State University.
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation “Imagine yourself performing maintenance inside of a machine and suddenly,
Lockout - Tagout Control of Hazardous Energy CFR
Lockout Tag out Training2009. Control of Hazardous Energy Policy Personal locks & keys will be issued to employees by their Safety/Training Coordinator.
Lockout / Tagout Control of Hazardous Energy
Lockout/tagout Authorized employees
Lockout/Tagout Affected Employees. © Business & Legal Reports, Inc Session Objectives You will be able to: Recognize hazardous energy sources Carry.
Lockout/Tagout Authorized Employee Slide Show Notes
Oklahoma State University EHS Lockout/Tagout Standard Proper Lockout Procedure.
Trindel Insurance Fund
Control of Hazardous Energy Lockout/Tagout 29 CFR
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
/0309 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lockout/Tagout Refresher 29 CFR
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
Standard 29 CFR Part Lockout / Tagout. Lockout/tagout agenda In today’s presentation, we will discuss the following: Terminology Energy sources.
Lockout/Tagout for Affected Employees Understand the Basics.
Lockout/Tagout Training Division of Facilities Construction and Management 2001.
Lockout Tagout Tryout (LOTO)
Lock-Out / Tag-Out Types of Energy Types of Energy Electrical Electrical Mechanical Mechanical Chemical Chemical Thermal Thermal Hydraulic Hydraulic.
Safety on Call LOCKOUT / TAGOUT. Safety on Call WHAT IS LOCKOUT/TAGOUT? A method of keeping equipment from being set in motion and endangering workers.
Peoplefirst-us.com. Photos shown in this presentation may depict situations that are not in compliance with applicable OSHA/MSHA/FHWA requirements.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
Control Of Hazardous Energy
Lockout/Tagout Authorized Employees: Learn the Procedures.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
A PRESENTATION ON LOCKOUT/ TAGOUT” (LOTO) BY ORILOYE JIDE 13/03/2015
LOCKOOUT/TAGOUT b THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or.
Lockout/Tagout.
Copyright © 2012 American Safety Management Inc. Lockout Tagout.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
Lockout Tagout Tryout (LOTO)
Confined Spaces 29 CFR is the OSHA regulation that requires employers to protect employees in general industry from the hazards of entering a.
Control of Hazardous Energy 29 CFR Lockout/Tagout Basics? Regulatory requirements Energy Isolation Devices Energy Sources Affected, Authorized.
© BLR ® —Business & Legal Resources 1408 Lockout/Tagout Authorized Employee.
1 Lockout/Tagout MEETING THE STANDARD MEETING THE STANDARD.
1 Lockout/Tagout “The Control of Hazardous Energy” LOTO Lockout Tagout.
LOCKOUT – TAGOUT TRAINING PROGRAM. Lockout/Tagout + The OSHA Standard for the Control of Hazardous Energy (Lockout/Tagout) 29 CFR covers the.
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management Lock Out Tag Out Affected Employees.
Lockout Tagout Procedures Why? MoManufacturingWINs Precision Machining Technology ME 100 – Measurement, Materials & Safety.
CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TRYOUT). LOCKOUT/TRYOUT The OSHA Standard for the Control of Hazardous Energy (Lockout/Tryout) 29 CFR covers.
LOCKOUT/TAGOUT AUTHORIZED EMPLOYEES. Hazardous Energy Sources + Evaluate machines, equipment, and processes + Develop energy control plan 1a.
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
29 CFR  In this course, we will cover the following:  The need for energy control procedures  Methods of lockout / tagout  Employer’s responsibilities.
Lockout Tagout Tryout (LOTO) And Hazardous Energy.
Lockout/tagout for authorized employee
LOCKOOUT/TAGOUT THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or.
Lockout/Tagout Standard
Lockout/tagout Refresher training
Energy Control (Lockout/Tagout)
Energy Control Procedures Lockout/Tagout 29 CFR
Control of Hazardous Energy
Presented by Environmental Health and Safety
Lock Out Tag Out.
Lockout/tagout Refresher Training
Presentation transcript:

Lockout Tagout Tryout (LOTO)

The purpose of the Lockout Tagout Program is to protect you. Rain for Rent incidents include employees being sprayed with untreated sewage, chlorine and other chemicals while working on systems they thought to be under no pressure.

Application of LOTO When an employee is doing any of the following: –Remove or bypass a guard or other safety device (i.e. bandsaw blade replacement) –Put any part of his or her body into an area on a machine or piece of equipment where work is performed (i.e. pump or engine maintenance) –Is in an associated danger zone during a machine operating cycle (i.e. installing or removing a piping system)

Types of Energy requiring lockout Electrical Mechanical Chemical Thermal Hydraulic Pneumatic Other pressurized systems

Use of Locks & Tags Use only items that have been issued to you Never use another employees lock Your name must be clearly marked on your LOTO Lock. This can be done by –Etching your name or employee number in the lock –Using a tag that is attached to the lock It is recommended you also put your cell phone number on the lock as well.

6 Step LOTOTO Procedure Prepare for Shutdown Shutdown Equipment Isolate all Energy Sources Release Stored Energy Place Locks & Tags Verify Equipment Isolation (Try Out)

Exceptions to LOTO Cord & plug connected equipment –Plug is only source of energy –Plug is under continuous control of one person

LOTO Equipment

Kits Fastenal part number

Locks Yellow locks are for equipment when using a LOTO Box Red Locks are for people. Every person who is working on the equipment or could be exposed to the hazard needs to be locked out using a red lock.

Lock labels This can be done using a tag attached to the lock or by writing/etching on the lock. Every personal lock (Red lock) must be labeled for who is using that lock. It is recommended that both a name and Phone number be placed on the lock

Group Lockout/Tagout Frequently more than one person will work on a piece of equipment. In such cases each person should attach his or her lock to the equipment. Hasps can hold several locks at a time. This protects everyone working on the equipment since the equipment can’t be energized until every lock has been removed.

Group Lockout/Tagout Equipment can be locked out using a yellow equipment lock Equipment keys can then be placed in a LOTO Box Continued on next slide

Group Lockout/Tagout Personal locks can then be placed on the LOTO Box Additional Keys may be added to the LOTO Box as needed End result All employees are locked out on all equipment who’s keys are in the box. Each employee only needs one person lock to lock out several items

Cable System Open device and insert cable in direction of arrow. Note cable can be tightened, but not loosened, with locks applied.

Locking out a Pump OR The picture at bottom allows others to lock out without the need for the first lock to be removed.

Locking out a valve Many valves are designed to be locked out easily.

Unable to get a hasp or lock in due to how far the hole is from the edge. However a cable will work.

It is important that this device slides over the angled part of the valve. If this device will not, another LOTO device needs to be used.

Too big for what was used in the last slide Simple two piece device that slips over the handle

No place to lock out? The cable systems allow for a variety of valves.

Where to lock out

Release from LOTO Inspect Area & Equipment Ensure all Machine Guards are in place Move tools away from equipment Inform others of pending startup Restore system connections Remove Locks & Tags Conduct normal startup

Lock Removal An employee may leave for the day and accidently leave a lock on; what do we do now? If a lock needs to be removed by anyone other than the owner of that lock Appendix C – Lock removal form MUST be used. (Recommended a copy of this form be kept in each vehicle) The purpose of the form is to contact the employee and ensure their safety prior to removing their lock. (This is why a phone number on each lock is recommended) Next slide has example of form

Example of Lock Removal Form

Contractors ALL contractors on Rain for Rent property must follow LOTO procedures! Rain For Rent Employees must lockout before any contractor and must be the last to remove a lock. –This prevents a contractor from disconnecting or energizing systems without Rain for Rent knowledge or presence.

In the back of the policy is a flow chart on how to conduct LOTO

Appendix B – LOTO Form & Plan For complex projects Appendix B is a tool to help plan and communicate what is needed for LOTO on that project.

Summary All hazardous energy sources must be controlled and stored energy released Control via energy isolation device (LOTO) Only use designated lock for LOTO All personal locks need to be labeled for whose lock it is Remember to verify isolation Ensure area is clear before restarting equipment

Additional Resources LOTO hard hat stickers – Hard-Hat-Labels-LOTO-Authorized- 15Y471?Pid=searchhttp:// Hard-Hat-Labels-LOTO-Authorized- 15Y471?Pid=search LOTO Posters – Training-Poster-1D302?Pid=searchhttp:// Training-Poster-1D302?Pid=search